A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

113
Measures in this catchment
NEP, current record
91
Still active
not yet past their date
22
Assumed complete
completion date has passed
18
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100110a · 4d273138W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ABERDARON WASTEWATER TREATMENT WKS
Complete 2025-26Aberdaron Storm Overflow
DCWW100065a · d2c7f4f4W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
ABERERCH WWTW
Complete 2025-26Abererch WwTW Storm Overflow
DCWW100115a · a66735d5W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
AFONWEN
Complete 2025-26Afonwen WwTW Storm Overflow
DCWW100066a · 489d3364W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BEDDGELERT WASTE WATER TREATMENT
Complete 2025-26Beddgelert WwTW Storm Overflow
DCWW100129a · a4d84418W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
BLAENAU FFESTINIOG WWTW
Complete 2025-26Blaenau Ffestiniog WwTW Point 1 Storm Overflow
DCWW100162a · 2b173649W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CHWILOG STW
Complete 2025-26Chwilog WwTW Storm Overflow
DCWW100177a · 5e496a6dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CRICCIETH STW FINAL
Complete 2025-26West Parade Criccieth Overflow
DCWW100211a · f1f3d054W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
Fourcrosses STW
Complete 2025-26Four Crosses WwTW Storm Overflow
DCWW100214a · 978877bdW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
GARNDOLBENMAEN STW
Complete 2025-26Garndolbenmaen WwTW Storm Overflow
DCWW100216a · df49bf26W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
GELLILYDAN STW
Complete 2025-26Gellilydan WwTW Settled Storm Overflow
DCWW100226a · 22969098W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
HARLECH MAIN SPS
Complete 2025-26Harlech Storm Overflow
DCWW100259a · cba0ee5dW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANERCH-Y-MOR
Complete 2025-26Stryd Y Felin Storm Overflow
DCWW100081a · 7013cc61W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANFFESTINIOG STW
Complete 2025-26Llan Ffestiniog WwTW Inlet Storm Overflow
DCWW100295a · a91f0fffW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLANYSTUMDWY A WWTW
Complete 2025-26Llanystumdwy WwTW Storm Overflow
DCWW100101a · a9663ecfW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LLITHFAEN STW
Complete 2025-26Llithfaen WwTW Storm Overflow
DCWW100314a · 1f90e601W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MYNYTHO STW - STORM OVERFLOW
Complete 2025-26Mynytho WwTW Storm Overflow
DCWW100090a · 7433756bW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
NEFYN WWTW
Complete 2025-26Nefyn WwTW Inlet PS (Discharge Point A) Storm Overflow
DCWW100091a · 14cc11caW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PENRHOS CAMP STW - SCREENED ST
Complete 2025-26Penrhos Camp WwTW Storm Overflow
DCWW100333a · 10395080W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PENRHYNDEUDRAETH WWTW FE
Complete 2025-26Penrhyndeudraeth WwTW Settled Storm Overflow
DCWW100349a · 72d6affaW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PORTHMADOG WWTW
Complete 2025-26Porthmadog WwTW Tank Overflow
DCWW100352a · 1474235aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PWLLHELI STW GIMBLET ROCK SITE
Complete 2025-26Gimblet Rock Storm Overflow
DCWW100099a · 923df04fW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
TRAWSFYNYDD STW
Complete 2025-26Maes Gwyndy Trawsfynydd Storm Overflow
DCWW100201a · 17015967W_U_MON4Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows
WQ
EFAILNEWYDD
Due 2026-27Efailnewydd WwTW Storm Overflow
DCWW102224a · 394ae6ffW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Maentwrog SWK SSO
Due 2026-27Maentwrog WwTW Storm Overflow
DCWW102219a · ef68e90aW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PORTHMADOG BORTH-Y-GEST PS
Due 2026-27Amanda Terrace Storm Overflow
DCWW101647a · b45fc64eW_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper
WQ
Efailnewydd STW (7CDC1096)
Due 2027-28Water body only
DCWW101651a · 122093f7W_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper
WQ
SARN MEILLTEYRN STW (7CDC0937)
Due 2027-28Water body only
DCWW101652a · 4108d498W_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper
WQ
SARN STW (7CDC0938)
Due 2027-28Water body only
DCWW100627a · 64d34d34W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
BEDDGELERT
Due 2027-28Beddgelert WwTW Storm Overflow
DCWW100629a · 790d3756W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
BLAENAU FFESTINIOG
Due 2027-28Blaenau Ffestiniog WwTW Point 1 Storm Overflow
DCWW100688a · 69bcf7beW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANYSTUMDWY (W PORTHMADOG) A
Due 2027-28Llanystumdwy WwTW Storm Overflow
DCWW100651a · ad6efe52W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
LLANYSTUMDWY (W PORTHMADOG) A
Due 2027-28Llanystumdwy WwTW Storm Overflow
DCWW102241a · 40499670W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERDARON WORKS STW CSO
Due 2029-30Aberdaron WwTW Storm Overflow
DCWW100626a · f27c9909W_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
ABERERCH
Due 2029-30Abererch WwTW Storm Overflow
DCWW101200a · 2560a0caW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ABERSOCH HARBOUR PUMPING STATION
Due 2029-30Abersoch Harbour Storm Overflow
DCWW101346a · 7246db1eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
AFONWEN WASTEWATER TREATMENT WORKS PUMPING STATION
Due 2029-30Afonwen WwTW Storm Overflow
DCWW101582a · 7ea92600W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
AFONWEN WWTW PS
Due 2029-30Afonwen WwTW Storm Overflow
DCWW101582a · 4dba1b82W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
AMMANDA TERRACE BORTH Y GEST PORTHM
Due 2029-30Amanda Terrace Storm Overflow
DCWW101582a · f8bf79e5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BAKERS LANE/CHANDLERS PLACE PORTH
Due 2029-30Chandlers Place Porthmadog Storm Overflow
DCWW101830b · 31ce3a22W_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
BEDDGELERT WWTW
Due 2029-30Water body only
DCWW101830a · 137c02baW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
BEDDGELERT WWTW
Due 2029-30Water body only
DCWW102821a · 33af64d7W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BLAENAU FFESTINIOG A
Due 2029-30Blaenau Ffestiniog WwTW Point 2 Storm Overflow
DCWW101582a · a614a240W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Blaenau Ffestiniog CSO No 3
Due 2029-30The Square Blaenau Ffestiniog Storm Overflow
DCWW101232a · 2ec35ce1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BLAENAU FFESTINIOG NO2
Due 2029-30Llwyn Y Gell Road Ffestiniog Storm Overflow
DCWW101582a · 50295403W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BRIDGE GARAGE PWLLHELI
Due 2029-30Abererch Road Crossing Storm Overflow
DCWW101582a · 68c1d191W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BRITANNIA PS
Due 2029-30Porthmadog Britannia Place Storm Overflow
DCWW101582a · d6050a91W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BRYNCOCH SEWAGE PUMPING STATION
Due 2029-30Nefyn WwTW Inlet PS (Discharge Point A) Storm Overflow
DCWW101582a · 10ef59e5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CHAPEL STREET/MADOG STREET PORTHM
Due 2029-30Chapel Street Porthmadog Storm Overflow
DCWW101253a · 290860a9W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CLYNNOG FAWR PUMPING STATION
Due 2029-30Clynnog Fawr Storm Overflow
DCWW102807a · 804a6a3aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Criccieth - Hen Felin Newydd CSO
Due 2029-30Beach Bank Criccieth Storm Overflow
DCWW101582a · 4280a247W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CRICCIETH EAST PS
Due 2029-30Esplanade Criccieth Storm Overflow
DCWW101274a · 177674c7W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CRICCIETH EAST PUMPING STATION
Due 2029-30Esplanade Criccieth Storm Overflow
DCWW101582a · 6eeb1277W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Criccieth STW CSO to Settled Storm Sewage Tanks
Due 2029-30West Parade Criccieth Overflow
DCWW101582a · 0887985dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CRICCIETH WEST PS
Due 2029-30West Parade Criccieth Overflow
DCWW101275a · 37c08df5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CRICCIETH WEST PUMPING STATION
Due 2029-30West Parade Criccieth Overflow
DCWW101831a · a5f8a10cW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
CROESOR SEWAGE TREATMENT WORKS
Due 2029-30Water body only
DCWW101481a · 47f7fb8eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CSO & EO at Aberdaron PS
Due 2029-30Aberdaron Storm Overflow
DCWW101582a · df34e7a2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO and EO at Llanystumdwy Pumping Station
Due 2029-30Llanystumdwy WwTW Storm Overflow
DCWW101582a · 3e1545d2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Beddgelert East Bank Afon Glaslyn
Due 2029-30East Bank Afon Glaslyn Beddgelert Storm Overflow
DCWW101582a · 44f02e0cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Land Off A496 Manod Blaenau Ffesti
Due 2029-30Congl Y Wal Blaenau Ffestiniog Storm Overflow Storm Overflow
DCWW101582a · 1c9cd7f0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Talsarnau SPS
Due 2029-30Talsarnau WwTW Storm Overflow
DCWW101582a · 9f537dc0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Trawsfynydd WwTW
Due 2029-30Trawsfynydd WwTW Storm Overflow
DCWW101582a · 947c95d5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO Rear Of Prysor Filling Station Traw
Due 2029-30A470 A4212 Junction Storm Overflow
DCWW102490a · aa941657W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Edern SPS CSO
Due 2029-30Lôn Goch Edern Storm Overflow
DCWW101330a · aa642f54W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
EDERN SPS CSO, EDERN, LLEYN PENINSULA
Due 2029-30Lôn Goch Edern Storm Overflow
DCWW102236a · decad341W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
EFILNEWYDD STW CSO
Due 2029-30Efailnewydd WwTW Storm Overflow
DCWW101987a · c26bcb99W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Ffestiniog STW
Due 2029-30Llan Ffestiniog WwTW Inlet Storm Overflow
DCWW101582a · bee16653W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
FRIOG SEWAGE PUMPING STATION
Due 2029-30Nefyn WwTW Inlet PS (Discharge Point A) Storm Overflow
DCWW101582a · 623efb2aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GIMBLET ROCK TIDAL TANK CSO
Due 2029-30Gimblet Rock Storm Overflow
DCWW101186a · 34da3ac5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GIMBLET ROCK TIDAL TANK PWLLHELI
Due 2029-30Gimblet Rock Storm Overflow
DCWW101582a · b9521787W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GLAN Y DON PS PWLLHELI
Due 2029-30Glan-Y-Don Pwllheli Storm Overflow
DCWW101201a · c22df1ebW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GLAN-Y-DON SEWAGE PUMPING STATION
Due 2029-30Glan-Y-Don Pwllheli Storm Overflow
DCWW102814a · 0b322ba5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
HARLECH FFORDD PENLLACH O/S LAUNDRY
Due 2029-30Ffordd Penllach Storm Overflow
DCWW101582a · ba91c0a4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Harlech Rum Hole CSO
Due 2029-30Harlech Storm Overflow
DCWW101336a · 9ff1f4e2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HARLECH TERMINAL PUMPING STATION - OUTFALL A
Due 2029-30Harlech Storm Overflow
DCWW101290a · 99a4b33fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
HARLECH TERMINAL PUMPING STATION - OUTFALL B
Due 2029-30Bron Castell Storm Overflow
DCWW101172a · e5d369cbW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANBEDROG SEWAGE PUMPING STATION
Due 2029-30Llanbedrog Long Nant-Iago Storm Overflow
DCWW101582a · a8f0a373W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanbedrog SPS
Due 2029-30Llanbedrog Long Nant-Iago Storm Overflow
DCWW101582a · 92eab887W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLANERCH CSO
Due 2029-30Stryd Y Felin Storm Overflow
DCWW101832b · 4ad82dc3W_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
LLANFROTHEN STW
Due 2029-30Water body only
DCWW101832a · fb040dcdW_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
LLANFROTHEN STW
Due 2029-30Water body only
DCWW101582a · 23825aecW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanystumdwy (W Porthmadog) A (Settled Storm)
Due 2029-30Llanystumdwy WwTW Storm Overflow
DCWW101324a · 6ec02528W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Llanystumdwy Pumping Station
Due 2029-30Llanystumdwy WwTW Storm Overflow
DCWW101582a · 655f04c1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MAENTWROG CSO
Due 2029-30Maentwrog Storm Overflow
DCWW102003a · 9ecda952W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
MAES GWYNDY CSO
Due 2029-30Maes Gwyndy Trawsfynydd Storm Overflow
DCWW102822a · a403b60aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Morfa Bychan STW EO
Due 2029-30Morfa Bychan WwTW Storm Overflow
DCWW102614a · a78eaf1bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Morfa Bychan WwTW Storm Overflow
Due 2029-30Morfa Bychan WwTW Storm Overflow
DCWW101582a · 23ec1babW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MORFA GARREG PS PWLLHELI
Due 2029-30Morfa'r Garreg Storm Overflow
DCWW101202a · adeb3da5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MORFA GARREG SPS, PWLLHELI
Due 2029-30Morfa'r Garreg Storm Overflow
DCWW102491a · 551068bfW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Morfa Nefyn (New) STW CSO
Due 2029-30Nefyn WwTW Settled Storm Overflow
DCWW101582a · 3d1254acW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
River
MORFA NEFYN PUMPING STATION CSO (B)
Due 2029-30Water body only
DCWW101331a · 8d26f520W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MORFA NEFYN SPS CSO (A), NEFYN, LLEYN PENINSULA
Due 2029-30Lôn Goch Edern Storm Overflow
DCWW101332a · 7be31d44W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MORFA NEFYN SPS CSO (B), NEFYN, LLEYN PENINSULA
Due 2029-30Nefyn WwTW Inlet PS (Discharge Point A) Storm Overflow
DCWW101582a · 656f42ecW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEFYN PUMPING STATION
Due 2029-30Nefyn Storm Overflow
DCWW101173a · 67c86e1fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NEFYN SPS CSO, NEFYN
Due 2029-30Nefyn Storm Overflow
DCWW101582a · 069767daW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEFYN WWTW
Due 2029-30Nefyn WwTW Inlet PS (Discharge Point A) Storm Overflow
DCWW102468a · a199f6b0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Parry's Terrace CSO Blaenau Ffestiniog
Due 2029-30Llwyn Y Gell Road Ffestiniog Storm Overflow
DCWW101582a · fda908a4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penrhyndeudraeth Wastewater Treatment Works Storm Overflow
Due 2029-30Penrhyndeudraeth WwTW Settled Storm Overflow
DCWW102598a · cb2112c9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PORTHMADOG LOMBARD STREET/BANK PLACE
Due 2029-30Lombard Street Bank Place Porthmadog Storm Overflow
DCWW101307a · c2d55a36W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PORTHMADOG SEWAGE TREATMENT WORKS STORM STORAGE TANKS
Due 2029-30Porthmadog WwTW Tank Overflow
DCWW101306a · f0fc5876W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PORTHMADOG SEWAGE TREATMENT WORKS, ON SITE SEWAGE PUMPING STATION
Due 2029-30Porthmadog WwTW Tank Overflow
DCWW102816a · 9bd81092W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PORTHMADOG SWK EOF
Due 2029-30Porthmadog WwTW Tank Overflow
DCWW102791a · 77cce5d8W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Porthmadog WwTW Final Effluent PS EOF
Due 2029-30Porthmadog WwTW Tank Overflow
DCWW102487a · 9565f140W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Porthmadog WwTW Storm Tank
Due 2029-30Porthmadog WwTW Tank Overflow
DCWW101833a · cd299323W_HR_P_ND_IMP1Improvement
Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure.
WQ
Prenteg WwTW
Due 2029-30Water body only
DCWW101833b · e2794a2fW_HR_AMM_T_IMP1Improvement
Ammonia reduction to meet numeric permit limit Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments.
WQ
Prenteg WwTW
Due 2029-30Water body only
DCWW100602a · 23f4a1c9W_U_IMP7(a-e)Improvement
Upgrade septic tank primary treated effluent to secondary treated effluent capable of delivering 40/60 BOD/SS Biological Oxygen Demand: Suspended Soilids
WQ
Rhyd-y-sarn, Gwynedd Septic Tank
Due 2029-30Water body only
DCWW101582a · 6df339a5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Settled Storm Overflow at Trefor Wastewater Treatment Works
Due 2029-30Trefor WwTW Relief Discharge Point Storm Overflow
DCWW101145a · 7c86e4d4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SNOWDON STREET SEWAGE PUMPING STATION
Due 2029-30Snowdon Street Storm Overflow
DCWW102483a · 009ac7f1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TRAWSFYNYDD NEAR BRON GWYNDY
Due 2029-30Fronwynion Street Trawsfynydd Storm Overflow
DCWW101582a · 1bfaaa64W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Trefor CSO
Due 2029-30Trefor Storm Overflow
DCWW101582a · 8ef15f86W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TREMADOG SSO
Due 2029-30Tremadog Iscraig Storm Overflow
DCWW101582a · e6de3dd9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Y Maes CSO
Due 2029-30Y Maes Pwllheli Storm Overflow

113 of 113 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.