Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

18
Measures in this catchment
WINEP, current record
18
Still active
not yet past their date
0
Assumed complete
completion date has passed
2
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08WW100362 · aU_MON3Monitoring
MCERTS certified overflow operation monitor (U_MON3b)
Blue Anchor, Pill Bridge SPS Overflow Monitoring
Due 2026-27Pill
08WW100683 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Crowcombe WRC Flow Monitoring
Due 2026-27Doniford Stream
08WW100457 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Crowcombe WRC Overflow Monitoring
Due 2026-27Doniford Stream
08WW100758 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Minehead WRC Flow Monitoring
Due 2026-27Avill
08WW100530 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Minehead WRC Overflow Monitoring
Due 2026-27Avill
08WW100771 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Porlock WRC Flow Monitoring
Due 2026-27Hawcombe STR
08WW100544 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Porlock WRC Overflow Monitoring
Due 2026-27Hawcombe STR
08WW100040 · eWFD_NDINV_WRFlowInvestigation
Investigate implication of using licence that has not been used for at least 4 years.
Unused licence investigation - Broadwood Spring
Due 2026-27Avill
08WW101000 · faEnvAct_INV4Investigation
Storm overflows - Investigations
BICKNOLLER CSO SO Investigation (16888C)
Due 2027-28Doniford Stream
08WW101000 · afEnvAct_INV4Investigation
Storm overflows - Investigations
BILBROOK PUMPING STATION SO Investigation (15516B)
Due 2027-28Pill
08WW101000 · hwEnvAct_INV4Investigation
Storm overflows - Investigations
COMBINED SEWER OVERFLOW SO Investigation (17002C)
Due 2027-28Washford - Lower
08WW101000 · moEnvAct_INV4Investigation
Storm overflows - Investigations
CROWCOMBE WASTEWATER TREATMENT WORK
Due 2027-28Doniford Stream
08WW101000 · aaEnvAct_INV4Investigation
Storm overflows - Investigations
FARM CSO SO Investigation (16944C)
Due 2027-28Pill
08WW101000 · mdEnvAct_INV4Investigation
Storm overflows - Investigations
HAWKWELL COMBINED SEWER OVERFLOW
Due 2027-28Avill
08WW101000 · hsEnvAct_INV4Investigation
Storm overflows - Investigations
MILL STREET CSO SO Investigation (16886C)
Due 2027-28Washford - Lower
08WW101000 · beEnvAct_INV4Investigation
Storm overflows - Investigations
PORLOCK COMBINED SEWER OVERFLOW SO Investigation (16889C)
Due 2027-28Hawcombe STR
08WW101002 · dmEnvAct_IMP4Improvement
EnvAct_IMP4dm. Storm overflows - Frequency improvements
BICKNOLLER CSO SO improvement (16888C)
Due 2029-30Doniford Stream
08WW101002 · efEnvAct_IMP4Improvement
EnvAct_IMP4ef. Storm overflows - - Frequency improvements
BILBROOK PUMPING STATION SO improvement (15516B)
Due 2029-30Pill

18 of 18 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.