Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Collingbourne Ducis521Collingbourne Ducis STWNo measure
Hanging Langford519Great Wishford STWNo measure
Tisbury Nadder Close Playing Fields166Tisbury STWNo measure
Tilshead Camp Road148Tilshead STWNo measure
Warminster Weymouth Street R/o 23 in Pleasure Gardens Near Swimming Pool117Warminster STWNo measure
Coate Spaniels Bridge71All Cannings STWNo measure
All Cannings67All Cannings STWNo measure
Allington Old Inn57Hurdcott STWNo measure
Warminster Calveswater57Warminster STWNo measure
Bournemouth Iford Lane36Christchurch STWNo measure
Hindon the Dene34Hindon STWNo measure
Chirton Small Street34Marden STWNo measure
Bournemouth Tuckton Road O/s 15632Bournemouth (holdenhurst) STWNo measure
North Newnton30Upavon STWNo measure
Patney Weir26Marden STWNo measure
Marden High Street14Marden STWNo measure
Barford St Martin13Barford St Martin STWNo measure
Chilmark13Tisbury STWNo measure
Pewsey Wilcot Lodge7Pewsey STWNo measure
Hurdcott7Hurdcott STWNo measure
Bournemouth Iford Lane Tuckton4Bournemouth (holdenhurst) STWNo measure
Horton Horton Farm4All Cannings STWNo measure
Warminster George St2Warminster STWNo measure
Maiden Bradley Off Kingston Lane2Maiden Bradley STWNo measure
Bransgore Wiltshire Gardens1Christchurch STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.