← Cranleigh STW

Spill evidence · River Hub

Cranleigh STW

Storm overflow at the works · TWL00117 · feeds CRANLEIGH, CRANLEIGH, SURREY STW"
Dry spill

Evidence strength

High confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 99% operational that year

The discharge

Spill day
Tuesday, 24 December 2024
Started
24 Dec 2024, 20:15
Ended
31 Dec 2024, 17:15
Duration
6 days 21 hours
Receiving water
Cranleigh Waters
Parish
Cranleigh

Rainfall evidence

Daily rainfall at the matched gauge (Cranleigh) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/12/2024 (spill day)0 mmdry
23/12/20240.25 mmdry
22/12/20240.01 mmdry
21/12/20240.64 mmrain
20/12/20242.32 mmrain

River flow that day: 7.045 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
103 counted spills · 1565 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00117). Rainfall: EA Hydrology gauge f8093480-7cda-45e8-8e0a-7b1723b4f989. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Wey Data.
Spill evidence — Cranleigh STW — River Wey Data