Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Tatworth STWSSO SBB01209 | 2050 | 163 | 189 102 events | +16% | 18.9× | Rising | |
| Kilmington STW, AxminsterSSO SBB00631 | 2050 | 163 | 110 183 events | -33% | 11× | Falling — behind | |
| Winsham STWPS-CSO/EO SBB01370 | 2050 | 77 ·24 | 94 54 events | +22% | 9.4× | Rising | |
| Yarcombe STWSO SBB01382 | 2050 | 58 ·24 | 87 74 events | +50% | 8.7× | Rising | |
| Colyton STWSSO SBB00291 | 2050 | 63 | 75 50 events | +19% | 7.5× | Rising | |
| Mosterton pumping stationPS-CSO/EO SBB00810 | 2050 | 113 | 72 296 events | -36% | 7.2× | Falling — behind | |
| Offwell STWSO SBB00866 | 2050 | 41 ·24 | 71 29 events | +73% | 7.1× | Rising | |
| Railway Station, AxminsterCSO SBB01014 | 2050 | 74 ·24 | 68 37 events | -8% | 6.8× | Falling — behind | |
| Dalwood pumping stationPS-CSO/EO SBB00345 | 2050 | 97 ·24 | 65 53 events | -33% | 6.5× | Falling — behind | |
| Colyford pumping stationPS-CSO/EO SBB00290 | 2050 | 69 ·24 | 64 55 events | -7% | 6.4× | Falling — behind | |
| Horslears pumping station, AxminsterPS-CSO/EO SBB00599 | 2050 | 56 | 64 66 events | +14% | 6.4× | Rising | |
| Bridge House, ColyfordCSO SBB00154 | 2050 | 86 ·24 | 63 69 events | -27% | 6.3× | Falling — behind | |
| Musbury & Whitford STWPS-CSO/EO SBB00820 | 2050 | 45 | 61 123 events | +36% | 6.1× | Rising | |
| Seaton South STW, East DevonSSO SBB01067 | 2050 | 59 | 60 45 events | +2% | 6× | Rising | |
| Broadwindsor STWSO SBB00167 | 2050 | 88 | 55 52 events | -38% | 5.5× | Falling — behind | |
| Uplyme STWSSO SBB00726 | 2050 | 73 | 54 646 events | -26% | 5.4× | Falling — behind | |
| Tatworth STWSO SBB01208 | 2050 | 62 | 54 60 events | -13% | 5.4× | Falling — behind | |
| Stockland STWSSO SBB01173 | 2050 | 41 ·25 | 41 37 events | 0% | 4.1× | — | Falling — behind |
| Broadwindsor STWSSO SBB00168 | 2050 | 63 | 40 35 events | -37% | 4× | Falling — behind | |
| Hawkchurch STWSO SBB00548 | 2050 | 53 ·24 | 37 17 events | -30% | 3.7× | Falling — behind | |
| Perry St, TatworthCSO SBB00930 | 2050 | 11 | 36 70 events | +227% | 3.6× | Rising | |
| Axmouth pumping stationPS-CSO/EO SBB00059 | 2050 | 29 | 36 207 events | +24% | 3.6× | Rising | |
| Wilmington STWSSO SBB01365 | 2050 | 64 ·24 | 34 24 events | -47% | 3.4× | Falling — behind | |
| Horn Bridge pumping station, Lyme RegisPS-CSO/EO SBB00595 | 2050 | 25 | 32 40 events | +28% | 3.2× | Rising | |
| Branscombe STWSSO SBB00145 | 2050 | 10 | 29 48 events | +190% | 2.9× | Rising | |
| Chard Road, AxminsterCSO SBB00235 | 2050 | 9 | 29 56 events | +222% | 2.9× | Rising | |
| Drimpton pumping stationPS-CSO/EO SBB00377 | 2050 | 11 | 27 17 events | +145% | 2.7× | Rising | |
| Colyton Fire StationCSO SBB00451 | 2050 | 19 ·24 | 25 5 events | +32% | 2.5× | Rising | |
| Shand Park, AxminsterCSO SBB01074 | 2050 | 15 | 18 18 events | +20% | 1.8× | Rising | |
| ColytonCSO SBB00293 | 2050 | 14 ·24 | 13 7 events | -7% | 1.3× | Nearly there | |
| Clapton pumping station, CrewkernePS-CSO/EO SBB00270 | 2050 | 8 | 12 20 events | +50% | 1.2× | Rising | |
| Mill Ln, UplymeCSO SBB00777 | 2050 | 2 ·24 | 10 12 events | +400% | 1× | Within the cap | |
| Thorncombe STWSO SBB01240 | 2050 | 7 | 8 6 events | +14% | 0.8× | Within the cap | |
| Jericho, Lyme RegisCSO SBB00621 | 2050 | 9 | 8 1 events | -11% | 0.8× | Within the cap | |
| Whitford Road, MusburyCSO SBB01357 | 2050 | 2 | 5 5 events | +150% | 0.5× | Within the cap | |
| Gun Cliff pumping station, Lyme RegisPS-CSO/EO SBB00519 | 2050 | 6 | 4 6 events | -33% | 0.4× | Within the cap | |
| Goslings Bridge, Lyme RegisCSO SBB00505 | 2050 | 6 ·24 | 3 1 events | -50% | 0.3× | Within the cap | |
| Buckland St Mary STWSO SBB00182 | 2050 | 1 ·25 | 1 1 events | 0% | 0.1× | — | Within the cap |
| Harbour Road pumping station, SeatonPS-CSO/EO SBB00539 | 2050 | 14 | 0 0 events | -100% | 0× | Within the cap | |
| Branscombe pumping stationPS-CSO/EO SBB00144 | 2050 | 1 ·24 | 0 0 events | -100% | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →