Before the works
An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.
If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.
When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.
| Overflow | Events | Its works | On record |
|---|---|---|---|
| Ffordd Penrhwylfa Meliden Storm Overflow | 2 | Llanasa STW | No measure |
| Dalar Wen Denbigh Storm Overflow | 1 | Denbigh STW | Measure linked |
| Panton Hall Denbigh Storm Overflow | 1 | Denbigh STW | Measure linked |
| Llanasa Headworks Storm Overflow | 1 | Llanasa STW | Measure linked |
| Brondyffyn Storm Overflow | 1 | Trefnant | Measure linked |
| Prestatyn the Mall Storm Overflow | 1 | Llanasa STW | Measure linked |
| Pentre Llanrhaeadr Storm Overflow | 1 | Llandyrnog S STW | Measure linked |
| Beacons Road And Grove Road Denbigh Storm Overflow | 1 | Denbigh STW | Measure linked |
| Meliden Road Prestatyn Storm Overflow | 1 | Llanasa STW | Measure linked |
| Victoria Road Prestatyn Storm Overflow | 1 | Llanasa STW | Measure linked |
| Denbigh Ruthin Road Storm Overflow | 1 | Denbigh STW | Measure linked |
| High Street St Asaph Storm Overflow | 1 | St Asaph STW | Measure linked |
| Plas Yn Green Storm Overflow | 1 | Denbigh STW | No measure |
| Towyn Storm Overflow | 1 | Rhyl Kinmel Bay Towyn STW | Measure linked |
| Roe Parc St Asaph Storm Overflow | 1 | St Asaph STW | Measure linked |
| Bastion Road Prestatyn Overflow | 1 | Llanasa STW | Measure linked |
What this needs to be reliable
The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.