What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100128a · 6ed6f479 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ BISHOPSTON STS BRANDY COVE LANE | Complete 2025-26 | Bishopston WwTW Storm Overflow |
| DCWW100285a · e2a02dbb | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANRHIDIAN STW LLANRHIDIAN | Complete 2025-26 | Llanrhidian PS Overflow |
| DCWW100322a · 287402a7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ OVERTON STW PORT EYNON | Complete 2025-26 | Overton WwTW Storm Overflow |
| DCWW100357a · fbec5c3f | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ REYNOLDSTON WASTEWATER TREATMENT WK | Complete 2025-26 | Reynoldston WwTW Storm Overflow |
| DCWW100426a · 15ed3cbb | W_SSSI_NDINV1 | Investigation | Investigation of water company activities, permits or licence conditions to prevent deterioration of a SSSI and its features to meet / sustain Favourable Condition Biodiv Oxwich Bay SSSI Sewer Network Investigation (Safle unit ID 3991) | Due 2026-27 | Water body only |
| DCWW102596a · ac3addcb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ 2 Blodwen Terrace, Penclawdd CSO | Due 2029-30 | Blodwen Terrace Storm Overflow |
| DCWW102402a · 050e1cb5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ADJ TO SPS RAILWAY INN GOWER RD KILLAY | Due 2029-30 | Gower Road Upper Killay Storm Overflow |
| DCWW102750a · 0972034e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BISHOPSTON STW | Due 2029-30 | Bishopston WwTW Storm Overflow |
| DCWW102730a · 18ad2ac9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRYNYMOR ROAD SWANSEA | Due 2029-30 | Brynymor Road Storm Overflow |
| DCWW100875a · 0d946ced | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Caswell Bay Car Park SPS | Due 2029-30 | Caswell Road Caswell Overflow |
| DCWW100879a · 43879ba7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CEFN CELYN SPS, CEFN CELYN, DUNVANT, SWANSEA sa2 7tu | Due 2029-30 | Water body only |
| DCWW101140a · ebbbeeff | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO & EO at Knelston PS | Due 2029-30 | Frogmore Storm overflow |
| DCWW101582a · 5654c414 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Fairwood Road, Swansea | Due 2029-30 | Swansea Fairwood Road Storm Overflow |
| DCWW101100a · b2ce6280 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FOUL PUMP STATION, MILLWOOD GARDENS, KILLAY, SWANSEA, SA2 7BE | Due 2029-30 | Water body only |
| DCWW100946a · e453ca12 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HEN PARC LANE SEWAGE PUMPING STATION, ADJACENT TO 33 HEN PARC LANE, UPPER KILLAY, SWANSEA | Due 2029-30 | Hen Parc Lane Overflow |
| DCWW101582a · 1ac9a914 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HILLEND LLANGENNITH P.S. SSO | Due 2029-30 | Llangennith Hillend Storm Overflow |
| DCWW101033a · 1b932649 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ HOLYTHORNE (CROFTY 'B' SPS) OVERFLOW | Due 2029-30 | Crofty B North of Trading Estate Storm Overflow |
| DCWW101081a · b748d82c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ KILLAY SEWAGE PUMPING STATION, OFF GOWER ROAD, KILLAY, SWANSEA | Due 2029-30 | Gower Road Upper Killay Storm Overflow |
| DCWW102779a · 455c5023 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ KNELSTON ABOUT 50YDS BELOW SHELL GARAGE | Due 2029-30 | Frogmore Storm overflow |
| DCWW101095a · 9e53a78f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Langland Sewage Pumping Station | Due 2029-30 | Langland Bay Swansea Overflow |
| DCWW102780a · 0fca7cb7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LIMESLADE BAY PS (BRACELET BAY) | Due 2029-30 | Limeslade Overflow |
| DCWW101142a · c19c3e47 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Limeslade SPS | Due 2029-30 | Limeslade Overflow |
| DCWW100871a · 490706e7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANMADOC SPS NO. 1 EMERGENCY DISCHARGE | Due 2029-30 | Cheriton Overflow |
| DCWW100872a · 66f4b919 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANMADOC SPS NO. 2 EMERGENCY DISCHARGE | Due 2029-30 | Cwm Ivy Overflow |
| DCWW101582a · 56cb66be | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANRHIDIAN PS EMERG , , | Due 2029-30 | Llanrhidian PS Overflow |
| DCWW100944a · 56c2f120 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANRHIDIAN PS EMERGENCY | Due 2029-30 | Llanrhidian PS Overflow |
| DCWW102737a · e456009b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mayals Road CSO, Swansea | Due 2029-30 | Mayals Road Storm Overflow |
| DCWW101141a · 8cc3db49 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NEW CROFTY 'C' SPS | Due 2029-30 | Chapel Road Crofty Storm Overflow |
| DCWW100947a · 53cb83e5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NEW PENCLAWDD SPS | Due 2029-30 | Penclawdd Into Loughor Estuary Storm Overflow |
| DCWW101582a · 221b534a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ OVERTON STW PORT EYNON | Due 2029-30 | Overton WwTW Storm Overflow |
| DCWW100426b · 2457c052 | W_SSSI_NDIMP1 | Improvement | Implement actions from Investigation to prevent deterioration of Oxwich Bay SSSI (Site of Special Scientific Interest) and its features to restore Favourable Condition Biodiv Oxwich Bay SSSI Sewer Network Implementation (Safle Unit ID 3991) | Due 2029-30 | Water body only |
| DCWW101023a · b6549074 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Pennard SPS | Due 2029-30 | Pennard Overflow |
| DCWW100949a · 0db1a914 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Scurlage SPS | Due 2029-30 | Scurlage Overflow |
| DCWW101582a · 59d2d434 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Singleton Park Point 24 CSO | Due 2029-30 | Singleton Park Storm Overflow |
| DCWW100997a · b38ed6b5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SPS OFF DUNVANT RD/HENDRE FOILAN RD SWANSEA | Due 2029-30 | Water body only |
35 of 35 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.