Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Lutton STWSSO SBB00724 | 2050 | 118 ·24 | 118 74 events | 0% | 11.8× | Falling — behind | |
| Lee Mill STW, PlymouthSO SBB00678 | 2050 | 96 | 116 187 events | +21% | 11.6× | Rising | |
| Lutton STWSO SBB00723 | 2050 | 110 ·24 | 106 263 events | -4% | 10.6× | Falling — behind | |
| Sparkwell STWSSO SBB01111 | 2050 | 22 | 79 31 events | +259% | 7.9× | Rising | |
| Bridgend pumping station, Newton FerrersPS-CSO/EO SBB00157 | 2050 | 22 | 53 77 events | +141% | 5.3× | Rising | |
| Lee Mill pumping station, PlymouthPS-CSO/EO SBB00677 | 2050 | 48 | 36 38 events | -25% | 3.6× | Falling — behind | |
| Cornwood pumping station, LuttonPS-CSO/EO SBB00308 | 2050 | 39 ·24 | 34 32 events | -13% | 3.4× | Falling — behind | |
| Brixton STWSSO SBB00162 | 2050 | 54 | 22 129 events | -59% | 2.2× | Falling — behind | |
| Torbridge South, YealmptonCSO SBB01254 | 2050 | 9 | 16 11 events | +78% | 1.6× | Rising | |
| Yealmpton STWSSO SBB01387 | 2050 | 15 | 14 11 events | -7% | 1.4× | Nearly there | |
| Tinwood, SparkwellCSO SBB01245 | 2050 | 9 | 14 25 events | +56% | 1.4× | Rising | |
| Winston Ln, BrixtonCSO SBB01372 | 2050 | 13 | 9 4 events | -31% | 0.9× | Within the cap | |
| Church Way, YealmptonCSO SBB00267 | 2050 | 1 | 8 1 events | +700% | 0.8× | Within the cap | |
| Yealmpton pumping stationPS-CSO/EO SBB01386 | 2050 | 26 | 4 3 events | -85% | 0.4× | Within the cap | |
| Courtwood pumping station, Newton FerrersPS-CSO/EO SBB00314 | 2050 | 1 | 4 4 events | +300% | 0.4× | Within the cap | |
| Riverside No. 1, Newton FerrersCSO SBB01029 | 2050 | 27 | 3 0 events | -89% | 0.3× | Within the cap | |
| Kiln Quay pumping station, Newton FerrersPS-CSO/EO SBB00632 | 2050 | 2 ·25 | 2 1 events | 0% | 0.2× | — | Within the cap |
| Torbridge North, YealmptonCSO SBB01253 | 2050 | 1 ·24 | 2 1 events | +100% | 0.2× | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →