← Selborne STW

Spill evidence · River Hub

Selborne STW

Storm overflow at the works · TWL00361 · feeds SELBORNE STW
Wet weather

The discharge

Spill day
Thursday, 25 April 2024
Started
25 Apr 2024, 11:00
Ended
25 Apr 2024, 11:30
Duration
30 minutes
Receiving water
Oakhanger Stream
Parish
Selborne

Rainfall evidence

Daily rainfall at the matched gauge (East Worldham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/04/2024 (spill day)2.47 mmrain
24/04/20240 mmdry
23/04/20240 mmdry
22/04/20240.64 mmrain
21/04/20240 mmdry

River flow that day: 3.329 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
119 counted spills · 2366 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00361). Rainfall: EA Hydrology gauge b64e45f6-d58c-425f-be08-a04683b59ade. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Wey Data.
Spill evidence — Selborne STW — River Wey Data