DonateLog in
River Hub
NRW sampling point

Input to 1st Lagoon

Sampled by Natural Resources Wales on 4 visits in 2026.

Dissolved oxygen

2026: avg 100 · min 96 % saturation
60801001202026-01-28: 95.9 % saturation2026-02-24: 101.7 % saturation2026-03-11: 102.4 % saturation
High ≥ 80Good ≥ 75Moderate ≥ 64Poor ≥ 50Bad < 50

Water temperature

6.3–8.3 °C

Warm water holds less oxygen. There is no river standard for temperature here.

02.557.5102026-01-28: 6.3 °C2026-02-24: 8.3 °C2026-03-11: 7.4 °C

Shading shows the Water Framework Directive river standards. Hollow dots are readings below the lab’s detection limit, drawn at the limit; averages count them at half the limit. Bands are indicative:Natural Resources Wales’s formal classification also uses percentiles and, for phosphate, limits set for each stretch of river.

Every reading: Aluminium, Dissolved (µg/l)

NRW sampling point S6720032 · 841 readings of 48 tests since 2023.

DateResultUnitSample
2026-03-11 11:36< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2026-02-24 11:3013.6µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2026-01-28 13:0017.8µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-11-26 12:24< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-10-28 12:05< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-09-24 12:03< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-05-29 11:57< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-04-24 11:53< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-03-20 11:4212.1µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-02-19 12:52< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2025-01-22 13:0411.5µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-12-04 11:3017.3µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-11-13 11:34< 10µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-23 10:5415.4µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-10-02 12:4840.9µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-09-11 12:49< 10µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-07-24 12:00< 10µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-03-14 12:0621.1µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-02-20 11:5012.3µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2024-01-25 12:3411.2µg/lRIVER / RUNNING SURFACE WATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-12-06 12:5724.8µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-11-15 12:3529.7µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-10-19 13:3077.4µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-09-20 13:4927.4µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-07-26 13:55< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-05-18 12:51< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-04-25 12:41< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-04-05 13:31< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-03-15 13:3425.9µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)
2023-01-26 14:06< 10µg/lMINEWATER · PLANNED INVESTIGATION (LOCAL MONITORING)

Source: Natural Resources Wales Open Water Quality Archive, Open Government Licence. The regulator’s own monitoring of the Alyn and Clywedog.