← Knowle Lane, Cranleigh
Spill evidence · River Hub
Knowle Lane, Cranleigh
Combined sewer overflow · TWL00132 · feeds CRANLEIGH, CRANLEIGH, SURREY STW"
Wet weather
The discharge
- Spill day
- Monday, 30 September 2024
- Started
- 30 Sept 2024, 02:30
- Ended
- 30 Sept 2024, 08:15
- Duration
- 5 hours 45 minutes
- Receiving water
- Cranleigh Waters
- Parish
- Cranleigh
Rainfall evidence
Daily rainfall at the matched gauge (Cranleigh) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 30/09/2024 (spill day) | 0.09 mm | dry |
| 29/09/2024 | 22.49 mm | rain |
| 28/09/2024 | 0.02 mm | dry |
| 27/09/2024 | 2.43 mm | rain |
| 26/09/2024 | 9.99 mm | rain |
River flow that day: 10.303 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 1.6 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2024)
- 22 counted spills · 99 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00132). Rainfall: EA Hydrology gauge f8093480-7cda-45e8-8e0a-7b1723b4f989. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Wey Data.