What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08TW100545 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) AMPNEY ST PETER STW | Complete 2025-26 | Ampney St Peter STW |
| 08TW100546 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) ANDOVERSFORD STW | Complete 2025-26 | Andoversford STW |
| 08TW100693 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) ASCOT STW | Complete 2025-26 | Ascot STW |
| 08TW100717 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BEENHAM STW | Complete 2025-26 | Beenham STW |
| 08TW100555 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BENSON STW | Complete 2025-26 | Benson STW |
| 08TW100560 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BLUNSDON STW | Complete 2025-26 | Blunsdon STW |
| 08TW100563 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BOURTON-ON-THE-WATER (Last in Line Overflow off site)STW | Complete 2025-26 | Cole (Acorn Bridge to Bower Bridge) |
| 08TW100564 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BRACKNELL STW | Complete 2025-26 | Bracknell STW |
| 08TW100566 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BUCKLEBURY UPPER COMMON STW | Complete 2025-26 | Pang |
| 08TW100700 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHAPEL ROW SEWAGE TREATMENT WORKS | Complete 2025-26 | Pang |
| 08TW100580 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHOLSEY STW | Complete 2025-26 | Cholsey STW |
| 08TW100582 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CIRENCESTER STW | Complete 2025-26 | Cirencester STW |
| 08TW100585 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) COMPTON SEWAGE TREATMENT WORKS | Complete 2025-26 | Pang |
| 08TW100705 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CRICKLADE STW | Complete 2025-26 | Cricklade STW |
| 08TW100601 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) FAIRFORD STW | Complete 2025-26 | Fairford STW |
| 08TW100610 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) GORING STW | Complete 2025-26 | Goring STW |
| 08TW100616 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HAMBLEDEN SEWAGE TREATMENT WORKS | Complete 2025-26 | Thames (Reading to Cookham) |
| 08TW100617 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HAMPSTEAD NORREYS STW | Complete 2025-26 | Hampstead Norreys STW |
| 08TW100622 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HENLEY STW | Complete 2025-26 | Henley STW |
| 08TW100624 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HIGHWORTH STW | Complete 2025-26 | Highworth STW |
| 08TW100630 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) KEMPSFORD STW | Complete 2025-26 | Kempsford STW |
| 08TW100637 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) LITTLE MARLOW STW ( WOOBURNVALLEY ) | Complete 2025-26 | Thames (Reading to Cookham) |
| 08TW100640 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MAIDENHEAD STW | Complete 2025-26 | Maidenhead STW |
| 08TW100650 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) PANGBOURNE STW | Complete 2025-26 | Pangbourne STW |
| 08TW100652 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) PURTON STW | Complete 2025-26 | Purton STW |
| 08TW100660 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SHRIVENHAM STW | Complete 2025-26 | Shrivenham STW |
| 08TW100662 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SLOUGH SEWAGE TREATMENT WORKS | Complete 2025-26 | Roundmoor Ditch and Boveney Ditch |
| 08TW100663 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SONNING COMMON STW | Complete 2025-26 | Sonning Common STW |
| 08TW100665 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SOUTH MORETON STW | Complete 2025-26 | South Moreton STW |
| 08TW100671 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SWINDON STW | Complete 2025-26 | Swindon STW |
| 08TW100676 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WANBOROUGH STW | Complete 2025-26 | Wanborough STW |
