Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

The Storm Overflows Discharge Reduction Plan covers England only. The Afon Lwyd is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.

33
Above the 2050 cap
of 51 tracked
10
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
18
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Riverside Car Park Storm Overflow
DCWW2312
20500 ·22
113
0 events
—11.3×Rising
Viaduct Road Garndiffaith Storm Overflow
DCWW1938
205078 ·22
111
0 events
+42%11.1×Rising
Griffithstown Subsidiary Sewer Storm Overflow
DCWW946
205095 ·22
98
0 events
+3%9.8×Rising
Cwmbran Porthmawr Road Storm Overflow
DCWW2166
205099 ·22
93
0 events
-6%9.3×Falling — behind
Old Road Storm Overflow
DCWW1673
2050104 ·22
82
0 events
-21%8.2×Falling — behind
New Inn New Road Storm Overflow
DCWW2165
205091 ·22
80
0 events
-12%8×Falling — behind
Cwmbran Chapen Lane Storm Overflow
DCWW624
205034 ·22
68
0 events
+100%6.8×Rising
Pontypool Park West Storm Overflow
DCWW796
205069 ·22
65
0 events
-6%6.5×Falling — behind
Pontypool Fountain Road Storm Overflow
DCWW1430
205063 ·22
60
0 events
-5%6×Falling — behind
Abersychan Cwmavon Road Storm Overflow
DCWW1065
205083 ·22
58
0 events
-30%5.8×Falling — behind
Bridge Street Blaenavon Storm Overflow
DCWW449
205069 ·22
55
0 events
-20%5.5×Falling — behind
Freeholdland Road Storm Overflow
DCWW1290
205047 ·22
52
0 events
+11%5.2×Rising
Brookland Terrace Recreation Ground Storm Overflow
DCWW686
205041 ·22
49
0 events
+20%4.9×Rising
Bellevue Road Storm Overflow
DCWW2031
205056 ·22
43
0 events
-23%4.3×Falling — behind
Avon Road Blaenavon Storm Overflow
DCWW1957
205055 ·22
42
0 events
-24%4.2×Falling — behind
Cwmavon Road Garndiffaith No.3 Storm Overflow
DCWW1670
205051 ·22
41
0 events
-20%4.1×Falling — behind
Pontnewyndd Hospital Road Storm Overflow
DCWW798
205051 ·22
40
0 events
-22%4×Falling — behind
Charles Street Blaenavon Storm Overflow
DCWW658
205080 ·22
40
0 events
-50%4×Falling — behind
Cwmavon Road Cwmavon Storm Overflow
DCWW412
20509 ·22
38
0 events
+322%3.8×Rising
Avondale Road Sebastopol Cwmbran Storm Overflow
DCWW457
205047 ·22
37
0 events
-21%3.7×Falling — behind
West Wainfelin Road Pontypool Overflow
DCWW1628
205025 ·22
35
0 events
+40%3.5×Rising
Snatchwood Road Storm Overflow
DCWW765
205055 ·22
32
0 events
-42%3.2×Falling — behind
Pontypool Hanbury Road Storm Overflow
DCWW2085
20502 ·22
31
0 events
+1450%3.1×Rising
Llanfrechfa Storm Tanks Overflow
DCWW1856
205029 ·25
29
0 events
0%2.9×—Falling — behind
Trosnant Street Pontypool Storm Overflow
DCWW381
205046 ·22
29
0 events
-37%2.9×Falling — behind
Green Willows Storm Overflow
DCWW947
205028 ·22
28
0 events
0%2.8×Falling — behind
Blaenavon Forgeside Storm Overflow
DCWW1978
205039 ·22
24
0 events
-38%2.4×Falling — behind
Rede Road Storm Overflow
DCWW1794
205043 ·22
24
0 events
-44%2.4×Falling — behind
Polo Grounds Storm Overflow
DCWW506
205019 ·22
21
0 events
+11%2.1×Rising
Llwyn Onn Storm Overflow
DCWW1487
205024 ·22
20
0 events
-17%2×Falling — behind
East Wainfelin Road Pontypool Overflow
DCWW1306
205019 ·22
14
0 events
-26%1.4×Nearly there
Edlogan Way 2 Overflow
DCWW2352
205013 ·25
13
0 events
0%1.3×—Nearly there
Trevethin Storm Tank Storm Overflow
DCWW387
205040 ·22
12
0 events
-70%1.2×Nearly there
Tram Lane Storm Overflow
DCWW2095
20500 ·22
10
0 events
—1×Within the cap
Crumlin Road Pontypool 2 Storm Overflow
DCWW2054
20500 ·22
9
0 events
—0.9×Within the cap
Turners End Cwmbran Overflow
DCWW1630
205010 ·23
8
0 events
-20%0.8×Within the cap
Beaumaris Drive Storm Overflow
DCWW1374
20501 ·22
7
0 events
+600%0.7×Within the cap
Olway Close Front Storm Overflow
DCWW1454
205025 ·22
5
0 events
-80%0.5×Within the cap
Turners End Overflow
DCWW1703
20500 ·23
4
0 events
—0.4×Within the cap
Woodland View Pontypool Storm Overflow
DCWW751
205011 ·22
4
0 events
-64%0.4×Within the cap
Middle Coaedcae Road Blaenavon Overflow
DCWW1666
20500 ·22
3
0 events
—0.3×Within the cap
Rosemary Lane Pontypool Storm Overflow
DCWW482
20502 ·22
2
0 events
0%0.2×Within the cap
Mill Road Pontnewynydd 1 Storm Overflow
DCWW1473
20505 ·22
2
0 events
-60%0.2×Within the cap
Upper Hospital Road Pontnewynydd Storm Overflow
DCWW570
20503 ·22
1
0 events
-67%0.1×Within the cap
Varteg Road Blaenavon Overflow
DCWW1687
20500 ·22
1
0 events
—0.1×Within the cap
Pontypool Limekiln Road Storm Overflow
DCWW1428
20500 ·22
0
0 events
—0×Within the cap
Llangorse Road Storm Overflow
DCWW1501
20500 ·22
0
0 events
—0×Within the cap
Olway Close Rear Storm Overflow
DCWW2069
20500 ·22
0
0 events
—0×Within the cap
Allgood Avenue Blaenavon Overflow
DCWW1662
205057 ·22
0
0 events
-100%0×Within the cap
Pontypool Leigh Road Storm Overflow
DCWW1429
20500 ·22
0
0 events
—0×Within the cap
Fairview Court Storm Overflow
DCWW397
20500 ·22
0
0 events
—0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →