Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

31
Above the 2050 cap
of 40 tracked
17
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
9
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Tatworth STWSSO
SBB01209
2050163
189
102 events
+16%18.9×Rising
Kilmington STW, AxminsterSSO
SBB00631
2050163
110
183 events
-33%11×Falling — behind
Winsham STWPS-CSO/EO
SBB01370
205077 ·24
94
54 events
+22%9.4×Rising
Yarcombe STWSO
SBB01382
205058 ·24
87
74 events
+50%8.7×Rising
Colyton STWSSO
SBB00291
205063
75
50 events
+19%7.5×Rising
Mosterton pumping stationPS-CSO/EO
SBB00810
2050113
72
296 events
-36%7.2×Falling — behind
Offwell STWSO
SBB00866
205041 ·24
71
29 events
+73%7.1×Rising
Railway Station, AxminsterCSO
SBB01014
205074 ·24
68
37 events
-8%6.8×Falling — behind
Dalwood pumping stationPS-CSO/EO
SBB00345
205097 ·24
65
53 events
-33%6.5×Falling — behind
Colyford pumping stationPS-CSO/EO
SBB00290
205069 ·24
64
55 events
-7%6.4×Falling — behind
Horslears pumping station, AxminsterPS-CSO/EO
SBB00599
205056
64
66 events
+14%6.4×Rising
Bridge House, ColyfordCSO
SBB00154
205086 ·24
63
69 events
-27%6.3×Falling — behind
Musbury & Whitford STWPS-CSO/EO
SBB00820
205045
61
123 events
+36%6.1×Rising
Seaton South STW, East DevonSSO
SBB01067
205059
60
45 events
+2%6×Rising
Broadwindsor STWSO
SBB00167
205088
55
52 events
-38%5.5×Falling — behind
Uplyme STWSSO
SBB00726
205073
54
646 events
-26%5.4×Falling — behind
Tatworth STWSO
SBB01208
205062
54
60 events
-13%5.4×Falling — behind
Stockland STWSSO
SBB01173
205041 ·25
41
37 events
0%4.1×—Falling — behind
Broadwindsor STWSSO
SBB00168
205063
40
35 events
-37%4×Falling — behind
Hawkchurch STWSO
SBB00548
205053 ·24
37
17 events
-30%3.7×Falling — behind
Perry St, TatworthCSO
SBB00930
205011
36
70 events
+227%3.6×Rising
Axmouth pumping stationPS-CSO/EO
SBB00059
205029
36
207 events
+24%3.6×Rising
Wilmington STWSSO
SBB01365
205064 ·24
34
24 events
-47%3.4×Falling — behind
Horn Bridge pumping station, Lyme RegisPS-CSO/EO
SBB00595
205025
32
40 events
+28%3.2×Rising
Branscombe STWSSO
SBB00145
205010
29
48 events
+190%2.9×Rising
Chard Road, AxminsterCSO
SBB00235
20509
29
56 events
+222%2.9×Rising
Drimpton pumping stationPS-CSO/EO
SBB00377
205011
27
17 events
+145%2.7×Rising
Colyton Fire StationCSO
SBB00451
205019 ·24
25
5 events
+32%2.5×Rising
Shand Park, AxminsterCSO
SBB01074
205015
18
18 events
+20%1.8×Rising
ColytonCSO
SBB00293
205014 ·24
13
7 events
-7%1.3×Nearly there
Clapton pumping station, CrewkernePS-CSO/EO
SBB00270
20508
12
20 events
+50%1.2×Rising
Mill Ln, UplymeCSO
SBB00777
20502 ·24
10
12 events
+400%1×Within the cap
Thorncombe STWSO
SBB01240
20507
8
6 events
+14%0.8×Within the cap
Jericho, Lyme RegisCSO
SBB00621
20509
8
1 events
-11%0.8×Within the cap
Whitford Road, MusburyCSO
SBB01357
20502
5
5 events
+150%0.5×Within the cap
Gun Cliff pumping station, Lyme RegisPS-CSO/EO
SBB00519
20506
4
6 events
-33%0.4×Within the cap
Goslings Bridge, Lyme RegisCSO
SBB00505
20506 ·24
3
1 events
-50%0.3×Within the cap
Buckland St Mary STWSO
SBB00182
20501 ·25
1
1 events
0%0.1×—Within the cap
Harbour Road pumping station, SeatonPS-CSO/EO
SBB00539
205014
0
0 events
-100%0×Within the cap
Branscombe pumping stationPS-CSO/EO
SBB00144
20501 ·24
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →