Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The River Clwyd is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

13
Above the 2050 cap
of 31 tracked
7
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
18
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Llangernyw Wwtw Overflow
DCWW1659
2050137 ·22
101
0 events
-26%10.1×Falling — behind
Ruthin Wwtw Overflow
DCWW1759
205071 ·22
93
0 events
+31%9.3×Rising
B5382 Llangernyw Storm Overflow
DCWW1060
20500 ·22
88
0 events
—8.8×Rising
Henllan Wwtw Storm Overflow
DCWW1922
205072 ·22
59
0 events
-18%5.9×Falling — behind
Clawddnewydd Wwtw Storm Overflow
DCWW651
205033 ·22
38
0 events
+15%3.8×Rising
Panton Hall Denbigh Storm Overflow
DCWW1158
205042 ·22
34
0 events
-19%3.4×Falling — behind
Dalar Wen Denbigh Storm Overflow
DCWW987
205049 ·22
30
0 events
-39%3×Falling — behind
Pwll-glas Wwtw Inlet Storm Overflow
DCWW791
205029 ·25
29
0 events
0%2.9×—Falling — behind
Bodelwyddan Storm Tanks Storm Overflow
DCWW1917
205014 ·22
27
0 events
+93%2.7×Rising
Llanfair Talhaiarn Wwtw Storm Overflow
DCWW1503
205053 ·22
21
0 events
-60%2.1×Falling — behind
Dyserth Wwtw Storm Overflow
DCWW1308
20507 ·22
17
0 events
+143%1.7×Rising
Llanasa Headworks Storm Overflow
DCWW2108
205011 ·22
15
0 events
+36%1.5×Rising
Ffordd Penrhwylfa Meliden Storm Overflow
DCWW1293
20500 ·22
14
0 events
—1.4×Rising
Rhyl Coast Road Storm Overflow
DCWW170
205069 ·22
9
0 events
-87%0.9×Within the cap
Trefnant Storm Overflow
DCWW1329
20505 ·22
6
0 events
+20%0.6×Within the cap
Westbourne Grove Storm Overflow
DCWW193
20501 ·22
5
0 events
+400%0.5×Within the cap
Beacons Road And Grove Road Denbigh Storm Overflow
DCWW1375
20501 ·22
5
0 events
+400%0.5×Within the cap
The Boulevard Prestatyn Storm Overflow
DCWW155
20502 ·22
5
0 events
+150%0.5×Within the cap
Prestatyn the Mall Storm Overflow
DCWW175
20504 ·22
4
1 events
0%0.4×Within the cap
Brondyffyn Storm Overflow
DCWW1995
20502 ·22
4
0 events
+100%0.4×Within the cap
Southwest of York Close Prestatyn Overflow
DCWW164
20502 ·22
3
0 events
+50%0.3×Within the cap
Ysceifiog Storm Overflow
DCWW1914
20502 ·22
2
0 events
0%0.2×Within the cap
Abbey Road Denbigh Storm Overflow
DCWW1592
20500 ·22
1
0 events
—0.1×Within the cap
Clifton Park Road Rhyl Storm Overflow 2
DCWW87
20500 ·22
1
0 events
—0.1×Within the cap
Pentre Llanrhaeadr Storm Overflow
DCWW1140
20501 ·22
1
0 events
0%0.1×Within the cap
Rhuddlan Wwtw Storm Overflow
DCWW1109
205018 ·22
0
0 events
-100%0×Within the cap
Bastion Gardens Prestatyn Overflow
DCWW125
20500 ·22
0
0 events
—0×Within the cap
Tynewydd Road Storm Overflow
DCWW300
20501 ·22
0
0 events
-100%0×Within the cap
Ffordd Parc Bodnant Prestatyn Overflow
DCWW963
20500 ·22
0
0 events
—0×Within the cap
Nannerch Storm Overflow
DCWW1581
205025 ·22
0
0 events
-100%0×Within the cap
Pwll-glas Wwtw Storm Overflow
DCWW2310
205022 ·22
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →