A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

53
Measures in this catchment
WINEP, current record
44
Still active
not yet past their date
9
Assumed complete
completion date has passed
12
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08TW100497 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BERKHAMSTED SEWAGE TREATMENT WORKS
Complete 2025-26Bulbourne
08TW100528 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BLACKBIRDS SEWAGE TREATMENT WORKS
Complete 2025-26Colne (from Confluence with Ver to Gade)
08TW100500 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CADDINGTON SEWAGE TREATMENT WORKS
Complete 2025-26Ver
08TW100502 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHESHAM SEWAGE TREATMENT WORKS
Complete 2025-26Chess
08TW100708 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
DAGNALL SEWAGE TREATMENT WORKS
Complete 2025-26Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC)
08TW100506 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
GERRARDS CROSS SEWAGE TREATMENT WORKS
Complete 2025-26Misbourne
08TW100510 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
IVER ( NORTH ) SEWAGE TREATMENT WORKS
Complete 2025-26Colne Brook
08TW100514 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MAPLE LODGE SEWAGE TREATMENT WORKS
Complete 2025-26Colne (Confluence with Chess to River Thames)
08TW100515 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MARKYATE SEWAGE TREATMENT WORKS
Complete 2025-26Ver
08TW100418 · aU_MON4Monitoring
Install and run event-duration monitoring
BERKHAMSTED SEWAGE TREATMENT WORKS
Due 2026-27Bulbourne
08TW100293 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
BLACKBIRDS SEWAGE TREATMENT WORKS
Due 2026-27Colne (from Confluence with Ver to Gade)
08TW101553 · aU_MON4Monitoring
Install and run event-duration monitoring
CADDINGTON SEWAGE TREATMENT WORKS
Due 2026-27Ver
08TW100424 · aU_MON4Monitoring
Install and run event-duration monitoring
CHESHAM SEWAGE TREATMENT WORKS
Due 2026-27Chess
08TW101405 · kEDWRMP_INVInvestigation
Large catchment investigation
Chess baseline monitoring and benefits assessment
Due 2026-27Chess
08TW100325 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
DAGNALL SEWAGE TREATMENT WORKS
Due 2026-27Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC)
08TW100336 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
GERRARDS CROSS SEWAGE TREATMENT WORKS
Due 2026-27Misbourne
08TW100036 · aWFD_INV_WRFlowInvestigation
Further phase of investigation
Hampden Bottom Source investigation
Due 2026-27Misbourne
08TW101557 · aU_MON4Monitoring
Install and run event-duration monitoring
MAPLE LODGE SEWAGE TREATMENT WORKS
Due 2026-27Colne (Confluence with Chess to River Thames)
08TW100365 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
MARKYATE SEWAGE TREATMENT WORKS
Due 2026-27Ver
08TW100479 · aWFD_NDLS_Chem1No deterioration
Gerrards Cross STW cypermethrin load standstill limit
Gerrards Cross STW
Due 2026-27Gerrards Cross STW
08TW100148 · aWFD_NDLS_Chem2No deterioration
new PFOS limit
PFOS Maple Lodge STW
Due 2026-27Colne (Confluence with Chess to River Thames)
08TW100468 · aWFD_NDLS_Chem1No deterioration
Berkhamsted STW Cypermethrin load standstill limit
Reduce Cypermethrin loading at Berkhamsted STW
Due 2026-27Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC)
08TW100088 · aWFD_NDLS_Chem2No deterioration
Maple Lodge STW, cypermethrin, 0.000147 ug
Reduce cypermethrin loading
Due 2026-27Colne (Confluence with Chess to River Thames)
08TW100480 · aWFD_NDLS_Chem1No deterioration
Great Gaddesden STW  cypermethrin load standstill limit
Reduce cypermethrin loading
Due 2026-27Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC)
08TW100058 · aWFD_NDLS_Chem2No deterioration
Gerrads Cross STW, copper (dissolved), 18.4
Reduce metal loading
Due 2026-27Misbourne
08TW100138 · aWFD_NDLS_Chem2No deterioration
Chesham STW, zinc (dissolved), 33.4
Reduce metal loading
Due 2026-27Chess
08TW100126 · aWFD_NDLS_Chem2No deterioration
Maple Lodge STW, Nonylphenol, 0.89 ug
Reduce Nonylphenol loading
Due 2026-27Colne (Confluence with Chess to River Thames)
08TW100117 · aWFD_NDLS_Chem2No deterioration
Chesham STW, Nonylphenol, 0.38 ug
Reduce Nonylphenol loading
Due 2026-27Chess
08TW100111 · aWFD_NDLS_Chem2No deterioration
Blackbirds STW, Nonylphenol, 0.74 ug
Reduce Nonylphenol loading
Due 2026-27Colne (from Confluence with Ver to Gade)
08TW100108 · aWFD_NDLS_Chem2No deterioration
Berkhamsted STW, Nonylphenol, 0.48 ug
Reduce Nonylphenol loading
Due 2026-27Bulbourne
08TW101545 · hWFD_INV_CHEMInvestigation
PFOS investigation - Maple Lodge STW
4a Investigation to develop and trial a framework that meets statutory requirements
Due 2027-28Colne (Confluence with Chess to River Thames)
08TW101546 · cWFD_INV_CHEMInvestigation
Chemical investigation into groundwater Caddington STW
4c groundwater investigation
Due 2027-28Ver
08TW103460 · aWFD_INV_CHEMInvestigation
groundwater emerging substances investigation at 1 site. Monitor for PEWS, CIP3 substances of concern, PFAS and non-target screening
4e Emerging substances investigation – groundwater emerging substances
Due 2027-28Colne (Confluence with Chess to River Thames)
08TW103462 · aWFD_INV_CHEMInvestigation
to include PFAS, non-target screening, emerging substances from PEWS and CIP3 substances of concern (site 1)
4e Emerging substances investigation – surface water emerging substances
Due 2027-28Colne (Confluence with Chess to River Thames)
08TW101108 · aoEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at CHESHAM STW
Due 2027-28Chess
08TW101108 · hiEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at DARKES LANE, POTTERS BAR CSO
Due 2027-28Colne (upper east arm including Mimshall Brook)
08TW101108 · bhEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at Gerrards Cross STW
Due 2027-28Misbourne
08TW101108 · bxEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at MAPLE LODGE STW
Due 2027-28Colne (Confluence with Chess to River Thames)
08TW101108 · byEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at MARKYATE STW
Due 2027-28Ver
08TW101108 · fmEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at PULLER RD CALVERT RD STORM, BARNET SPS
Due 2027-28Colne (upper east arm including Mimshall Brook)
08TW100052 · aWFD_INV_CHEMInvestigation
Maple Lodge STW
4e Emerging substances investigation – impact to the environment
Due 2029-30Colne (Confluence with Chess to River Thames)
08TW100013 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Cannons Mill Weir Fish Pass
Due 2029-30Chess
08TW100022 · aWFD_IMP_PHYSHABImprovement
Implement a river restoration scheme to promote natural morphological processes
Chess (D/s Broadwater bridge) River Restoration Scheme
Due 2029-30Chess
08TW100016 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Decco Weir Fish Pass
Due 2029-30Chess
09TW100005 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Little Chess Piped Offtake Fish Pass
Due 2029-30Chess
08TW100079 · aWFD_IMP_CHEMImprovement
Great Gaddesden STW, cypermethrin, 0.0011883ug
Reduce cypermethrin loading
Due 2029-30Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC)
09TW100023 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Berkhamsted STW
Reduce Phosphorus Loadings at Berkhamsted STW
Due 2029-30Bulbourne
08TW100025 · aWFD_IMP_WRHMWBImprovement
Implement a river restorations schmeme to promote natural morphological processes
River Ash River Restoration Scheme
Due 2029-30Surrey Ash
08TW100021 · aWFD_IMP_PHYSHABImprovement
Implement a river restoration scheme to promote natural morphological processes
River Chess (Cress Bed Villas) River Restoration Scheme
Due 2029-30Chess
08TW101009 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 6.15Ha SUDS IA Removal, No screen required
Storm Overflows action at Gerrards Cross STW
Due 2029-30Misbourne
08TW101025 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 3,734m of sewer relining, 430m3 storage, 1.53Ha SUDS IA Removal, 20m3 screen
Storm Overflows action at MARKYATE STW
Due 2029-30Ver
09TW100006 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Weirhouse Mill Fish Pass
Due 2029-30Chess
08TW100027 · aWFD_IMP_PHYSHABImprovement
Implement a river restoration scheme to promote natural morphological processes
Wraysbury River River Restoration Scheme
Due 2029-30Colne (Confluence with Chess to River Thames)

53 of 53 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.