← Waverley Lane (farnham) pumping station

Spill evidence · River Hub

Waverley Lane (farnham) pumping station

Pumping station overflow · TWL00434 · feeds FARNHAM, FARNHAM, SURREY STW"
Wet weather

The discharge

Spill day
Tuesday, 27 October 2026
Started
27 Oct 2026, 09:15
Ended
27 Oct 2026, 12:30
Duration
3 hours 15 minutes
Receiving water
North Wey (Alton to Tilford)
Parish
Farnham

Rainfall evidence

Daily rainfall at the matched gauge (Farnham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/10/2026 (spill day)0.11 mmdry
26/10/20265.47 mmrain
25/10/20260.96 mmrain
24/10/202618.57 mmrain
23/10/20263.13 mmrain

River flow that day: 5.242 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00434). Rainfall: EA Hydrology gauge 14306ece-d3e1-4c96-8532-076cfaf302ec. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Wey Data.