Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Dragons Pit, BodminCSO159Bodmin (nanstallon) STWNo measure
Wadebridge pumping stationPS-CSO/EO128Wadebridge STWNo measure
Old Jail, BodminCSO121Bodmin (scarletts Well) STWNo measure
Blowing Hse Ln, BodminCSO112Bodmin (nanstallon) STWNo measure
Padstow Foreshore pumping stationPS-CSO/EO106Trecerus STWMeasure linked
Porthilly Cove pumping station, Porthilly 2PS-CSO/EO37Porthilly STWNo measure
Old Coach Rd, LanivetCSO24Bodmin (nanstallon) STWNo measure
Moyle Rd, PadstowCSO20Trecerus STWMeasure linked
New Polzeath pumping stationPS-CSO/EO18Porthilly STWNo measure
Padstow Harbour pumping stationPS-CSO/EO15Trecerus STWMeasure linked
Lanivet InnCSO11Bodmin (nanstallon) STWNo measure
Rock pumping station, St MinverPS-CSO/EO5Porthilly STWNo measure
Market Square, CamelfordCSO1Camelford STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.