| 08TW100685 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WHITE WALTHAM STW | Complete 2025-26 | White Waltham STW |
| 08TW100686 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WINDSOR STW | Complete 2025-26 | Windsor STW |
| 08TW101402 · a | WFDGW_ND | No deterioration | Necessary scope to move from groundwater authorisation to EPR GW authorisation to EPR: Basildon Park STW | Complete 2025-26 | Thames Wallingford to Caversham |
| 08TW101402 · c | WFDGW_ND | No deterioration | Necessary scope to move from groundwater authorisation to EPR GW authorisation to EPR: Hannington (Wilts) STW | Complete 2025-26 | Bydemill Brook (Source to Thames) |
| 08TW100219 | WFD_ND | No deterioration | No det scheme Hampstead Norreys No det P scheme, 2.9mg/l | Complete 2025-26 | Pang |
| 08TW101384 · a | WFD_ND | No deterioration | mg/l BOD permit at Bracknell STW Reduce BOD loading | Complete 2025-26 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100946 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Wash Water STW Reduce Phosphorus Loadings at Wash Water STW | Complete 2025-26 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100284 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) AMPNEY ST PETER STW | Due 2026-27 | Ampney St Peter STW |
| 08TW100413 · a | U_MON4 | Monitoring | Install and run event-duration monitoring ANDOVERSFORD STW | Due 2026-27 | Andoversford STW |
| 08TW100286 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) ASCOT STW | Due 2026-27 | Ascot STW |
| 08TW101572 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BEENHAM STW | Due 2026-27 | Beenham STW |
| 08TW100417 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BENSON STW | Due 2026-27 | Benson STW |
| 08TW100039 · a | WFD_INV_WRFlow | Investigation | Detailed soure-pathway-receptor investigation Bibury Source investigation | Due 2026-27 | Coln (from Coln Rogers) and Thames (Coln to Leach) |
| 08TW101405 · i | EDWRMP_INV | Investigation | Large catchment investigation Bishops Green, East Woodhay, Ufton Nervet – Environmental Destination | Due 2026-27 | Pang |
| 08TW100421 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BLUNSDON STW | Due 2026-27 | Blunsdon STW |
| 08TW100296 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) BOURTON-ON-THE-WATER STW (Last in Line Overflow off site) | Due 2026-27 | Cole (Acorn Bridge to Bower Bridge) |
| 08TW101577 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BRACKNELL STW | Due 2026-27 | Bracknell STW |
| 08TW100300 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BUCKLEBURY UPPER COMMON STW | Due 2026-27 | Pang |
| 08TW100309 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) CHAPEL ROW SEWAGE TREATMENT WORKS | Due 2026-27 | Pang |
| 08TW100314 · a | U_MON4 | Monitoring | Install and run event-duration monitoring CHOLSEY STW | Due 2026-27 | Cholsey STW |
| 08TW100316 · a | U_MON4 | Monitoring | Install and run event-duration monitoring CIRENCESTER STW | Due 2026-27 | Cirencester STW |
| 08TW100318 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) COMPTON SEWAGE TREATMENT WORKS | Due 2026-27 | Pang |
| 08TW100321 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) CRICKLADE STW | Due 2026-27 | Cricklade STW |
| 08TW100432 · a | U_MON4 | Monitoring | Install and run event-duration monitoring FAIRFORD STW | Due 2026-27 | Fairford STW |
| 08TW100435 · a | U_MON4 | Monitoring | Install and run event-duration monitoring GORING STW | Due 2026-27 | Goring STW |
| 08TW100339 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) HAMBLEDEN SEWAGE TREATMENT WORKS | Due 2026-27 | Thames (Reading to Cookham) |
| 08TW100341 · a | U_MON4 | Monitoring | Install and run event-duration monitoring HAMPSTEAD NORREYS STW | Due 2026-27 | Hampstead Norreys STW |
| 08TW100436 · a | U_MON4 | Monitoring | Install and run event-duration monitoring HENLEY STW | Due 2026-27 | Henley STW |
| 08TW100438 · a | U_MON4 | Monitoring | Install and run event-duration monitoring HIGHWORTH STW | Due 2026-27 | Highworth STW |
| 08TW100440 · a | U_MON4 | Monitoring | Install and run event-duration monitoring KEMPSFORD STW | Due 2026-27 | Kempsford STW |
| 08TW100040 · a | WFD_INV_WRFlow | Investigation | Further phase of investigation Latton and Meysey Hampton Source investigation | Due 2026-27 | Churn (Baunton to Cricklade) |
| 08TW101597 · a | U_MON4 | Monitoring | Install and run event-duration monitoring LITTLE MARLOW STW ( WOOBURNVALLEY ) | Due 2026-27 | Thames (Reading to Cookham) |
| 08TW100443 · a | U_MON4 | Monitoring | Install and run event-duration monitoring MAIDENHEAD STW | Due 2026-27 | Maidenhead STW |
| 08TW101405 · l | EDWRMP_INV | Investigation | Large catchment investigation Pang baseline monitoring and benefits assessment | Due 2026-27 | Pang |
| 08TW100037 · a | WFD_INV_WRFlow | Investigation | Further phase of investigation Pangbourne Source investigation | Due 2026-27 | Pang |
| 08TW100446 · a | U_MON4 | Monitoring | Install and run event-duration monitoring PANGBOURNE STW | Due 2026-27 | Pangbourne STW |
| 08TW100035 · a | WFD_INV_WRFlow | Investigation | Further phase of investigation Pann Mill and Radnage Sources investigation | Due 2026-27 | Wye (Source to High Wycombe fire station) |
| 08TW100373 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) PURTON STW | Due 2026-27 | Purton STW |
| 08TW100381 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) SHRIVENHAM STW | Due 2026-27 | Shrivenham STW |
| 08TW100382 · a | U_MON4 | Monitoring | Install and run event-duration monitoring SLOUGH SEWAGE TREATMENT WORKS | Due 2026-27 | Roundmoor Ditch and Boveney Ditch |
| 08TW100383 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) SONNING COMMON STW | Due 2026-27 | Sonning Common STW |
| 08TW100384 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) SOUTH MORETON STW | Due 2026-27 | South Moreton STW |
| 08TW100390 · a | U_MON4 | Monitoring | Install and run event-duration monitoring SWINDON STW | Due 2026-27 | Swindon STW |
| 08TW101405 · c | EDWRMP_INV | Investigation | Large catchment investigation Syreford - Environmental Destination | Due 2026-27 | Coln (Source to Coln Rogers) |
| 08TW104009 · a | WFD_NDINV_WRFlow | Investigation | Investigate implication of using licence that has not been used for at least 4 years. Unused licence investigation | Due 2026-27 | Coln (Source to Coln Rogers) |
| 08TW104004 · a | WFD_NDINV_WRFlow | Investigation | Investigate implication of licence growth W licence growth investigation | Due 2026-27 | Thames Wallingford to Caversham |
| 08TW100396 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WANBOROUGH STW | Due 2026-27 | Wanborough STW |
| 08TW100403 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WHITE WALTHAM STW | Due 2026-27 | White Waltham STW |
| 08TW101614 · a | U_MON4 | Monitoring | Install and run event-duration monitoring WINDSOR STW | Due 2026-27 | Windsor STW |
| 08TW100467 · a | WFD_NDLS_Chem1 | No deterioration | Ascot STW cypermethrin load standstill limit Ascot STW | Due 2026-27 | Ascot STW |
| 08TW101449 · a | WFD_NDLS_Chem1 | No deterioration | Bracknell STW cypermethrin load standstill limit Bracknell STW - Reduce Cypermethrin loading | Due 2026-27 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100482 · a | WFD_NDLS_Chem1 | No deterioration | Highworth STW nonylphenol load standstill limit Highworth STW | Due 2026-27 | Highworth STW |
| 08TW100125 · a | WFD_NDLS_Chem2 | No deterioration | Maidenhead STW, Nonylphenol, 0.58 ug Reduce Nonylphenol loading | Due 2026-27 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100113 · a | WFD_NDLS_Chem2 | No deterioration | Bracknell STW, Nonylphenol, 0.94 ug Reduce Nonylphenol loading | Due 2026-27 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100118 · a | WFD_NDLS_Chem2 | No deterioration | Cirencester STW, Nonylphenol, 0.52 ug Reduce Nonylphenol loading | Due 2026-27 | Cerney Wick Brook (source to Thames) |
| 08TW100134 · a | WFD_NDLS_Chem2 | No deterioration | Slough STW, Nonylphenol, 0.37 ug Reduce Nonylphenol loading | Due 2026-27 | Thames (Cookham to Egham) |
| 08TW100137 · a | WFD_NDLS_Chem2 | No deterioration | White Waltham STW, Nonylphenol, 0.8 ug Reduce Nonylphenol loading | Due 2026-27 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100492 · a | WFD_NDLS_Chem1 | No deterioration | White Waltham cypermethrin load standstill limit White Waltham STW | Due 2026-27 | White Waltham STW |
| 08TW100205 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation Bradfield College Sluice Fish Pass | Due 2027-28 | Pang |
| 08TW101108 · td | EnvAct_INV4 | Investigation | Storm Overflows investigation CHAPEL ROW (BERKS) WWTW- Storm Overflows investigation | Due 2027-28 | Pang |
| 08TW101108 · uq | EnvAct_INV4 | Investigation | Storm Overflows investigation Chisledon storm tanks - Storm Overflows investigation at Chisledon storm tanks | Due 2027-28 | Cole (source to Lenta Brook) |
| 08TW101108 · tz | EnvAct_INV4 | Investigation | Storm Overflows investigation Draycott Foliat- Storm Overflows investigation | Due 2027-28 | Ray (Wiltshire) source to Lydiard Brook |
| 08TW101403 · b | WFD_INV_N-Tal | Investigation | N-TAL trials at Highworth STW Highworth STW | Due 2027-28 | Highworth STW |
| 08TW100210 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation Pang (Moor Copse) River Restoration Scheme | Due 2027-28 | Pang |
| 08TW101108 · tk | EnvAct_INV4 | Investigation | Storm Overflows investigation PANGBOURNE WWTW- Storm Overflows investigation | Due 2027-28 | Sulham Brook |
| 08TW100207 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation River Churn (South Cerney) River Restoration Scheme | Due 2027-28 | Churn (Baunton to Cricklade) |
| 08TW100209 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation River Churn (U/s Cirencester) River Restoration Scheme | Due 2027-28 | Churn (Baunton to Cricklade) |
| 08TW100208 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation River Coln (Fairford) River Restoration Scheme | Due 2027-28 | Coln (from Coln Rogers) and Thames (Coln to Leach) |
| 08WW101000 · nv | EnvAct_INV4 | Investigation | Storm overflows - Investigations STATION ROAD SEWAGE PUMPING STATION | Due 2027-28 | Derry Brook |
| 08TW101108 · ac | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at ANDOVERSFORD STW | Due 2027-28 | Coln (Source to Coln Rogers) |
| 08TW101108 · nm | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at Bracknell STW | Due 2027-28 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW101108 · ar | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at CIRENCESTER STW | Due 2027-28 | Cerney Wick Brook (source to Thames) |
| 08TW101108 · gh | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HAMBLEDEN STW | Due 2027-28 | Thames (Reading to Cookham) |
| 08TW101108 · bk | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HAMPSTEAD NORREYS STW | Due 2027-28 | Pang |
| 08TW101108 · eg | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at KINGSTON MAIN SPS | Due 2027-28 | Thames (Egham to Teddington) |
| 08TW101108 · bw | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at LITTLE MARLOW STW | Due 2027-28 | Thames (Reading to Cookham) |
| 08TW101108 · ek | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at PORTSMOUTH ROAD, UXBRIDGE ROAD CSO | Due 2027-28 | Thames (Egham to Teddington) |
| 08TW101108 · gw | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at SEVENHAMPTON VILLAGE STW | Due 2027-28 | Cole (Acorn Bridge to Bower Bridge) |
| 08TW101108 · ch | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at SLOUGH STW | Due 2027-28 | Roundmoor Ditch and Boveney Ditch |
| 08TW101108 · ci | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WINDSOR STW | Due 2027-28 | Thames (Cookham to Egham) |
| 08TW100212 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation Tidmarsh Mill Fish Pass | Due 2027-28 | Pang |
| 08TW100206 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation Unknown obstruction - Everington Fish Pass | Due 2027-28 | Pang |
| 08TW100264 · a | BW_INV2 | Investigation | Investigation of assets discharging into designated bathing water Wallingford Beach Bathing Water Investigaiton | Due 2027-28 | Thames Wallingford to Caversham |
| 08TW100189 · a | WFD_INV | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Key (Source to Thames) |
| 08TW100183 · a | WFD_INV | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Cholsey Brook and tributaries |
| 08TW100197 · a | WFD_INV | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Bydemill Brook (Source to Thames) |
| 08TW100198 · a | WFD_INV | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Chalvey Ditches |
| 08TW100214 · a | WFD_INV_PHYSHAB | Investigation | Undertake detailed feasibilty and design prior to AMP9 implementation Whelford Mill Fish Pass | Due 2027-28 | Coln (from Coln Rogers) and Thames (Coln to Leach) |
| 08TW100263 · a | BW_IMP2 | Improvement | Improvement of assets discharging into designated bathing water Wallingford Beach Bathing Water Improvement | Due 2028-29 | Thames Wallingford to Caversham |
| 08TW100052 · e | WFD_INV_CHEM | Investigation | Swindon STW 4e Emerging substances investigation – impact to the environment | Due 2029-30 | Ray (Wiltshire) source to Lydiard Brook |
| 11TW100007 · a | EnvAct_IMP3 | Improvement | Improvement of assets discharging into designated bathing water Benson STW Storm Overflow improvement - Wallingford Beach Bathing Water | Due 2029-30 | Thames Wallingford to Caversham |
| 08TW100012 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Bradfield Sports Centre Weir Fish Pass | Due 2029-30 | Pang |
| 08TW100010 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Bradfield Weed Rack Fish Pass | Due 2029-30 | Pang |
| 08TW100003 · a | WFD_ND_WRFlow | No deterioration | Engineering solutions to enable reduction Bradfield WTW sustainability reduction | Due 2029-30 | Pang |
| 08TW104006 · a | WFD_IMP_PHYSHAB | Improvement | Implement a river restorations schmeme to promote natural morphological processes Chiltern Chalk Scarp habitat improvement measures | Due 2029-30 | Ewelme Stream (Source to Thames) |
| 08TW100026 · a | WFD_IMP_WRHMWB | Improvement | Implement a river restorations schmeme to promote natural morphological processes Datchet Common Brook River Restoration Scheme | Due 2029-30 | Datchet Common Brook |
| 08TW100011 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Englefield Estate Weir Fish Pass | Due 2029-30 | Pang |
| 08TW100024 · a | WFD_IMP_PHYSHAB | Improvement | Implement a river restorations schmeme to promote natural morphological processes Pang (Englefield Estate) River Restoration Scheme | Due 2029-30 | Pang |
| 08TW100023 · a | WFD_IMP_PHYSHAB | Improvement | Implement a river restorations schmeme to promote natural morphological processes Pang (wetland at Hampstead Norreys) River Restoration Scheme | Due 2029-30 | Pang |
| 08TW100014 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Pang at Bucklebury Fish Pass | Due 2029-30 | Pang |
| 08TW100176 · a | WFD_IMPm | Improvement | Pangbourne STW Outfall Relocation Reduce BOD loading | Due 2029-30 | Sulham Brook |
| 08TW100469 · a | WFD_ND_CHEM3 | No deterioration | Bracknell STW cypermethrin load standstill limit Reduce cypermethrin loading | Due 2029-30 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100865 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Ascot STW Reduce Phosphorus Loadings at Ascot STW | Due 2029-30 | Bull Brook |
| 08TW100878 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Bracknell STW Reduce Phosphorus Loadings at Bracknell STW | Due 2029-30 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100890 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Cirencester STW Reduce Phosphorus Loadings at Cirencester STW | Due 2029-30 | Cerney Wick Brook (source to Thames) |
| 08TW100908 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Henley STW Reduce Phosphorus Loadings at Henley STW | Due 2029-30 | Thames (Reading to Cookham) |
| 08TW101485 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at High Wycombe STW also known as High Wycombe Transfer Reduce Phosphorus Loadings at High Wycombe STW | Due 2029-30 | Wye (High Wycombe fire station to Thames) |
| 08TW100909 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Highworth STW Reduce Phosphorus Loadings at Highworth STW | Due 2029-30 | Westrop Brook |
| 09TW100040 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Little Marlow STW Reduce Phosphorus Loadings at Little Marlow STW | Due 2029-30 | Thames (Reading to Cookham) |
| 08TW100921 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Maidenhead STW Reduce Phosphorus Loadings at Maidenhead STW | Due 2029-30 | Cut (Binfield to River Thames confluence) and Maidenhead Ditch |
| 08TW100932 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Sherborne St John STW Reduce Phosphorus Loadings at Sherborne St John STW | Due 2029-30 | Tuckmill Brook and tributaries |
| 08TW100934 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Silchester STW Reduce Phosphorus Loadings at Silchester STW | Due 2029-30 | Thames (Cookham to Egham) |
| 08TW100935 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Slough STW Reduce Phosphorus Loadings at Slough STW | Due 2029-30 | Roundmoor Ditch and Boveney Ditch |
| 08TW100939 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Swindon STW Reduce Phosphorus Loadings at Swindon STW | Due 2029-30 | Ray (Wiltshire) source to Lydiard Brook |
| 08TW100015 · a | WFD_IMP_PHYSHAB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Stanford Dingley Mill Fish Pass | Due 2029-30 | Pang |
| 08TW100978 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 1,044m of sewer relining, 66m3 storage, 0.43Ha SUDS IA Removal, 20m3 screen Storm Overflows action at ANDOVERSFORD STW | Due 2029-30 | Coln (Source to Coln Rogers) |
| 08TW100980 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 159m3 storage, 0.79Ha SUDS IA Removal, No screen required Storm Overflows action at Briff Lane (Bucklebury) STW | Due 2029-30 | Pang |
| 08TW100991 · a | EnvAct_IMP2 | Improvement | Option C1: Solution in AMP 08: 467m of sewer relining, 57m3 storage, 0.19Ha SUDS IA Removal, No screen required Storm Overflows action at CHAPEL ROW (Berks) STW | Due 2029-30 | Pang |
| 08TW100998 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 314m3 storage, 3.11Ha SUDS IA Removal, 20m3 screen Storm Overflows action at Compton (Berks) STW | Due 2029-30 | Pang |
| 08TW101084 · a | ENVAct_IMP2 | Improvement | Option C2: 566m2 wetland equivalent treatment, . and 20m3 screen Storm Overflows action at HAMBLEDEN STW | Due 2029-30 | Thames (Reading to Cookham) |
| 08TW101012 · a | ENVAct_IMP2 | Improvement | Option C2: 603m2 wetland equivalent treatment, 0.85 Ha SUDS IA Removal, 33m3 storage - No screen required Storm Overflows action at HAMPSTEAD NORREYS STW | Due 2029-30 | Pang |
| 08TW101090 · a | ENVAct_IMP2 | Improvement | Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, No screen required Storm Overflows action at SEVENHAMPTON VILLAGE STW | Due 2029-30 | Cole (Acorn Bridge to Bower Bridge) |
153 of 153 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.