DonateLog in
River Hub
NRW sampling point

Input to 3rd Lagoon

Sampled by Natural Resources Wales on 4 visits in 2026.

Dissolved oxygen

2026: avg 97 · min 94 % saturation
60801001202026-01-28: 94.4 % saturation2026-02-24: 98.9 % saturation2026-03-11: 96.4 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

6.0–7.4 °C

Warm water holds less oxygen. There is no river standard for temperature here.

02.557.5102026-01-28: 6 °C2026-02-24: 7.4 °C2026-03-11: 7.3 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Aluminium (µg/l)

NRW sampling point S6720033 · 969 readings of 48 tests since 2023.

DateResultUnitSample
2026-03-11 10:4718.7µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2026-02-24 10:3946.6µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2026-01-28 11:4266.3µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-11-26 11:3049.2µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-28 11:08< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-09-24 11:02< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-06-23 10:45< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-05-29 10:55< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-24 10:49< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-03-20 10:50< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-19 11:4541.3µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-01-22 11:1760.3µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-12-04 09:5855.4µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-13 09:59< 10µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-23 10:0634.5µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-02 10:5073µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-11 14:1383.4µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-08-21 09:0123µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-07-24 09:52< 10µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-06-26 10:3021.8µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-03-14 10:5047µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-02-20 10:16118µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-01-25 10:4371.4µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-12-06 10:3759.2µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-11-15 10:35111µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-10-19 10:5028.1µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-09-20 11:45388µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-08-31 12:5078.9µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-07-26 11:1554.2µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-06-06 10:40< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-05-18 10:57< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-04-25 10:3610.7µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-04-05 11:1525.3µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-03-15 10:4265µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-01-26 11:5123.5µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Alyn and Clywedog.

Input to 3rd Lagoon: NRW water tests — Alun a Chlywedog / Alyn and Clywedog Data