DonateLog in
River Hub
NRW sampling point

Cors Gyfelog Nw Section Car Park Drain 3

Sampled by Natural Resources Wales on 11 visits from 2023 to 2025.

Phosphate

2023–2025: avg 0.004 · max 0.020 mg/l
00.050.10.150.2202420252025-02-11: below 0.004 mg/l2025-03-17: below 0.004 mg/l2025-04-09: 0.0197 mg/l2025-04-30: below 0.004 mg/l2025-06-18: below 0.004 mg/l2025-07-23: below 0.004 mg/l2025-09-03: 0.0061 mg/l2025-10-01: below 0.004 mg/l2025-10-22: below 0.004 mg/l2025-11-12: below 0.004 mg/l2025-12-04: below 0.004 mg/l
High ≤ 0.036Good ≤ 0.069Moderate ≤ 0.173Poor ≤ 1.003Bad > 1.003

Ammonia

2023–2025: avg 0.014 · max 0.036 mg/l
00.20.40.6202420252025-02-11: 0.0105 mg/l2025-03-17: 0.0132 mg/l2025-04-09: 0.009 mg/l2025-04-30: 0.0357 mg/l2025-06-18: 0.014 mg/l2025-07-23: 0.0137 mg/l2025-09-03: 0.0176 mg/l2025-10-01: 0.0139 mg/l2025-10-22: 0.0092 mg/l2025-11-12: 0.0097 mg/l2025-12-04: 0.009 mg/l
High ≤ 0.2Good ≤ 0.3Moderate ≤ 0.75Poor ≤ 1.1Bad > 1.1

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Ammoniacal Nitrogen as N (mg/l)

NRW sampling point S6520020 · 44 readings of 4 tests since 2025.

DateResultUnitSample
2025-12-04 11:350.009mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-11-12 11:100.0097mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-22 11:050.0092mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-01 10:550.0139mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-09-03 12:100.0176mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-07-23 10:550.0137mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-06-18 10:500.014mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-30 10:500.0357mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-09 11:200.009mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-03-17 10:300.0132mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-11 10:350.0105mg/lSURFACE DRAINAGE · PLANNED INVESTIGATION (LOCAL MONITORING)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Glaslyn, Dwyryd and Llŷn.