← Cranleigh STW

Spill evidence · River Hub

Cranleigh STW

Storm overflow at the works · TWL00117 · feeds CRANLEIGH, CRANLEIGH, SURREY STW"
Dry spill

Evidence strength

High confidence
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 99% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Tuesday, 12 November 2024
Started
12 Nov 2024, 06:00
Ended
12 Nov 2024, 06:30
Duration
30 minutes
Receiving water
Cranleigh Waters
Parish
Cranleigh

Rainfall evidence

Daily rainfall at the matched gauge (Cranleigh) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
12/11/2024 (spill day)0.11 mmdry
11/11/20240.16 mmdry
10/11/20240.04 mmdry
09/11/20240 mmdry
08/11/20240 mmdry

River flow that day: 2.092 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
103 counted spills · 1565 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00117). Rainfall: EA Hydrology gauge f8093480-7cda-45e8-8e0a-7b1723b4f989. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Wey Data.