What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08TW100497 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BERKHAMSTED SEWAGE TREATMENT WORKS | Complete 2025-26 | Bulbourne |
| 08TW100528 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BLACKBIRDS SEWAGE TREATMENT WORKS | Complete 2025-26 | Colne (from Confluence with Ver to Gade) |
| 08TW100500 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CADDINGTON SEWAGE TREATMENT WORKS | Complete 2025-26 | Ver |
| 08TW100502 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHESHAM SEWAGE TREATMENT WORKS | Complete 2025-26 | Chess |
| 08TW100708 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) DAGNALL SEWAGE TREATMENT WORKS | Complete 2025-26 | Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC) |
| 08TW100506 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) GERRARDS CROSS SEWAGE TREATMENT WORKS | Complete 2025-26 | Misbourne |
| 08TW100510 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) IVER ( NORTH ) SEWAGE TREATMENT WORKS | Complete 2025-26 | Colne Brook |
| 08TW100514 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MAPLE LODGE SEWAGE TREATMENT WORKS | Complete 2025-26 | Colne (Confluence with Chess to River Thames) |
| 08TW100515 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MARKYATE SEWAGE TREATMENT WORKS | Complete 2025-26 | Ver |
| 08TW100418 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BERKHAMSTED SEWAGE TREATMENT WORKS | Due 2026-27 | Bulbourne |
| 08TW100293 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) BLACKBIRDS SEWAGE TREATMENT WORKS | Due 2026-27 | Colne (from Confluence with Ver to Gade) |
| 08TW101553 · a | U_MON4 | Monitoring | Install and run event-duration monitoring CADDINGTON SEWAGE TREATMENT WORKS | Due 2026-27 | Ver |
| 08TW100424 · a | U_MON4 | Monitoring | Install and run event-duration monitoring CHESHAM SEWAGE TREATMENT WORKS | Due 2026-27 | Chess |
| 08TW101405 · k | EDWRMP_INV | Investigation | Large catchment investigation Chess baseline monitoring and benefits assessment | Due 2026-27 | Chess |
| 08TW100325 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) DAGNALL SEWAGE TREATMENT WORKS | Due 2026-27 | Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC) |
| 08TW100336 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) GERRARDS CROSS SEWAGE TREATMENT WORKS | Due 2026-27 | Misbourne |
| 08TW100036 · a | WFD_INV_WRFlow | Investigation | Further phase of investigation Hampden Bottom Source investigation | Due 2026-27 | Misbourne |
| 08TW101557 · a | U_MON4 | Monitoring | Install and run event-duration monitoring MAPLE LODGE SEWAGE TREATMENT WORKS | Due 2026-27 | Colne (Confluence with Chess to River Thames) |
| 08TW100365 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) MARKYATE SEWAGE TREATMENT WORKS | Due 2026-27 | Ver |
| 08TW100479 · a | WFD_NDLS_Chem1 | No deterioration | Gerrards Cross STW cypermethrin load standstill limit Gerrards Cross STW | Due 2026-27 | Gerrards Cross STW |
| 08TW100148 · a | WFD_NDLS_Chem2 | No deterioration | new PFOS limit PFOS Maple Lodge STW | Due 2026-27 | Colne (Confluence with Chess to River Thames) |
| 08TW100468 · a | WFD_NDLS_Chem1 | No deterioration | Berkhamsted STW Cypermethrin load standstill limit Reduce Cypermethrin loading at Berkhamsted STW | Due 2026-27 | Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC) |
| 08TW100088 · a | WFD_NDLS_Chem2 | No deterioration | Maple Lodge STW, cypermethrin, 0.000147 ug Reduce cypermethrin loading | Due 2026-27 | Colne (Confluence with Chess to River Thames) |
| 08TW100480 · a | WFD_NDLS_Chem1 | No deterioration | Great Gaddesden STW cypermethrin load standstill limit Reduce cypermethrin loading | Due 2026-27 | Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC) |
| 08TW100058 · a | WFD_NDLS_Chem2 | No deterioration | Gerrads Cross STW, copper (dissolved), 18.4 Reduce metal loading | Due 2026-27 | Misbourne |
| 08TW100138 · a | WFD_NDLS_Chem2 | No deterioration | Chesham STW, zinc (dissolved), 33.4 Reduce metal loading | Due 2026-27 | Chess |
| 08TW100126 · a | WFD_NDLS_Chem2 | No deterioration | Maple Lodge STW, Nonylphenol, 0.89 ug Reduce Nonylphenol loading | Due 2026-27 | Colne (Confluence with Chess to River Thames) |
| 08TW100117 · a | WFD_NDLS_Chem2 | No deterioration | Chesham STW, Nonylphenol, 0.38 ug Reduce Nonylphenol loading | Due 2026-27 | Chess |
| 08TW100111 · a | WFD_NDLS_Chem2 | No deterioration | Blackbirds STW, Nonylphenol, 0.74 ug Reduce Nonylphenol loading | Due 2026-27 | Colne (from Confluence with Ver to Gade) |
| 08TW100108 · a | WFD_NDLS_Chem2 | No deterioration | Berkhamsted STW, Nonylphenol, 0.48 ug Reduce Nonylphenol loading | Due 2026-27 | Bulbourne |
| 08TW101545 · h | WFD_INV_CHEM | Investigation | PFOS investigation - Maple Lodge STW 4a Investigation to develop and trial a framework that meets statutory requirements | Due 2027-28 | Colne (Confluence with Chess to River Thames) |
| 08TW101546 · c | WFD_INV_CHEM | Investigation | Chemical investigation into groundwater Caddington STW 4c groundwater investigation | Due 2027-28 | Ver |
| 08TW103460 · a | WFD_INV_CHEM | Investigation | groundwater emerging substances investigation at 1 site. Monitor for PEWS, CIP3 substances of concern, PFAS and non-target screening 4e Emerging substances investigation – groundwater emerging substances | Due 2027-28 | Colne (Confluence with Chess to River Thames) |
| 08TW103462 · a | WFD_INV_CHEM | Investigation | to include PFAS, non-target screening, emerging substances from PEWS and CIP3 substances of concern (site 1) 4e Emerging substances investigation – surface water emerging substances | Due 2027-28 | Colne (Confluence with Chess to River Thames) |
| 08TW101108 · ao | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at CHESHAM STW | Due 2027-28 | Chess |
| 08TW101108 · hi | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at DARKES LANE, POTTERS BAR CSO | Due 2027-28 | Colne (upper east arm including Mimshall Brook) |
| 08TW101108 · bh | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at Gerrards Cross STW | Due 2027-28 | Misbourne |
| 08TW101108 · bx | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at MAPLE LODGE STW | Due 2027-28 | Colne (Confluence with Chess to River Thames) |
| 08TW101108 · by | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at MARKYATE STW | Due 2027-28 | Ver |
| 08TW101108 · fm | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at PULLER RD CALVERT RD STORM, BARNET SPS | Due 2027-28 | Colne (upper east arm including Mimshall Brook) |
| 08TW100052 · a | WFD_INV_CHEM | Investigation | Maple Lodge STW 4e Emerging substances investigation – impact to the environment | Due 2029-30 | Colne (Confluence with Chess to River Thames) |
| 08TW100013 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Cannons Mill Weir Fish Pass | Due 2029-30 | Chess |
| 08TW100022 · a | WFD_IMP_PHYSHAB | Improvement | Implement a river restoration scheme to promote natural morphological processes Chess (D/s Broadwater bridge) River Restoration Scheme | Due 2029-30 | Chess |
| 08TW100016 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Decco Weir Fish Pass | Due 2029-30 | Chess |
| 09TW100005 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Little Chess Piped Offtake Fish Pass | Due 2029-30 | Chess |
| 08TW100079 · a | WFD_IMP_CHEM | Improvement | Great Gaddesden STW, cypermethrin, 0.0011883ug Reduce cypermethrin loading | Due 2029-30 | Gade (Upper stretch Great Gaddesden to confluence with Bulbourne / GUC) |
| 09TW100023 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Berkhamsted STW Reduce Phosphorus Loadings at Berkhamsted STW | Due 2029-30 | Bulbourne |
| 08TW100025 · a | WFD_IMP_WRHMWB | Improvement | Implement a river restorations schmeme to promote natural morphological processes River Ash River Restoration Scheme | Due 2029-30 | Surrey Ash |
| 08TW100021 · a | WFD_IMP_PHYSHAB | Improvement | Implement a river restoration scheme to promote natural morphological processes River Chess (Cress Bed Villas) River Restoration Scheme | Due 2029-30 | Chess |
| 08TW101009 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 6.15Ha SUDS IA Removal, No screen required Storm Overflows action at Gerrards Cross STW | Due 2029-30 | Misbourne |
| 08TW101025 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 3,734m of sewer relining, 430m3 storage, 1.53Ha SUDS IA Removal, 20m3 screen Storm Overflows action at MARKYATE STW | Due 2029-30 | Ver |
| 09TW100006 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Weirhouse Mill Fish Pass | Due 2029-30 | Chess |
| 08TW100027 · a | WFD_IMP_PHYSHAB | Improvement | Implement a river restoration scheme to promote natural morphological processes Wraysbury River River Restoration Scheme | Due 2029-30 | Colne (Confluence with Chess to River Thames) |
53 of 53 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.