← Buckleigh pumping station, Northam
Spill evidence · River Hub
Buckleigh pumping station, Northam
Pumping station overflow · SBB00184 · feeds BIDEFORD/NORTHAM STW
No rain data
The discharge
- Spill day
- Wednesday, 28 October 2020
- Started
- 28 Oct 2020, 14:14
- Ended
- 28 Oct 2020, 14:44
- Duration
- 29 minutes 50 seconds
- Receiving water
- Kenwith Stream
- Parish
- Northam
Rainfall evidence
Daily rainfall at the matched gauge (Kenwith Castle) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 28/10/2020 (spill day) | no data | |
| 27/10/2020 | no data | |
| 26/10/2020 | no data | |
| 25/10/2020 | no data | |
| 24/10/2020 | no data |
River flow that day: 4.848 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 1.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Taw-Torridge Estuary
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00184). Rainfall: EA Hydrology gauge c21f6669-06ec-44b9-864e-ff939c22aaa2_390523. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Torridge Data.