What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100199a · 8eae21c7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ DYSERTH WWTW | Complete 2025-26 | Marchwiel near Wrexham WwTW Storm Overflow |
| DCWW100209a · 2b8bb729 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ FIVE FORDS STW | Complete 2025-26 | Marchwiel near Wrexham WwTW Storm Overflow |
| DCWW100224a · fad066c7 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ GRESFORD STW | Complete 2025-26 | Gresford WwTW Storm Overflow |
| DCWW100233a · bcb5cf72 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ HOPE STW | Complete 2025-26 | Hope WwTW Storm Overflow |
| DCWW100083a · b9417687 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANARMON-YN-IAL STW | Complete 2025-26 | Llanarmon Yn Ial WwTW Overflow |
| DCWW100272a · 327fe1ac | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LLANGERNYW PS | Complete 2025-26 | Mold WwTW Storm Overflow |
| DCWW100304a · 728dc3f4 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ MALLTRAETH WWTW TERMINAL | Complete 2025-26 | Mold WwTW Storm Overflow |
| DCWW100310a · 3e0d8049 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ MOLD STW MOLD FLINTSHIRE | Complete 2025-26 | Mold WwTW Storm Overflow |
| DCWW100387a · 469c20b0 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREBORTH STW (FINAL) BANGOR | Complete 2025-26 | Treuddyn WwTW Storm Overflow |
| DCWW100396a · d3a0d95e | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TREUDDYN | Complete 2025-26 | Treuddyn WwTW Storm Overflow |
| DCWW100071a · 66516031 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ TY GWYN WWTW (STW) BUCKLEY | Complete 2025-26 | Buckley Ty Gwyn Storm Overflow |
| DCWW102183a · 1e8821f6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAER ESTYN SPS | Due 2026-27 | Caer Estyn Storm Overflow |
| DCWW100203a · 0ad54bb9 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ ESGAIRGEILIOG CEINWS | Due 2026-27 | Marchwiel near Wrexham WwTW Storm Overflow |
| DCWW102129a · a3cb8bc1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ FFORDD OFFA RHOS | Due 2026-27 | Ffordd Offa Rhosllanerchrugog Storm Overflow |
| DCWW100222a · 5b947cf3 | W_U_MON4 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows WQ GREAT OAK (NR ABERGAVENNY) | Due 2026-27 | Gresford WwTW Storm Overflow |
| DCWW102132a · 2ec32f62 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ JOHNSTOWN (NR WREXHAM) BANGOR ROAD | Due 2026-27 | Bangor Road Rhosllanerchrugog Storm Overflow |
| DCWW100636a · 006cd8bc | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ MOLD | Due 2026-27 | Mold WwTW Storm Overflow |
| DCWW102136a · a332ec23 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTBLYDDYN N1 PSA ADJ DISUSED R/WAY EMB | Due 2026-27 | Pontblyddyn Dingle Road Storm Overflow |
| DCWW102864a · 8f344409 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ BUCKLEY TY GWYN (7CDC1107) | Due 2027-28 | Water body only |
| DCWW102861a · acb2efab | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ CILCAIN PANTYMWYN STW (7CDC1094) | Due 2027-28 | Water body only |
| DCWW102862a · 719f3216 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ LLANARMON-YN-IAL STW (7CDC1100) | Due 2027-28 | LLANARMON-YN-IAL |
| DCWW102863a · 5956a667 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ MOLD (SWK) (7CDC1103) | Due 2027-28 | Water body only |
| DCWW101680a · e2782002 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ RHOSESMOR STW(7CDC0906) | Due 2027-28 | Water body only |
| DCWW101434a · 068026dd | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ACTON SPS, OPP 3 SMITHY CLOSE, WILLOW VIEW, WREXHAM | Due 2029-30 | Wrexham Acton Storm Overflow |
| DCWW102007a · 786a824c | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Afon Eitha CSO | Due 2029-30 | Afon Eitha Storm Overflow |
| DCWW101373a · 7705333e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ARGOED PUMPING STATION AT MOLD | Due 2029-30 | Fford Argoed Fields Storm Overflow |
| DCWW101582a · b802999c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRADLEY OLD STW - SSO Cherry Tree Road, Bradley, Gwersyllt, Wrexham | Due 2029-30 | Cherry Tree Road Bradley Storm Overflow |
| DCWW101582a · ca00d62e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Bridge Inn Pumping Station | Due 2029-30 | Corwen Road Junction Pontblyddyn Storm Overflow |
| DCWW101365a · 16907ee1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRIDGE INN PUMPING STATION, WREXHAM RD, PONTBLYDDYN | Due 2029-30 | Corwen Road Junction Pontblyddyn Storm Overflow |
| DCWW102499a · 46b41c5b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Bromfield Lane CSO | Due 2029-30 | Bromfield Lane Mold Storm Overflow |
| DCWW102513a · 41d13b33 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Brymbo Combined SPS CSO | Due 2029-30 | Holland Road Brymbo Storm Overflow |
| DCWW101416a · b16ef328 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Brymbo SPS CSO, Brymbo, Wrexham LL11 5DQ | Due 2029-30 | Holland Road Brymbo Storm Overflow |
| DCWW102841a · b7b15479 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRYN-Y-BRAIN CSO | Due 2029-30 | Bryn Glas Rhosllanerchrugog Storm Overflow |
| DCWW101400a · 252648fb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Buckley Southdown Park PS | Due 2029-30 | Padeswood Road Buckley Storm Overflow |
| DCWW102830a · 7592a32e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BUCKLEY SOUTHDOWN PARK PS | Due 2029-30 | Padeswood Road Buckley Storm Overflow |
| DCWW102504a · 8df29c27 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BUCKLEY TY GWYN EOF for SWK | Due 2029-30 | Buckley Ty Gwyn Storm Overflow |
| DCWW101414a · 46b354c3 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CAER ESTYN SEWAGE PUMPING STATION | Due 2029-30 | Caer Estyn Storm Overflow |
| DCWW101582a · 149748c6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERGWRLE - RHYDDYN HILL ROAD CSO | Due 2029-30 | Rhyddyn Hill Caergwrle Storm Overflow |
| DCWW101582a · 79598af1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERGWRLE DERBY ROAD CSO | Due 2029-30 | Hope Street Storm Overflow |
| DCWW101409a · 8fe80eb7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CEFN Y BEDD PS | Due 2029-30 | Cefn Y Bedd Storm Overflow |
| DCWW101582a · 0cb7fd73 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cefn y Bedd PS Mold Road, Sydallt, Gwersyllt, Wrexham | Due 2029-30 | Cefn Y Bedd Storm Overflow |
| DCWW102508a · 2c45314f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CEFN-Y-BEDD (NR LLAY) GWERN ALYN PS | Due 2029-30 | East of railway Cefn Y Bedd Storm Overflow |
| DCWW101403a · d4edc50d | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CEFYN Y BEDD GWERN ALYN PS | Due 2029-30 | East of railway Cefn Y Bedd Storm Overflow |
| DCWW101709a · b3d1dc51 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ CILCAIN PANTYMWYN STW | Due 2029-30 | Water body only |
| DCWW101709b · 7473b237 | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ CILCAIN PANTYMWYN STW | Due 2029-30 | Water body only |
| DCWW101417a · 3de9b35c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COEDPOETH NANT PS | Due 2029-30 | Heol Penyfelin Nant Storm Overflow |
| DCWW101582a · 9acbd584 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Adj Mount St/Yorke St | Due 2029-30 | Yorke Street and Mount Street Wrexham Storm Overflow |
| DCWW101582a · 68c5d2a3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Woodland View Cefn Y Bedd | Due 2029-30 | Cefn Y Bedd Storm Overflow |
| DCWW101582a · 7cfd28c6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO Nr Rivulet Rd Queens Park Wrex | Due 2029-30 | Rivulet Road Wrexham Storm Overflow |
| DCWW101582a · ce2649b7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO serving Hope Parent CSO Sarn Lane, Hope, Caergwrle, Flintshire | Due 2029-30 | Hope WwTW Storm Overflow |
| DCWW101349a · c329fe42 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CYMAU PUMPING STATION/CSO, OFF CYMAU RD, CYMAU | Due 2029-30 | Hope Cymau Storm Overflow |
| DCWW102492a · 379a8848 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CYMAU SPS | Due 2029-30 | Hope Cymau Storm Overflow |
| DCWW101381a · 4865e5fb | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ DERBY SEWAGE PUMPING STATION, CAERGWRLE | Due 2029-30 | Hope Street Storm Overflow |
| DCWW101348a · 013d99d7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ FFRITH PUMPING STATION /CSO | Due 2029-30 | Ffrith Storm Overflow |
| DCWW101582a · f7fb084d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ffrith SPS | Due 2029-30 | Ffrith Storm Overflow |
| DCWW100667a · 7fdb5884 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ FIVE FORDS (WREXHAM) | Due 2029-30 | Marchwiel near Wrexham WwTW Storm Overflow |
| DCWW102815a · 73355570 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GEGIN RUTHIN ROAD | Due 2029-30 | Ruthin Road Gegin Storm Overflow |
| DCWW100670a · 3e855aba | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ GRESFORD | Due 2029-30 | Gresford WwTW Storm Overflow |
| DCWW102840a · 0ab03b1c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Gresford Fishpond CSO | Due 2029-30 | Pen Y Llyn Gwersyllt Storm Overflow |
| DCWW101582a · a0aceab0 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GRESFORD STW | Due 2029-30 | Gresford WwTW Storm Overflow |
| DCWW101582a · 6c90cbc5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Gwynfryn CSO | Due 2029-30 | Church Road Minera Storm Overflow |
| DCWW101582a · f66bbecf | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HENDRE ROAD SSO | Due 2029-30 | Off Church Terrace Llandegla Storm Overflow |
| DCWW102009a · 1b1d9b57 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ HEOL PENYFELIN NANT | Due 2029-30 | Heol Penyfelin Nant Storm Overflow |
| DCWW101582a · 93efc3cc | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOPE SARN LANE CSO | Due 2029-30 | Sarn Lane Hope Storm Overflow |
| DCWW101484a · 45d03374 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Kings Mill CSO, Queens Park, Wrexham LL13 0JY | Due 2029-30 | Queens Way Wrexham Storm Overflow |
| DCWW101582a · 827baeda | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Leeswood Bethania SPS | Due 2029-30 | Leeswood Bethania Storm Overflow |
| DCWW101354a · 73fc29ca | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LEESWOOD BETHANIA SPS | Due 2029-30 | Leeswood Bethania Storm Overflow |
| DCWW101357a · 6632ab77 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LEESWOOD TRANSFER PUMPING STATION | Due 2029-30 | Bronallt Leeswood Storm Oveerflow |
| DCWW101339a · a7baef6c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANARMON YN IAL WASTEWATER TREATMENT WORKS PUMPING STATION | Due 2029-30 | Llanarmon Yn Ial WwTW Overflow |
| DCWW101736a · d199cd73 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANARMON-YN-IAL STW | Due 2029-30 | LLANARMON-YN-IAL |
| DCWW102004a · 9ab52955 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ LLANARMON-YN-IAL STW | Due 2029-30 | Llanarmon Yn Ial WwTW Overflow |
| DCWW101582a · 1e0ebde3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llandegla CSO | Due 2029-30 | Off Church Terrace Llandegla Storm Overflow |
| DCWW102515a · 25bbdcee | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLANFERRES PS | Due 2029-30 | Llanferres Storm Overflow |
| DCWW101428a · 5cbffd80 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANFERRIS PS LLANFERRES | Due 2029-30 | Llanferres Storm Overflow |
| DCWW101861a · 73c25996 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ LLANFYNYDD SEWAGE TREATMENT WORKS | Due 2029-30 | Water body only |
| DCWW102484a · 981aeb26 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLAY CHAPEL LANE OPP GARDEN CENTRE | Due 2029-30 | Llay Road Llay Storm Overflow |
| DCWW101582a · b3cde165 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLAY SINGRET (BOREEN CAM) CSO Foxwood Rise, Llay, Wrexham | Due 2029-30 | Llay Singrett Storm Overflow |
| DCWW101582a · ebc3189d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLWYN ONN CSO | Due 2029-30 | Llwyn Onn Estate Wrexham Storm Overflow |
| DCWW101380a · 985fdfb5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LOGGERHEADS SEWAGE PUMPING STATION | Due 2029-30 | Water body only |
| DCWW101739a · ed5863b8 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ MAES Y GROES STW | Due 2029-30 | Water body only |
| DCWW101739b · aeceff1b | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ MAES Y GROES STW | Due 2029-30 | Water body only |
| DCWW102517a · 49aeb7df | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MAESGWYN CSO | Due 2029-30 | Maesgwyn Road Wrexham Storm Overflow |
| DCWW101435a · d889618c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Maesgwyn Sewage Pumping Station | Due 2029-30 | Maesgwyn Road Wrexham Storm Overflow |
| DCWW101582a · 4c55bfa4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mold Argoed CSO | Due 2029-30 | Fford Argoed Fields Storm Overflow |
| DCWW102509a · 369cff7a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mold Bryn Awelon (New) | Due 2029-30 | Bryn Awelon Mold Storm Overflow |
| DCWW102824a · 9f434e8c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MOLD BRYN COCH LANE/LON Y PARC | Due 2029-30 | Bryn Coch Lane Mold Storm Overflow |
| DCWW101582a · 12c872d6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mold Football Club Drice CSO | Due 2029-30 | Maes Y Dre Mold Storm Overflow |
| DCWW102823a · 2b5a252f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MOLD GAS LANE | Due 2029-30 | Gas Lane Mold Storm Overflow |
| DCWW102498a · 369419c7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MOLD GLADSTONE STREET/GLAN YR AFON ROAD | Due 2029-30 | Gladstone Street Glanrafon Road Storm Overflow |
| DCWW101582a · cac9d967 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mold Old St Davids Lane/Bridge St CSO | Due 2029-30 | Victoria Terrace Mold Storm Overflow |
| DCWW101582a · 2ec09a3c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mynydd Isa Chambers lane/Mercia Drive CSO | Due 2029-30 | Chambers Lane Mercia Drive Junction Storm Overflow |
| DCWW101405a · a1e246ca | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MYNYDD ISA MOLD ROAD/MERCIA DRIVE CSO | Due 2029-30 | Mercia Drive Mold Storm Overflow |
| DCWW102514a · 5bacf5ef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MYNYDD ISA WATS DYKE AVENUE PS | Due 2029-30 | Wats Duke Avenue Storm Overflow |
| DCWW102826a · 1e8823ac | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ NEW BROUGHTON | Due 2029-30 | Heritage Way Bridge Storm Overflow |
| DCWW101410a · f31a27a4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PANDY SEWAGE PUMPING STATION, PANDY INDUSTRIAL ESTATE | Due 2029-30 | Pandy Overflow |
| DCWW101404a · e29d281c | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PEN Y FFORDD WEST VIEW PS | Due 2029-30 | West View Penyffordd Storm Overflow |
| DCWW101582a · 9d831ad6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pen Y Ffordd West View SPS | Due 2029-30 | West View Penyffordd Storm Overflow |
| DCWW101744a · b172d18a | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. for P and Ammonia WQ Pen-y-stryt Wastewater Treatment Works | Due 2029-30 | Water body only |
| DCWW101457a · 38a1619b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penyfford Terminal Pumping Station | Due 2029-30 | West View Penyffordd Storm Overflow |
| DCWW102550a · e2db3564 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penyffordd Transfer CSO | Due 2029-30 | West View Penyffordd Storm Overflow |
| DCWW102481a · 29b5903c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PLAS GRONO ROAD CSO | Due 2029-30 | Colliery Road Rhostyllen Storm Overflow |
| DCWW101582a · f60c92c9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pont y Bodkin Lower PS | Due 2029-30 | Pont Y Bodkin Lower Storm Overflow |
| DCWW101423a · ebd914e5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PONT Y BODKIN LOWER PS | Due 2029-30 | Pont Y Bodkin Lower Storm Overflow |
| DCWW101422a · 654ce654 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PONT Y BODKIN MAIN PS | Due 2029-30 | Pontybodkin Main Storm Overflow |
| DCWW101421a · f8d8797b | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PONTBLYDDYN No1 SPS | Due 2029-30 | Pontblyddyn Dingle Road Storm Overflow |
| DCWW102844a · 58b6842d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYBODKIN MAIN PS | Due 2029-30 | Pontybodkin Main Storm Overflow |
| DCWW102479a · d60c4712 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Queensway Ind Est CSO Wrexham | Due 2029-30 | Queens Way Wrexham Storm Overflow |
| DCWW101323a · 2b99c7f0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RHOS BERSE RD SPS, COEDPOETH, WREXHAM | Due 2029-30 | Water body only |
| DCWW101746a · 9f17b15e | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ RHOSESMOR STW | Due 2029-30 | Water body only |
| DCWW102842a · 97f8d939 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHOSLLANERCHRUGOG ABERDERFYN | Due 2029-30 | Aberderfyn Road Rhosllanerchrugog Storm Overflow |
| DCWW101747a · 39f08398 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ RHYDYMWYN STW | Due 2029-30 | Water body only |
| DCWW101582a · df46631a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rhydymwyn Wastewater Treatment Works Storm Overflow | Due 2029-30 | Water body only |
| DCWW102482a · e13550f9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ROSSETT LEVEL CROSSING | Due 2029-30 | Rossett Level Crossing Storm Overflow |
| DCWW102827a · 45208273 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ruabon CSO Ruabon New Hall road | Due 2029-30 | New Hall Road Ruabon Storm Overflow |
| DCWW101582a · 9e86b5da | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Ruabon Paddock Row CSO | Due 2029-30 | New Hall Road Ruabon Storm Overflow |
| DCWW101415a · cb353726 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RUABON PS | Due 2029-30 | New Hall Road Ruabon Storm Overflow |
| DCWW102008a · a15f2fe7 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Ruabon SPS | Due 2029-30 | New Hall Road Ruabon Storm Overflow |
| DCWW101582a · 3456c22e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ SEWERAGE SYSTEM WEST OF WEALDS CHES CSO | Due 2029-30 | Yorke Street Wrexham Storm Overflow |
| DCWW102528a · f5c26683 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TALWRN RD NO 1 | Due 2029-30 | Coedpoeth Talwrn Road No.1 Storm Overflow |
| DCWW101582a · 9a4826ef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Talwrn Road No 2 CSO Pentre Fron Road, Coedpoeth, Wrexham, | Due 2029-30 | Heol Llewelyn Coedpoeth Storm Overflow |
| DCWW101749a · 611e29e3 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ Treuddyn | Due 2029-30 | TREUDDYN |
| DCWW101863a · df96b6c9 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ TREUDDYN BRIDGE TERRACE STW | Due 2029-30 | TREUDDYN |
| DCWW101864a · ab29e211 | W_HR_P_ND_IMP1 | Improvement | Implementation of actions to prevent deterioration to achieve the 5mg/l “back stop” limit in a Special Area of Conservation (SAC) river catchment, where the waterbody meets the Phosphate standard but where there is evidence of a risk of failure. WQ TREUDDYN LODGE VILLAS STW | Due 2029-30 | Water body only |
| DCWW101749b · d7497d7a | W_HR_AMM_T_IMP1 | Improvement | Operational costs relating to Ammonia permit condition
Implementation of actions to meet Total Ammonia standards at required water company assets to address observed and/or predicted failure of Total Ammonia standards in Special Area of Conservation (SAC) river catchments. WQ TREUDDYN STW | Due 2029-30 | TREUDDYN |
| DCWW102502a · e93e9643 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Treuddyn SWK CSO | Due 2029-30 | Treuddyn WwTW Storm Overflow |
| DCWW101424a · 9e2af811 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Wats Dyke Avenue SPS, Mynydd Isa | Due 2029-30 | Chambers Lane Mercia Drive Junction Storm Overflow |
| DCWW101582a · 46d7bf05 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Wrexham Acton SPS | Due 2029-30 | Wrexham Acton Storm Overflow |
| DCWW102480a · 84eaad6d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WREXHAM BROOK STREET O/S TOP RANK CLUB | Due 2029-30 | Brook Street & Vicarage Hill Wrexham Storm Overflow |
| DCWW102510a · 0406d732 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WREXHAM CSO UPSTREAM OF PANDY PS | Due 2029-30 | Pandy Overflow |
| DCWW102839a · 67e5d4ca | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WREXHAM PARK AVENUE | Due 2029-30 | Rhosnesni Lane Wrexham Overflow |
| DCWW102478a · 856810a2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ WREXHAM QUEENS PARK MINAFON | Due 2029-30 | Queens Park Wrexham Storm Overflow |
131 of 131 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.