Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

59
Measures in this catchment
WINEP, current record
45
Still active
not yet past their date
14
Assumed complete
completion date has passed
19
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08TW100558 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BLEDINGTON STW
Complete 2025-26Bledington STW
08TW100565 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BROADWELL STW
Complete 2025-26Broadwell STW
08TW100571 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHADLINGTON STW
Complete 2025-26Chadlington STW
08TW100573 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHARLBURY STW
Complete 2025-26Charlbury STW
08TW100702 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHIPPING NORTON STW
Complete 2025-26Chipping Norton STW
08TW100581 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHURCH HANBOROUGH STW
Complete 2025-26Church Hanborough STW
08TW100584 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
COMBE STW
Complete 2025-26Combe STW
08TW100605 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
FINSTOCK STW
Complete 2025-26Finstock STW
08TW100711 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LITTLE COMPTON STW
Complete 2025-26Little Compton STW
08TW100642 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MIDDLE BARTON STW
Complete 2025-26Middle Barton STW
08TW100644 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MILTON UNDER WYCHWOOD STW
Complete 2025-26Littlestock Stream to tributary of Evenlode at Shipton
08TW100645 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MORETON IN MARSH STW (Last in Line Overflow off site)
Complete 2025-26Evenlode (Compton Bk to Bledington Bk) and 4 Shires
08TW100725 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SHOTTESWELL STW
Complete 2025-26Dorn (Source to Glyme)
08TW100731 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WOODSTOCK STW
Complete 2025-26Woodstock STW
08TW100419 · aU_MON4Monitoring
Install and run event-duration monitoring
BLEDINGTON STW
Due 2026-27Bledington STW
08TW100299 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
BROADWELL STW
Due 2026-27Broadwell STW
08TW100422 · aU_MON4Monitoring
Install and run event-duration monitoring
CHADLINGTON STW
Due 2026-27Chadlington STW
08TW101579 · aU_MON4Monitoring
Install and run event-duration monitoring
CHARLBURY STW
Due 2026-27Charlbury STW
08TW100312 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
CHIPPING NORTON STW
Due 2026-27Chipping Norton STW
08TW100315 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
CHURCH HANBOROUGH STW
Due 2026-27Church Hanborough STW
08TW100427 · aU_MON4Monitoring
Install and run event-duration monitoring
COMBE STW
Due 2026-27Combe STW
08TW101589 · aU_MON4Monitoring
Install and run event-duration monitoring
FINSTOCK STW
Due 2026-27Finstock STW
08TW100359 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
LITTLE COMPTON STW
Due 2026-27Little Compton STW
08TW101599 · aU_MON4Monitoring
Install and run event-duration monitoring
MIDDLE BARTON STW
Due 2026-27Middle Barton STW
08TW101601 · aU_MON4Monitoring
Install and run event-duration monitoring
MILTON UNDER WYCHWOOD STW
Due 2026-27Littlestock Stream to tributary of Evenlode at Shipton
08TW100444 · aU_MON4Monitoring
Install and run event-duration monitoring
MORETON IN MARSH STW (Last in Line Overflow off site)
Due 2026-27Evenlode (Compton Bk to Bledington Bk) and 4 Shires
08TW100380 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
SHOTTESWELL STW
Due 2026-27Dorn (Source to Glyme)
08TW100410 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
WOODSTOCK STW
Due 2026-27Woodstock STW
08TW100489 · aWFD_NDLS_Chem1No deterioration
Milton-under-Wychwood STW cypermethrin load standstill limit
Milton-under-Wychwood STW
Due 2026-27Milton-Under-Wychwood STW
08TW100092 · aWFD_NDLS_Chem2No deterioration
Moreton-in-Marsh STW, cypermethrin, 0.000557 ug
Reduce cypermethrin loading
Due 2026-27Evenlode (Compton Bk to Bledington Bk) and 4 Shires
08TW100073 · aWFD_NDLS_Chem2No deterioration
Church Hanborough STW, cypermethrin, 0.000819ug
Reduce cypermethrin loading
Due 2026-27Evenlode (Glyme to Thames)
08TW100475 · aWFD_NDLS_Chem1No deterioration
Church Hanborough STW zinc load standstill permit limit
Reduce metal loading at Church Hanborough STW
Due 2026-27Evenlode (Glyme to Thames)
08TW100129 · aWFD_NDLS_Chem2No deterioration
Moreton-in-Marsh STW, Nonylphenol, 0.48 ug
Reduce Nonylphenol loading
Due 2026-27Evenlode (Compton Bk to Bledington Bk) and 4 Shires
08TW101108 · tjEnvAct_INV4Investigation
Storm Overflows investigation
LITTLE COMPTON STW- Storm Overflows investigation
Due 2027-28Little Compton Brook and tributaries (Source to Evenlode)
08TW101108 · ahEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at BLEDINGTON STW
Due 2027-28Evenlode (Bledington to Glyme confluence)
08TW101108 · amEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at CHADLINGTON STW
Due 2027-28Evenlode (Bledington to Glyme confluence)
08TW101108 · atEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at COMBE STW
Due 2027-28Evenlode (Bledington to Glyme confluence)
08TW100204 · aWFD_INVInvestigation
Investigate the cause of the spills
WFD Investigation of in river Dissolved Oxygen to inform future action
Due 2027-28Westcote Brook (source to Evenlode at Bledington)
08TW101108 · trEnvAct_INV4Investigation
Storm Overflows investigation
WOODSTOCK STW- Storm Overflows investigation
Due 2027-28Glyme (Dorn confluence to Evenlode)
08TW100879 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Broadwell STW
Broadwell STW Phosphorus load recution
Due 2029-30Evenlode (Compton Bk to Bledington Bk) and 4 Shires
08TW100488 · aWFD_ND_CHEM3No deterioration
Middleton Cheney STW cypermethrin no det and load standstill limit
Middleton Cheney STW
Due 2029-30Littlestock Stream to tributary of Evenlode at Shipton
08TW100950 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Ash Ridge (Wokingham) STW also known as Wokingham STW
Reduce Phosphorus Loadings at Ash Ridge (Wokingham) STW
Due 2029-30Glyme (Dorn confluence to Evenlode)
08TW100873 · aEnvAct_IMP1Improvement
1 mg/l Phosphorus permit at Bledington STW
Reduce Phosphorus Loadings at Bledington STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW100883 · aEnvAct_IMP1Improvement
0.45 mg/l Phosphorus permit at Chadlington STW
Reduce Phosphorus Loadings at Chadlington STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW100885 · aEnvAct_IMP1Improvement
2 mg/l Phosphorus permit at Charlbury STW
Reduce Phosphorus Loadings at Charlbury STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW100888 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Chipping Norton STW
Reduce Phosphorus Loadings at Chipping Norton STW
Due 2029-30Cornwell Brook and tributaries (Source to Evenlode)
08TW100889 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Church Hanborough STW
Reduce Phosphorus Loadings at Church Hanborough STW
Due 2029-30Evenlode (Glyme to Thames)
08TW101888 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Earlswood STW also known as Reigate STW
Reduce Phosphorus Loadings at Earlswood STW
Due 2029-30Cornwell Brook and tributaries (Source to Evenlode)
08TW100903 · aEnvAct_IMP1Improvement
0.6 mg/l Phosphorus permit at Finstock STW
Reduce Phosphorus Loadings at Finstock STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW100916 · aEnvAct_IMP1Improvement
0.4 mg/l Phosphorus permit at Little Compton STW
Reduce Phosphorus Loadings at Little Compton STW
Due 2029-30Little Compton Brook and tributaries (Source to Evenlode)
08TW100918 · aEnvAct_IMP1Improvement
1 mg/l Phosphorus permit at Longborough STW
Reduce Phosphorus Loadings at Longborough STW
Due 2029-30Evenlode (Source to Four Shires S) and Longborough Stream
08TW100922 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Milton-Under-Wychwood STW
Reduce Phosphorus Loadings at Milton-Under-Wychwood STW
Due 2029-30Littlestock Stream to tributary of Evenlode at Shipton
08TW100923 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Moreton-in-Marsh STW
Reduce Phosphorus Loadings at Moreton-in-Marsh STW
Due 2029-30Evenlode (Compton Bk to Bledington Bk) and 4 Shires
08TW100982 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 1,011m of sewer relining, 50m3 storage, 0.41Ha SUDS IA Removal, No screen required
Storm Overflows action at BLEDINGTON STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW100989 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 1,166m of sewer relining, 90m3 storage, 0.48Ha SUDS IA Removal, 20m3 screen
Storm Overflows action at CHADLINGTON STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW101016 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 1,400m of sewer relining, 0.57Ha SUDS IA Removal, 20m3 screen
Storm Overflows action at CHARLBURY STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW100997 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 648m of sewer relining, 0.26Ha SUDS IA Removal, No screen required
Storm Overflows action at COMBE STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW101018 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 639m3 storage, 20m3 screen
Storm Overflows action at FINSTOCK STW
Due 2029-30Evenlode (Bledington to Glyme confluence)
08TW101023 · aEnvAct_IMP2Improvement
Option C1: Solution in AMP 08: 648m of sewer relining, 27m3 storage, 0.26Ha SUDS IA Removal, No screen required
Storm Overflows action at LITTLE COMPTON STW
Due 2029-30Little Compton Brook and tributaries (Source to Evenlode)

59 of 59 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.