Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Gower streams is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

21
Above the 2050 cap
of 32 tracked
17
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
11
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Newton Road Overflow
DCWW210
205079 ·22
97
0 events
+23%9.7×Rising
Blodwen Terrace Storm Overflow
DCWW694
205085 ·22
90
0 events
+6%9×Rising
Llanrhidian Ps Overflow
DCWW1928
20500 ·22
73
0 events
—7.3×Rising
Newton Road Swansea Overflow
DCWW209
20509 ·22
71
0 events
+689%7.1×Rising
Parkmill Overflow
DCWW2318
205084 ·24
44
0 events
-48%4.4×Falling — behind
Frogmore Storm Overflow
DCWW2097
20504 ·22
38
0 events
+850%3.8×Rising
Chapel Road Crofty Storm Overflow
DCWW2212
205011 ·22
30
0 events
+173%3×Rising
The Nook Oxwich Storm Overflow
DCWW2378
20500 ·22
26
0 events
—2.6×Rising
Junction of the Dunns And Mumbles Road the Mumbles Storm Overflow
DCWW368
205021 ·22
26
0 events
+24%2.6×Rising
Llangennith Hillend Storm Overflow
DCWW326
20500 ·22
25
0 events
—2.5×Rising
Scurlage Overflow
DCWW2291
2050121 ·24
24
0 events
-80%2.4×Falling — behind
Gower Road Upper Killay Storm Overflow
DCWW1269
20506 ·22
21
0 events
+250%2.1×Rising
Hen Parc Lane Overflow
DCWW584
205019 ·22
21
0 events
+11%2.1×Rising
Furzeland Drive Sketty Storm Overflow
DCWW344
205031 ·22
20
0 events
-35%2×Falling — behind
Bishopston Wwtw Storm Overflow
DCWW29
205011 ·22
18
0 events
+64%1.8×Rising
Crofty B North of Trading Estate Storm Overflow
DCWW996
20503 ·22
18
0 events
+500%1.8×Rising
Benson Road Storm Overflow
DCWW1051
20501 ·22
15
0 events
+1400%1.5×Rising
Westbury Street Storm Overflow
DCWW2317
20500 ·24
14
0 events
—1.4×Rising
Sketty Park Drive Storm Overflow
DCWW354
20503 ·22
12
0 events
+300%1.2×Rising
Norton Road Storm Overflow
DCWW360
205023 ·22
11
0 events
-52%1.1×Nearly there
New Well Lane Overflow
DCWW211
20500 ·22
11
0 events
—1.1×Rising
Limeslade Overflow
DCWW16
20508 ·22
5
0 events
-38%0.5×Within the cap
Elmgrove Road Swansea Storm Overflow
DCWW63
20504 ·22
3
0 events
-25%0.3×Within the cap
Amy Dillwyn Close Storm Overflow
DCWW350
20503 ·22
2
0 events
-33%0.2×Within the cap
Byng Morris Close Sketty Storm Overflow
DCWW348
205040 ·22
1
0 events
-98%0.1×Within the cap
Overton Wwtw Storm Overflow
DCWW203
20500 ·22
1
0 events
—0.1×Within the cap
Liliput Lane Swansea Storm Overflow
DCWW366
20500 ·22
0
0 events
—0×Within the cap
Bishopston Overflow
DCWW1981
20500 ·22
0
0 events
—0×Within the cap
Brynymor Road Storm Overflow
DCWW2296
20502 ·22
0
0 events
-100%0×Within the cap
Caswell Road Caswell Overflow
DCWW28
20500 ·22
0
0 events
—0×Within the cap
Reynoldston Wwtw Storm Overflow
DCWW494
2050116 ·22
0
0 events
-100%0×Within the cap
Cheriton Overflow
DCWW2190
205030 ·22
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →