Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
The Storm Overflows Discharge Reduction Plan covers England only. The Gwendraeth Fach and Fawr is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Trimsaran Wwtw Inlet Storm Overflow DCWW1899 | 2050 | 132 ·22 | 128 0 events | -3% | 12.8× | Falling — behind | |
| Pembrey Wwtw Storm Overflow DCWW194 | 2050 | 49 ·22 | 121 0 events | +147% | 12.1× | Rising | |
| Mynydd Cerrig Storm Overflow DCWW1176 | 2050 | 92 ·22 | 106 0 events | +15% | 10.6× | Rising | |
| Parc Y Dai No1 Drefach Storm Overflow DCWW1155 | 2050 | 57 ·22 | 98 0 events | +72% | 9.8× | Rising | |
| Porthyrhyd Storm Overflow DCWW1115 | 2050 | 77 ·22 | 94 0 events | +22% | 9.4× | Rising | |
| Llanddarog Overflow DCWW1228 | 2050 | 56 ·22 | 90 0 events | +61% | 9× | Rising | |
| Clos Isaf Storm Overflow DCWW649 | 2050 | 59 ·22 | 83 0 events | +41% | 8.3× | Rising | |
| Pontyberem Storm Overflow DCWW1124 | 2050 | 49 ·22 | 68 0 events | +39% | 6.8× | Rising | |
| Pontyates Heol Y Meinciau Storm Overflow DCWW1125 | 2050 | 42 ·22 | 63 0 events | +50% | 6.3× | Rising | |
| Cefneithin Road Gorslas Storm Overflow DCWW1015 | 2050 | 65 ·22 | 57 0 events | -12% | 5.7× | Falling — behind | |
| Tycoch Storm Overflow DCWW1530 | 2050 | 41 ·22 | 55 0 events | +34% | 5.5× | Rising | |
| Maerdy Bridge Storm Overflow DCWW2327 | 2050 | 65 ·24 | 54 0 events | -17% | 5.4× | Falling — behind | |
| Parc Y Dai No 2 Drefach Storm Overflow DCWW1156 | 2050 | 64 ·22 | 50 0 events | -22% | 5× | Falling — behind | |
| Cwm Mawr Heol Cwmbach Storm Overflow DCWW2205 | 2050 | 29 ·22 | 42 0 events | +45% | 4.2× | Rising | |
| Station Road Kidwelly Overflow DCWW2287 | 2050 | 14 ·22 | 35 0 events | +150% | 3.5× | Rising | |
| Pembrey Links Storm Overflow DCWW1992 | 2050 | 10 ·22 | 31 0 events | +210% | 3.1× | Rising | |
| Next to Heol Y Meinciau Bridge Pontyates Storm Overflow DCWW1166 | 2050 | 12 ·22 | 24 0 events | +100% | 2.4× | Rising | |
| Ponthenri Storm Overflow DCWW1129 | 2050 | 9 ·22 | 18 0 events | +100% | 1.8× | Rising | |
| Cwm Capel Overflow DCWW1798 | 2050 | 1 ·22 | 17 0 events | +1600% | 1.7× | Rising | |
| Heol Ddu Storm Overflow DCWW1777 | 2050 | 2 ·22 | 16 0 events | +700% | 1.6× | Rising | |
| Ashburnham Storm Overflow DCWW311 | 2050 | 19 ·22 | 7 0 events | -63% | 0.7× | Within the cap | |
| Llangyndeyrn Storm Overflow DCWW1211 | 2050 | 0 ·22 | 4 1 events | — | 0.4× | Within the cap | |
| Llangyndeyrn Wwtw Storm Overflow DCWW1210 | 2050 | 1 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Trimsaran Heol Llanelli Storm Overflow DCWW2235 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →