Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
The Storm Overflows Discharge Reduction Plan covers England only. The Aeron and Ceredigion coast is in Wales, which sets its own storm overflow targets. The figures below still show how often each overflow spills against its own baseline and against 10 spills a year, but that cap is England’s. Welsh annual returns start in 2022, so the baseline here is each overflow’s 2022 figure, not 2020.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the EDM record: each overflow's counted spills per year — the standard 12/24-hour block figure, the same basis the cap is written in — against its 2022 baseline (the first Welsh annual return) and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Pennant Wwtw Storm Overflow DCWW2026 | 2050 | 230 ·22 | 201 0 events | -13% | 20.1× | Falling — behind | |
| Mydroilyn Wwtw Storm Overflow DCWW1582 | 2050 | 0 ·22 | 122 0 events | — | 12.2× | Rising | |
| Llangeitho Wwtw Overflow DCWW1577 | 2050 | 0 ·22 | 116 0 events | — | 11.6× | Rising | |
| Nanternis Wwtw Overflow DCWW1683 | 2050 | 125 ·22 | 108 0 events | -14% | 10.8× | Falling — behind | |
| Llanarth Bridge Storm Overflow DCWW909 | 2050 | 40 ·22 | 95 0 events | +138% | 9.5× | Rising | |
| Llwyncelyn Wwtw Storm Overflow DCWW1195 | 2050 | 0 ·22 | 82 0 events | — | 8.2× | Rising | |
| Aberporth Wwtw Storm Overflow DCWW1920 | 2050 | 46 ·22 | 70 0 events | +52% | 7× | Rising | |
| Ystrad Aeron Storm Overflow DCWW1876 | 2050 | 30 ·22 | 60 0 events | +100% | 6× | Rising | |
| Llanina Point Storm Overflow DCWW1756 | 2050 | 11 ·22 | 58 0 events | +427% | 5.8× | Rising | |
| Harbour Lane Junction Storm Overflow DCWW305 | 2050 | 33 ·22 | 52 0 events | +58% | 5.2× | Rising | |
| Ffos-y-ffin Storm Overflow DCWW390 | 2050 | 18 ·22 | 40 0 events | +122% | 4× | Rising | |
| Peniel Lane Storm Overflow DCWW185 | 2050 | 41 ·22 | 32 0 events | -22% | 3.2× | Falling — behind | |
| Llanrhystud Wwtw Storm Overflow DCWW41 | 2050 | 15 ·22 | 30 0 events | +100% | 3× | Rising | |
| Mill View Llangranog Storm Overflow DCWW225 | 2050 | 4 ·22 | 29 0 events | +625% | 2.9× | Rising | |
| Aberarth Storm Overflow DCWW151 | 2050 | 14 ·22 | 15 0 events | +7% | 1.5× | Rising | |
| Waterloo Street Aberaeron Overflow DCWW1631 | 2050 | 13 ·22 | 9 0 events | -31% | 0.9× | Within the cap | |
| South John Street Storm Overflow DCWW166 | 2050 | 0 ·22 | 7 0 events | — | 0.7× | Within the cap | |
| Pendard Storm Overflow DCWW187 | 2050 | 0 ·22 | 3 1 events | — | 0.3× | Within the cap | |
| Spring Gardens New Quay Storm Overflow DCWW163 | 2050 | 0 ·22 | 2 0 events | — | 0.2× | Within the cap | |
| Aberporth No. 1 Storm Overflow DCWW145 | 2050 | 2 ·22 | 2 1 events | 0% | 0.2× | Within the cap | |
| Aberporth Headland Overflow DCWW146 | 2050 | 1 ·22 | 1 0 events | 0% | 0.1× | Within the cap | |
| Ceibach Storm Overflow DCWW95 | 2050 | 0 ·22 | 1 0 events | — | 0.1× | Within the cap | |
| Heol Y Farchnad Road Storm Overflow DCWW1248 | 2050 | 1 ·22 | 1 0 events | 0% | 0.1× | Within the cap | |
| Aberporth No. 2 Storm Overflow DCWW144 | 2050 | 2 ·22 | 1 0 events | -50% | 0.1× | Within the cap | |
| Nebo Wwtw Storm Overflow DCWW1738 | 2050 | 12 ·22 | 0 0 events | -100% | 0× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2022 baseline and the 10/year cap. Counted spills use the standard 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →