Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
The Storm Overflows Discharge Reduction Plan covers England only. The River Clwyd is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Llangernyw Wwtw Overflow DCWW1659 | 2050 | 137 ·22 | 101 0 events | -26% | 10.1× | Falling — behind | |
| Ruthin Wwtw Overflow DCWW1759 | 2050 | 71 ·22 | 93 0 events | +31% | 9.3× | Rising | |
| B5382 Llangernyw Storm Overflow DCWW1060 | 2050 | 0 ·22 | 88 0 events | — | 8.8× | Rising | |
| Henllan Wwtw Storm Overflow DCWW1922 | 2050 | 72 ·22 | 59 0 events | -18% | 5.9× | Falling — behind | |
| Clawddnewydd Wwtw Storm Overflow DCWW651 | 2050 | 33 ·22 | 38 0 events | +15% | 3.8× | Rising | |
| Panton Hall Denbigh Storm Overflow DCWW1158 | 2050 | 42 ·22 | 34 0 events | -19% | 3.4× | Falling — behind | |
| Dalar Wen Denbigh Storm Overflow DCWW987 | 2050 | 49 ·22 | 30 0 events | -39% | 3× | Falling — behind | |
| Pwll-glas Wwtw Inlet Storm Overflow DCWW791 | 2050 | 29 ·25 | 29 0 events | 0% | 2.9× | — | Falling — behind |
| Bodelwyddan Storm Tanks Storm Overflow DCWW1917 | 2050 | 14 ·22 | 27 0 events | +93% | 2.7× | Rising | |
| Llanfair Talhaiarn Wwtw Storm Overflow DCWW1503 | 2050 | 53 ·22 | 21 0 events | -60% | 2.1× | Falling — behind | |
| Dyserth Wwtw Storm Overflow DCWW1308 | 2050 | 7 ·22 | 17 0 events | +143% | 1.7× | Rising | |
| Llanasa Headworks Storm Overflow DCWW2108 | 2050 | 11 ·22 | 15 0 events | +36% | 1.5× | Rising | |
| Ffordd Penrhwylfa Meliden Storm Overflow DCWW1293 | 2050 | 0 ·22 | 14 0 events | — | 1.4× | Rising | |
| Rhyl Coast Road Storm Overflow DCWW170 | 2050 | 69 ·22 | 9 0 events | -87% | 0.9× | Within the cap | |
| Trefnant Storm Overflow DCWW1329 | 2050 | 5 ·22 | 6 0 events | +20% | 0.6× | Within the cap | |
| Westbourne Grove Storm Overflow DCWW193 | 2050 | 1 ·22 | 5 0 events | +400% | 0.5× | Within the cap | |
| Beacons Road And Grove Road Denbigh Storm Overflow DCWW1375 | 2050 | 1 ·22 | 5 0 events | +400% | 0.5× | Within the cap | |
| The Boulevard Prestatyn Storm Overflow DCWW155 | 2050 | 2 ·22 | 5 0 events | +150% | 0.5× | Within the cap | |
| Prestatyn the Mall Storm Overflow DCWW175 | 2050 | 4 ·22 | 4 1 events | 0% | 0.4× | Within the cap | |
| Brondyffyn Storm Overflow DCWW1995 | 2050 | 2 ·22 | 4 0 events | +100% | 0.4× | Within the cap | |
| Southwest of York Close Prestatyn Overflow DCWW164 | 2050 | 2 ·22 | 3 0 events | +50% | 0.3× | Within the cap | |
| Ysceifiog Storm Overflow DCWW1914 | 2050 | 2 ·22 | 2 0 events | 0% | 0.2× | Within the cap | |
| Abbey Road Denbigh Storm Overflow DCWW1592 | 2050 | 0 ·22 | 1 0 events | — | 0.1× | Within the cap | |
| Clifton Park Road Rhyl Storm Overflow 2 DCWW87 | 2050 | 0 ·22 | 1 0 events | — | 0.1× | Within the cap | |
| Pentre Llanrhaeadr Storm Overflow DCWW1140 | 2050 | 1 ·22 | 1 0 events | 0% | 0.1× | Within the cap | |
| Rhuddlan Wwtw Storm Overflow DCWW1109 | 2050 | 18 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Bastion Gardens Prestatyn Overflow DCWW125 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Tynewydd Road Storm Overflow DCWW300 | 2050 | 1 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Ffordd Parc Bodnant Prestatyn Overflow DCWW963 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Nannerch Storm Overflow DCWW1581 | 2050 | 25 ·22 | 0 0 events | -100% | 0× | Within the cap | |
| Pwll-glas Wwtw Storm Overflow DCWW2310 | 2050 | 22 ·22 | 0 0 events | -100% | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →