← Black Torrington STW

Spill evidence · River Hub

Black Torrington STW

Storm overflow at the works · SBB00117 · feeds BLACK TORRINGTON_STW_BLACK TORRINGTON
No rain data

The discharge

Spill day
Thursday, 31 December 2020
Started
31 Dec 2020, 10:30
Ended
31 Dec 2020, 23:45
Duration
13 hours 15 minutes
Receiving water
Torridge (Combe Lake to Lew)
Parish
Black Torrington

Rainfall evidence

Daily rainfall at the matched gauge (Allisland) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
31/12/2020 (spill day)no data
30/12/2020no data
29/12/2020no data
28/12/2020no data
27/12/2020no data

River flow that day: 11.739 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00117). Rainfall: EA Hydrology gauge 74b6bed8-b1d4-4e50-95da-206beee58f90. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.
Spill evidence — Black Torrington STW — River Torridge Data