DonateLog in
River Hub
Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Bron Castell Storm Overflow3Llanbedr STWMeasure linked
Snowdon Street Storm Overflow3Porthmadog STWMeasure linked
Aberdesach Storm Overflow2PontllyfniNo measure
Cambrian View Penrhyndeudraeth Storm Overflow1Penrhyndeudraeth STWNo measure
Glanypwll Road Storm Overflow1B/au Fes STWNo measure
Taleymerau Pwllheli Storm Overflow1Pwllheli (new Works)No measure
Chapel Street Porthmadog Storm Overflow1Porthmadog STWMeasure linked
Aberdaron Storm Overflow1AberdaronMeasure linked
Stryd Y Felin Storm Overflow1Morfa NefynMeasure linked
A470 A4212 Junction Storm Overflow1Trawsfynydd (frongaled)Measure linked
Llwyn Y Gell Road Ffestiniog Storm Overflow1B/au Fes STWMeasure linked
Tremadog Iscraig Storm Overflow1Porthmadog STWMeasure linked
Y Maes Pwllheli Storm Overflow1Pwllheli (new Works)Measure linked
Ffordd Penllach Storm Overflow1Llanbedr STWMeasure linked
Harlech Storm Overflow1Llanbedr STWMeasure linked
Porthmadog Britannia Place Storm Overflow1Porthmadog STWMeasure linked
Glan-y-don Pwllheli Storm Overflow1Pwllheli (new Works)Measure linked
Abersoch Harbour Storm Overflow1AbersochMeasure linked
Lombard Street Bank Place Porthmadog Storm Overflow1Porthmadog STWMeasure linked
Clynnog Fawr Storm Overflow1PontllyfniMeasure linked
Gimblet Rock Storm Overflow1Pwllheli (new Works)Measure linked
Maentwrog Storm Overflow1MaentwrogMeasure linked
Borth-y-gest Storm Overflow1Porthmadog STWNo measure
Llanbedrog Long Nant-iago Storm Overflow1Pwllheli (new Works)Measure linked

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.