What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100342a · 2f975ff5 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PONTHIR STW PONTHIR NEWPORT | Complete 2025-26 | Llanfrechfa Storm Tanks Overflow |
| DCWW102165a · fe8e9e94 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ THE MEADS CSO, LLANTARNAM | Due 2026-27 | Green Willows Storm Overflow |
| DCWW101582a · aaa45383 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Abersychan CSO Coed-Yr-Eos Farm | Due 2029-30 | Abersychan Cwmavon Road Storm Overflow |
| DCWW102357a · 9ed565df | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Bellevue Road CSO, Cwmbran | Due 2029-30 | Bellevue Road Storm Overflow |
| DCWW102263a · 28b2b3f1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BLAENAVON FORGE SIDE CSO | Due 2029-30 | Blaenavon Forgeside Storm Overflow |
| DCWW101582a · d12ec87a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Brookland Terrace Rec Ground CSO | Due 2029-30 | Brookland Terrace Recreation Ground Storm Overflow |
| DCWW100703a · 00305aa8 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Caerleon (Usk Road) PS | Due 2029-30 | Caerleon Road Ponthir Overflow |
| DCWW101582a · 27e8265a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CAERLEON WWTW (STW) CSO CAERLEON | Due 2029-30 | Caerleon Road Ponthir Overflow |
| DCWW101582a · 7232ea9c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Charles Street CSO | Due 2029-30 | Charles Street Blaenavon Storm Overflow |
| DCWW102010a · 24aa927b | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Charles Street CSO, Blaenavon | Due 2029-30 | Charles Street Blaenavon Storm Overflow |
| DCWW101582a · 02e1f3ef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Coed Eva Mill CSO Coed Eva Cwmbran | Due 2029-30 | Water body only |
| DCWW102262a · 15b5642d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ COED FARM CSO | Due 2029-30 | Cwmavon Road Blaenavon No 1 Storm Overflow |
| DCWW101582a · 9b8c7a2e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Convent Garden CSO, Llantarnam | Due 2029-30 | Llantarnam Covent Grounds Storm Overflow |
| DCWW101582a · 4e1557cb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO and EO at Mawddach Crescent SPS | Due 2029-30 | Riverside Car Park Storm Overflow |
| DCWW101582a · 09c79df2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Blaenavon Station Terrace | Due 2029-30 | Bridge Street Blaenavon Storm Overflow |
| DCWW101582a · 3a86f39a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Crumlin Rd 2, Pontypool | Due 2029-30 | Crumlin Road Pontypool 2 Storm Overflow |
| DCWW101582a · 143fa319 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at PONTYPOOL CHARLESVILLE TRUNK SEWAR | Due 2029-30 | Fairview Court Storm Overflow |
| DCWW101582a · 9022e39b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Rosemary lane End of Car Park | Due 2029-30 | Rosemary Lane Pontypool Storm Overflow |
| DCWW101582a · 0b8658f3 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO OPPOSITE THE JOB CENTRE IN Riverside Walk, Trosnant, Pontymoile, Pontypool | Due 2029-30 | Riverside Car Park Storm Overflow |
| DCWW101927a · d7128f9a | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Cwmavon Rising Sun Bridge CSO | Due 2029-30 | Cwmavon Road Garndiffaith No.3 Storm Overflow |
| DCWW102260a · 81b35430 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CWMBRAN CHAPEL LANE | Due 2029-30 | Cwmbran Chapen Lane Storm Overflow |
| DCWW102261a · d17c2d4d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CWMBRAN PONTNEWYDD STANLEY PLACE | Due 2029-30 | Pontnewydd Cwmbran Road Storm Overflow |
| DCWW101582a · 1a142b2d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cwmbran Somerset Rd CSO | Due 2029-30 | Maes Ffynnon Storm Overflow |
| DCWW101582a · c9114e8a | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cwmbran Woodside Road CSO | Due 2029-30 | Cwmbran Woodside Road Storm Overflow |
| DCWW101582a · c88407c4 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Hospital Rd CSO, Pontnewynydd | Due 2029-30 | Upper Hospital Road Pontnewynydd Storm Overflow |
| DCWW101582a · 7bec84fb | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ HOSPITAL ROAD CSO ST JOHNS AMBULANCE | Due 2029-30 | Pontnewyndd Hospital Road Storm Overflow |
| DCWW101582a · a490a289 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Leigh Rd CSO, Pontypool | Due 2029-30 | Pontypool Leigh Road Storm Overflow |
| DCWW101582a · 2829f14f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanfrechra Rose Cottage CSO | Due 2029-30 | Tram Lane Storm Overflow |
| DCWW101582a · 18ac69a9 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ New Road CSO, Pontypool | Due 2029-30 | New Inn New Road Storm Overflow |
| DCWW100770a · 0821edc3 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ OLD FURNACE PUMPING STATION, PONTYPOOL, GWENT | Due 2029-30 | Water body only |
| DCWW101582a · 9540c57e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pleasant Court CSO, Limekiln Rd, Pontypool | Due 2029-30 | Pontypool Limekiln Road Storm Overflow |
| DCWW102232a · b97ec93d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTHIR INLET WORKS STORM TANKS ETC | Due 2029-30 | Llanfrechfa Storm Tanks Overflow |
| DCWW101582a · 5305e02b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pontnewynydd Mill Rd CSO | Due 2029-30 | Mill Road Pontnewynydd 1 Storm Overflow |
| DCWW101582a · 02134aed | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Pontnewynydd Mill Rd O/S No 4 CSO | Due 2029-30 | Mill Road Pontnewynydd 2 Storm Overflow |
| DCWW102354a · 3057d17e | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPOOL FREEHOLDLAND ROAD | Due 2029-30 | Freeholdland Road Storm Overflow |
| DCWW102259a · fecb1059 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPOOL HANBURY ROAD/ITALIAN GARDENS | Due 2029-30 | Pontypool Hanbury Road Storm Overflow |
| DCWW102228a · 6510378f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPOOL NEW INN POLO GROUNDS IND EST | Due 2029-30 | Polo Grounds Storm Overflow |
| DCWW102313a · 4417b6cd | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PONTYPOOL SNATCHWOOD ROAD | Due 2029-30 | Snatchwood Road Storm Overflow |
| DCWW101582a · ed3f0a30 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Porthmawr Road CSO, Cwmbran | Due 2029-30 | Cwmbran Woodside Road Storm Overflow |
| DCWW102366a · 18588c88 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rear of 15 Llwyn Onn CSO Croesyceiliog | Due 2029-30 | Llwyn Onn Storm Overflow |
| DCWW102367a · 7ed22608 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ REDE ROAD CSO REDE ROAD CWMBRAN | Due 2029-30 | Turners End Cwmbran Overflow |
| DCWW101582a · 193f2a6f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Rose Cottage CSO | Due 2029-30 | Cwmavon Road Cwmavon Storm Overflow |
| DCWW101939a · a4a5ef62 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ St Albans School CSO, Pontypool | Due 2029-30 | Pontypool Park West Storm Overflow |
| DCWW101925a · 45126ed1 | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ Trosnant Street Pontypool | Due 2029-30 | Trosnant Street Pontypool Storm Overflow |
| DCWW101582a · ff474586 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TY COCH CSO TY COCH WAY CWMBRAN , | Due 2029-30 | Ty Coch Way Storm Overflow |
| DCWW101582a · a46798c7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Usk Road Pumping Station | Due 2029-30 | Water body only |
| DCWW101582a · 0ed423f8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ VIADUCT ROAD CSO GARNIFFAITH ABERSY | Due 2029-30 | Viaduct Road Garndiffaith Storm Overflow |
| DCWW102227a · 745f3a94 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Woodland View CSO, Pontypool | Due 2029-30 | Woodland View Pontypool Storm Overflow |
48 of 48 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.