Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
The Storm Overflows Discharge Reduction Plan covers England only. The Alyn and Clywedog is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Maesgwyn Road Wrexham Storm Overflow DCWW870 | 2050 | 5 ·22 | 110 0 events | +2100% | 11× | Rising | |
| Rhosllanerchrugog Pant Storm Overflow DCWW1111 | 2050 | 58 ·22 | 73 0 events | +26% | 7.3× | Rising | |
| Llanarmon Yn Ial Wwtw Overflow DCWW1230 | 2050 | 54 ·22 | 59 0 events | +9% | 5.9× | Rising | |
| Mold Wwtw Storm Overflow DCWW2118 | 2050 | 47 ·22 | 56 0 events | +19% | 5.6× | Rising | |
| Afon Eitha Storm Overflow DCWW1387 | 2050 | 59 ·22 | 52 0 events | -12% | 5.2× | Falling — behind | |
| Bersham Colliery Railway Storm Overflow DCWW1373 | 2050 | 44 ·22 | 52 0 events | +18% | 5.2× | Rising | |
| Chambers Lane Mercia Drive Junction Storm Overflow No2 DCWW1913 | 2050 | 61 ·22 | 48 0 events | -21% | 4.8× | Falling — behind | |
| Llay Singrett Storm Overflow DCWW888 | 2050 | 69 ·22 | 47 0 events | -32% | 4.7× | Falling — behind | |
| Padeswood Road Buckley Storm Overflow DCWW1451 | 2050 | 57 ·22 | 47 0 events | -18% | 4.7× | Falling — behind | |
| Bronallt Leeswood Storm Oveerflow DCWW1040 | 2050 | 33 ·22 | 40 0 events | +21% | 4× | Rising | |
| A549 Mold Storm Overflow DCWW723 | 2050 | 54 ·22 | 39 0 events | -28% | 3.9× | Falling — behind | |
| Heol Penyfelin Nant Storm Overflow DCWW1250 | 2050 | 25 ·22 | 39 0 events | +56% | 3.9× | Rising | |
| Ffordd Treftadaeth Wrexham Overflow DCWW1640 | 2050 | 23 ·22 | 36 0 events | +57% | 3.6× | Rising | |
| Gresford Wwtw Storm Overflow DCWW1531 | 2050 | 0 ·22 | 36 0 events | — | 3.6× | Rising | |
| Bryn Glas Rhosllanerchrugog Storm Overflow DCWW1037 | 2050 | 2 ·22 | 36 0 events | +1700% | 3.6× | Rising | |
| Mercia Drive Mold Storm Overflow DCWW1905 | 2050 | 38 ·22 | 34 0 events | -11% | 3.4× | Falling — behind | |
| Llwyn Onn Estate Wrexham Storm Overflow DCWW885 | 2050 | 36 ·22 | 33 0 events | -8% | 3.3× | Falling — behind | |
| Gladstone Street Glanrafon Road Storm Overflow DCWW1285 | 2050 | 22 ·22 | 24 0 events | +9% | 2.4× | Rising | |
| Wats Duke Avenue Storm Overflow DCWW1478 | 2050 | 31 ·22 | 23 0 events | -26% | 2.3× | Falling — behind | |
| Rossett Level Crossing Storm Overflow DCWW1104 | 2050 | 0 ·22 | 22 0 events | — | 2.2× | Rising | |
| Cherry Tree Road Bradley Storm Overflow DCWW1014 | 2050 | 36 ·22 | 21 0 events | -42% | 2.1× | Falling — behind | |
| Colliery Road Rhostyllen Storm Overflow DCWW642 | 2050 | 1 ·22 | 19 0 events | +1800% | 1.9× | Rising | |
| Holland Road Brymbo Storm Overflow DCWW1245 | 2050 | 17 ·22 | 18 0 events | +6% | 1.8× | Rising | |
| Milford Street And Bro Alun Mold Overflow DCWW1585 | 2050 | 33 ·22 | 18 0 events | -45% | 1.8× | Falling — behind | |
| Pont Y Bodkin Lower Storm Overflow DCWW1437 | 2050 | 1 ·22 | 17 0 events | +1600% | 1.7× | Rising | |
| Bromfield Lane Mold Storm Overflow DCWW1364 | 2050 | 33 ·22 | 17 0 events | -48% | 1.7× | Falling — behind | |
| Llay Road Llay Storm Overflow DCWW1488 | 2050 | 29 ·22 | 15 0 events | -48% | 1.5× | Nearly there | |
| Church Road Minera Storm Overflow DCWW1009 | 2050 | 150 ·22 | 14 0 events | -91% | 1.4× | Nearly there | |
| Treuddyn Wwtw Storm Overflow DCWW960 | 2050 | 0 ·22 | 14 0 events | — | 1.4× | Rising | |
| Queens Way Wrexham Storm Overflow DCWW789 | 2050 | 9 ·22 | 14 0 events | +56% | 1.4× | Rising | |
| Rhyddyn Hill Caergwrle Storm Overflow DCWW1108 | 2050 | 18 ·22 | 13 0 events | -28% | 1.3× | Nearly there | |
| Aberderfyn Road Rhosllanerchrugog Storm Overflow DCWW2079 | 2050 | 0 ·22 | 13 0 events | — | 1.3× | Rising | |
| Corwen Road Junction Pontblyddyn Storm Overflow DCWW637 | 2050 | 2 ·22 | 12 0 events | +500% | 1.2× | Rising | |
| Bryn Awelon Mold Storm Overflow DCWW1038 | 2050 | 21 ·22 | 12 0 events | -43% | 1.2× | Nearly there | |
| Gas Lane Mold Storm Overflow DCWW1288 | 2050 | 3 ·22 | 10 0 events | +233% | 1× | Within the cap | |
| Tanyfron Road Southsea Storm Overflow DCWW1080 | 2050 | 58 ·22 | 9 0 events | -84% | 0.9× | Within the cap | |
| Rhosnesni Lane Wrexham Overflow DCWW2001 | 2050 | 1 ·22 | 7 1 events | +600% | 0.7× | Within the cap | |
| Ruthin Road Gegin Storm Overflow DCWW776 | 2050 | 5 ·22 | 6 0 events | +20% | 0.6× | Within the cap | |
| Brook Street & Vicarage Hill Wrexham Storm Overflow DCWW1362 | 2050 | 4 ·22 | 6 0 events | +50% | 0.6× | Within the cap | |
| Llanferres Storm Overflow DCWW900 | 2050 | 9 ·22 | 6 0 events | -33% | 0.6× | Within the cap | |
| Off Church Terrace Llandegla Storm Overflow DCWW830 | 2050 | 4 ·22 | 5 0 events | +25% | 0.5× | Within the cap | |
| Wrexham Acton Storm Overflow DCWW2018 | 2050 | 0 ·22 | 3 0 events | — | 0.3× | Within the cap | |
| Leeswood Bethania Storm Overflow DCWW919 | 2050 | 0 ·22 | 3 0 events | — | 0.3× | Within the cap | |
| Fford Argoed Fields Storm Overflow DCWW606 | 2050 | 0 ·22 | 3 0 events | — | 0.3× | Within the cap | |
| Heritage Way Bridge Storm Overflow DCWW937 | 2050 | 0 ·22 | 2 0 events | — | 0.2× | Within the cap | |
| Cefn Y Bedd Storm Overflow DCWW1017 | 2050 | 5 ·22 | 2 0 events | -60% | 0.2× | Within the cap | |
| Heol Y Fro Storm Overflow DCWW2370 | 2050 | 19 ·22 | 2 0 events | -89% | 0.2× | Within the cap | |
| Caer Estyn Storm Overflow DCWW1031 | 2050 | 3 ·22 | 1 0 events | -67% | 0.1× | Within the cap | |
| Pontybodkin Main Storm Overflow DCWW1906 | 2050 | 3 ·22 | 1 0 events | -67% | 0.1× | Within the cap | |
| Yorke Street Wrexham Storm Overflow DCWW2144 | 2050 | 0 ·22 | 1 0 events | — | 0.1× | Within the cap | |
| Queens Park Wrexham Storm Overflow DCWW1422 | 2050 | 53 ·22 | 1 0 events | -98% | 0.1× | Within the cap | |
| West View Penyffordd Storm Overflow DCWW1805 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Yorke Street And Mount Street Wrexham Storm Overflow DCWW1281 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Rivulet Road Wrexham Storm Overflow DCWW782 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap | |
| Bryn Coch Lane Mold Storm Overflow DCWW1358 | 2050 | 0 ·22 | 0 0 events | — | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →