Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

153
Measures in this catchment
WINEP, current record
115
Still active
not yet past their date
38
Assumed complete
completion date has passed
32
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08TW100545 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
AMPNEY ST PETER STW
Complete 2025-26Ampney St Peter STW
08TW100546 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
ANDOVERSFORD STW
Complete 2025-26Andoversford STW
08TW100693 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
ASCOT STW
Complete 2025-26Ascot STW
08TW100717 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BEENHAM STW
Complete 2025-26Beenham STW
08TW100555 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BENSON STW
Complete 2025-26Benson STW
08TW100560 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BLUNSDON STW
Complete 2025-26Blunsdon STW
08TW100563 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BOURTON-ON-THE-WATER (Last in Line Overflow off site)STW
Complete 2025-26Cole (Acorn Bridge to Bower Bridge)
08TW100564 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BRACKNELL STW
Complete 2025-26Bracknell STW
08TW100566 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BUCKLEBURY UPPER COMMON STW
Complete 2025-26Pang
08TW100700 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHAPEL ROW SEWAGE TREATMENT WORKS
Complete 2025-26Pang
08TW100580 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHOLSEY STW
Complete 2025-26Cholsey STW
08TW100582 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CIRENCESTER STW
Complete 2025-26Cirencester STW
08TW100585 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
COMPTON SEWAGE TREATMENT WORKS
Complete 2025-26Pang
08TW100705 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CRICKLADE STW
Complete 2025-26Cricklade STW
08TW100601 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
FAIRFORD STW
Complete 2025-26Fairford STW
08TW100610 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
GORING STW
Complete 2025-26Goring STW
08TW100616 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HAMBLEDEN SEWAGE TREATMENT WORKS
Complete 2025-26Thames (Reading to Cookham)
08TW100617 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HAMPSTEAD NORREYS STW
Complete 2025-26Hampstead Norreys STW
08TW100622 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HENLEY STW
Complete 2025-26Henley STW
08TW100624 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HIGHWORTH STW
Complete 2025-26Highworth STW
08TW100630 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
KEMPSFORD STW
Complete 2025-26Kempsford STW
08TW100637 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LITTLE MARLOW STW ( WOOBURNVALLEY )
Complete 2025-26Thames (Reading to Cookham)
08TW100640 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
MAIDENHEAD STW
Complete 2025-26Maidenhead STW
08TW100650 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
PANGBOURNE STW
Complete 2025-26Pangbourne STW
08TW100652 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
PURTON STW
Complete 2025-26Purton STW
08TW100660 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SHRIVENHAM STW
Complete 2025-26Shrivenham STW
08TW100662 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SLOUGH SEWAGE TREATMENT WORKS
Complete 2025-26Roundmoor Ditch and Boveney Ditch
08TW100663 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SONNING COMMON STW
Complete 2025-26Sonning Common STW
08TW100665 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SOUTH MORETON STW
Complete 2025-26South Moreton STW
08TW100671 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
SWINDON STW
Complete 2025-26Swindon STW
08TW100676 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WANBOROUGH STW
Complete 2025-26Wanborough STW
08TW100685 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WHITE WALTHAM STW
Complete 2025-26White Waltham STW
08TW100686 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
WINDSOR STW
Complete 2025-26Windsor STW
08TW101402 · aWFDGW_NDNo deterioration
Necessary scope to move from groundwater authorisation to EPR
GW authorisation to EPR: Basildon Park STW
Complete 2025-26Thames Wallingford to Caversham
08TW101402 · cWFDGW_NDNo deterioration
Necessary scope to move from groundwater authorisation to EPR
GW authorisation to EPR: Hannington (Wilts) STW
Complete 2025-26Bydemill Brook (Source to Thames)
08TW100219WFD_NDNo deterioration
No det scheme
Hampstead Norreys No det P scheme, 2.9mg/l
Complete 2025-26Pang
08TW101384 · aWFD_NDNo deterioration
mg/l BOD permit at Bracknell STW
Reduce BOD loading
Complete 2025-26Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100946 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Wash Water STW
Reduce Phosphorus Loadings at Wash Water STW
Complete 2025-26Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100284 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
AMPNEY ST PETER STW
Due 2026-27Ampney St Peter STW
08TW100413 · aU_MON4Monitoring
Install and run event-duration monitoring
ANDOVERSFORD STW
Due 2026-27Andoversford STW
08TW100286 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
ASCOT STW
Due 2026-27Ascot STW
08TW101572 · aU_MON4Monitoring
Install and run event-duration monitoring
BEENHAM STW
Due 2026-27Beenham STW
08TW100417 · aU_MON4Monitoring
Install and run event-duration monitoring
BENSON STW
Due 2026-27Benson STW
08TW100039 · aWFD_INV_WRFlowInvestigation
Detailed soure-pathway-receptor investigation
Bibury Source investigation
Due 2026-27Coln (from Coln Rogers) and Thames (Coln to Leach)
08TW101405 · iEDWRMP_INVInvestigation
Large catchment investigation
Bishops Green, East Woodhay, Ufton Nervet – Environmental Destination
Due 2026-27Pang
08TW100421 · aU_MON4Monitoring
Install and run event-duration monitoring
BLUNSDON STW
Due 2026-27Blunsdon STW
08TW100296 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
BOURTON-ON-THE-WATER STW (Last in Line Overflow off site)
Due 2026-27Cole (Acorn Bridge to Bower Bridge)
08TW101577 · aU_MON4Monitoring
Install and run event-duration monitoring
BRACKNELL STW
Due 2026-27Bracknell STW
08TW100300 · aU_MON4Monitoring
Install and run event-duration monitoring
BUCKLEBURY UPPER COMMON STW
Due 2026-27Pang
08TW100309 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
CHAPEL ROW SEWAGE TREATMENT WORKS
Due 2026-27Pang
08TW100314 · aU_MON4Monitoring
Install and run event-duration monitoring
CHOLSEY STW
Due 2026-27Cholsey STW
08TW100316 · aU_MON4Monitoring
Install and run event-duration monitoring
CIRENCESTER STW
Due 2026-27Cirencester STW
08TW100318 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
COMPTON SEWAGE TREATMENT WORKS
Due 2026-27Pang
08TW100321 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
CRICKLADE STW
Due 2026-27Cricklade STW
08TW100432 · aU_MON4Monitoring
Install and run event-duration monitoring
FAIRFORD STW
Due 2026-27Fairford STW
08TW100435 · aU_MON4Monitoring
Install and run event-duration monitoring
GORING STW
Due 2026-27Goring STW
08TW100339 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
HAMBLEDEN SEWAGE TREATMENT WORKS
Due 2026-27Thames (Reading to Cookham)
08TW100341 · aU_MON4Monitoring
Install and run event-duration monitoring
HAMPSTEAD NORREYS STW
Due 2026-27Hampstead Norreys STW
08TW100436 · aU_MON4Monitoring
Install and run event-duration monitoring
HENLEY STW
Due 2026-27Henley STW
08TW100438 · aU_MON4Monitoring
Install and run event-duration monitoring
HIGHWORTH STW
Due 2026-27Highworth STW
08TW100440 · aU_MON4Monitoring
Install and run event-duration monitoring
KEMPSFORD STW
Due 2026-27Kempsford STW
08TW100040 · aWFD_INV_WRFlowInvestigation
Further phase of investigation
Latton and Meysey Hampton Source investigation
Due 2026-27Churn (Baunton to Cricklade)
08TW101597 · aU_MON4Monitoring
Install and run event-duration monitoring
LITTLE MARLOW STW ( WOOBURNVALLEY )
Due 2026-27Thames (Reading to Cookham)
08TW100443 · aU_MON4Monitoring
Install and run event-duration monitoring
MAIDENHEAD STW
Due 2026-27Maidenhead STW
08TW101405 · lEDWRMP_INVInvestigation
Large catchment investigation
Pang baseline monitoring and benefits assessment
Due 2026-27Pang
08TW100037 · aWFD_INV_WRFlowInvestigation
Further phase of investigation
Pangbourne Source investigation
Due 2026-27Pang
08TW100446 · aU_MON4Monitoring
Install and run event-duration monitoring
PANGBOURNE STW
Due 2026-27Pangbourne STW
08TW100035 · aWFD_INV_WRFlowInvestigation
Further phase of investigation
Pann Mill and Radnage Sources investigation
Due 2026-27Wye (Source to High Wycombe fire station)
08TW100373 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
PURTON STW
Due 2026-27Purton STW
08TW100381 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
SHRIVENHAM STW
Due 2026-27Shrivenham STW
08TW100382 · aU_MON4Monitoring
Install and run event-duration monitoring
SLOUGH SEWAGE TREATMENT WORKS
Due 2026-27Roundmoor Ditch and Boveney Ditch
08TW100383 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
SONNING COMMON STW
Due 2026-27Sonning Common STW
08TW100384 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
SOUTH MORETON STW
Due 2026-27South Moreton STW
08TW100390 · aU_MON4Monitoring
Install and run event-duration monitoring
SWINDON STW
Due 2026-27Swindon STW
08TW101405 · cEDWRMP_INVInvestigation
Large catchment investigation
Syreford - Environmental Destination
Due 2026-27Coln (Source to Coln Rogers)
08TW104009 · aWFD_NDINV_WRFlowInvestigation
Investigate implication of using licence that has not been used for at least 4 years.
Unused licence investigation
Due 2026-27Coln (Source to Coln Rogers)
08TW104004 · aWFD_NDINV_WRFlowInvestigation
Investigate implication of licence growth
W licence growth investigation
Due 2026-27Thames Wallingford to Caversham
08TW100396 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
WANBOROUGH STW
Due 2026-27Wanborough STW
08TW100403 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
WHITE WALTHAM STW
Due 2026-27White Waltham STW
08TW101614 · aU_MON4Monitoring
Install and run event-duration monitoring
WINDSOR STW
Due 2026-27Windsor STW
08TW100467 · aWFD_NDLS_Chem1No deterioration
Ascot STW cypermethrin load standstill limit
Ascot STW
Due 2026-27Ascot STW
08TW101449 · aWFD_NDLS_Chem1No deterioration
Bracknell STW cypermethrin load standstill limit
Bracknell STW - Reduce Cypermethrin loading
Due 2026-27Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100482 · aWFD_NDLS_Chem1No deterioration
Highworth STW nonylphenol load standstill limit
Highworth STW
Due 2026-27Highworth STW
08TW100125 · aWFD_NDLS_Chem2No deterioration
Maidenhead STW, Nonylphenol, 0.58 ug
Reduce Nonylphenol loading
Due 2026-27Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100113 · aWFD_NDLS_Chem2No deterioration
Bracknell STW, Nonylphenol, 0.94 ug
Reduce Nonylphenol loading
Due 2026-27Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100118 · aWFD_NDLS_Chem2No deterioration
Cirencester STW, Nonylphenol, 0.52 ug
Reduce Nonylphenol loading
Due 2026-27Cerney Wick Brook (source to Thames)
08TW100134 · aWFD_NDLS_Chem2No deterioration
Slough STW, Nonylphenol, 0.37 ug
Reduce Nonylphenol loading
Due 2026-27Thames (Cookham to Egham)
08TW100137 · aWFD_NDLS_Chem2No deterioration
White Waltham STW, Nonylphenol, 0.8 ug
Reduce Nonylphenol loading
Due 2026-27Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100492 · aWFD_NDLS_Chem1No deterioration
White Waltham cypermethrin load standstill limit
White Waltham STW
Due 2026-27White Waltham STW
08TW100205 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
Bradfield College Sluice Fish Pass
Due 2027-28Pang
08TW101108 · tdEnvAct_INV4Investigation
Storm Overflows investigation
CHAPEL ROW (BERKS) WWTW- Storm Overflows investigation
Due 2027-28Pang
08TW101108 · uqEnvAct_INV4Investigation
Storm Overflows investigation
Chisledon storm tanks - Storm Overflows investigation at Chisledon storm tanks
Due 2027-28Cole (source to Lenta Brook)
08TW101108 · tzEnvAct_INV4Investigation
Storm Overflows investigation
Draycott Foliat- Storm Overflows investigation
Due 2027-28Ray (Wiltshire) source to Lydiard Brook
08TW101403 · bWFD_INV_N-TalInvestigation
N-TAL trials at Highworth STW
Highworth STW
Due 2027-28Highworth STW
08TW100210 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
Pang (Moor Copse) River Restoration Scheme
Due 2027-28Pang
08TW101108 · tkEnvAct_INV4Investigation
Storm Overflows investigation
PANGBOURNE WWTW- Storm Overflows investigation
Due 2027-28Sulham Brook
08TW100207 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
River Churn (South Cerney) River Restoration Scheme
Due 2027-28Churn (Baunton to Cricklade)
08TW100209 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
River Churn (U/s Cirencester) River Restoration Scheme
Due 2027-28Churn (Baunton to Cricklade)
08TW100208 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
River Coln (Fairford) River Restoration Scheme
Due 2027-28Coln (from Coln Rogers) and Thames (Coln to Leach)
08WW101000 · nvEnvAct_INV4Investigation
Storm overflows - Investigations
STATION ROAD SEWAGE PUMPING STATION
Due 2027-28Derry Brook
08TW101108 · acEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at ANDOVERSFORD STW
Due 2027-28Coln (Source to Coln Rogers)
08TW101108 · nmEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at Bracknell STW
Due 2027-28Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW101108 · arEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at CIRENCESTER STW
Due 2027-28Cerney Wick Brook (source to Thames)
08TW101108 · ghEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at HAMBLEDEN STW
Due 2027-28Thames (Reading to Cookham)
08TW101108 · bkEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at HAMPSTEAD NORREYS STW
Due 2027-28Pang
08TW101108 · egEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at KINGSTON MAIN SPS
Due 2027-28Thames (Egham to Teddington)
08TW101108 · bwEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at LITTLE MARLOW STW
Due 2027-28Thames (Reading to Cookham)
08TW101108 · ekEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at PORTSMOUTH ROAD, UXBRIDGE ROAD CSO
Due 2027-28Thames (Egham to Teddington)
08TW101108 · gwEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at SEVENHAMPTON VILLAGE STW
Due 2027-28Cole (Acorn Bridge to Bower Bridge)
08TW101108 · chEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at SLOUGH STW
Due 2027-28Roundmoor Ditch and Boveney Ditch
08TW101108 · ciEnvAct_INV4Investigation
Investigate the cause of the spills
Storm Overflows investigation at WINDSOR STW
Due 2027-28Thames (Cookham to Egham)
08TW100212 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
Tidmarsh Mill Fish Pass
Due 2027-28Pang
08TW100206 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
Unknown obstruction - Everington Fish Pass
Due 2027-28Pang
08TW100264 · aBW_INV2Investigation
Investigation of assets discharging into designated bathing water
Wallingford Beach Bathing Water Investigaiton
Due 2027-28Thames Wallingford to Caversham
08TW100189 · aWFD_INVInvestigation
Investigate the cause of the spills
WFD Investigation of in river Dissolved Oxygen to inform future action
Due 2027-28Key (Source to Thames)
08TW100183 · aWFD_INVInvestigation
Investigate the cause of the spills
WFD Investigation of in river Dissolved Oxygen to inform future action
Due 2027-28Cholsey Brook and tributaries
08TW100197 · aWFD_INVInvestigation
Investigate the cause of the spills
WFD Investigation of in river Dissolved Oxygen to inform future action
Due 2027-28Bydemill Brook (Source to Thames)
08TW100198 · aWFD_INVInvestigation
Investigate the cause of the spills
WFD Investigation of in river Dissolved Oxygen to inform future action
Due 2027-28Chalvey Ditches
08TW100214 · aWFD_INV_PHYSHABInvestigation
Undertake detailed feasibilty and design prior to AMP9 implementation
Whelford Mill Fish Pass
Due 2027-28Coln (from Coln Rogers) and Thames (Coln to Leach)
08TW100263 · aBW_IMP2Improvement
Improvement of assets discharging into designated bathing water
Wallingford Beach Bathing Water Improvement
Due 2028-29Thames Wallingford to Caversham
08TW100052 · eWFD_INV_CHEMInvestigation
Swindon STW
4e Emerging substances investigation – impact to the environment
Due 2029-30Ray (Wiltshire) source to Lydiard Brook
11TW100007 · aEnvAct_IMP3Improvement
Improvement of assets discharging into designated bathing water
Benson STW Storm Overflow improvement - Wallingford Beach Bathing Water
Due 2029-30Thames Wallingford to Caversham
08TW100012 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Bradfield Sports Centre Weir Fish Pass
Due 2029-30Pang
08TW100010 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Bradfield Weed Rack Fish Pass
Due 2029-30Pang
08TW100003 · aWFD_ND_WRFlowNo deterioration
Engineering solutions to enable reduction
Bradfield WTW sustainability reduction
Due 2029-30Pang
08TW104006 · aWFD_IMP_PHYSHABImprovement
Implement a river restorations schmeme to promote natural morphological processes
Chiltern Chalk Scarp habitat improvement measures
Due 2029-30Ewelme Stream (Source to Thames)
08TW100026 · aWFD_IMP_WRHMWBImprovement
Implement a river restorations schmeme to promote natural morphological processes
Datchet Common Brook River Restoration Scheme
Due 2029-30Datchet Common Brook
08TW100011 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Englefield Estate Weir Fish Pass
Due 2029-30Pang
08TW100024 · aWFD_IMP_PHYSHABImprovement
Implement a river restorations schmeme to promote natural morphological processes
Pang (Englefield Estate) River Restoration Scheme
Due 2029-30Pang
08TW100023 · aWFD_IMP_PHYSHABImprovement
Implement a river restorations schmeme to promote natural morphological processes
Pang (wetland at Hampstead Norreys) River Restoration Scheme
Due 2029-30Pang
08TW100014 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Pang at Bucklebury Fish Pass
Due 2029-30Pang
08TW100176 · aWFD_IMPmImprovement
Pangbourne STW Outfall Relocation
Reduce BOD loading
Due 2029-30Sulham Brook
08TW100469 · aWFD_ND_CHEM3No deterioration
Bracknell STW cypermethrin load standstill limit
Reduce cypermethrin loading
Due 2029-30Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100865 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Ascot STW
Reduce Phosphorus Loadings at Ascot STW
Due 2029-30Bull Brook
08TW100878 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Bracknell STW
Reduce Phosphorus Loadings at Bracknell STW
Due 2029-30Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100890 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Cirencester STW
Reduce Phosphorus Loadings at Cirencester STW
Due 2029-30Cerney Wick Brook (source to Thames)
08TW100908 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Henley STW
Reduce Phosphorus Loadings at Henley STW
Due 2029-30Thames (Reading to Cookham)
08TW101485 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at High Wycombe STW also known as High Wycombe Transfer
Reduce Phosphorus Loadings at High Wycombe STW
Due 2029-30Wye (High Wycombe fire station to Thames)
08TW100909 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Highworth STW
Reduce Phosphorus Loadings at Highworth STW
Due 2029-30Westrop Brook
09TW100040 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit at Little Marlow STW
Reduce Phosphorus Loadings at Little Marlow STW
Due 2029-30Thames (Reading to Cookham)
08TW100921 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Maidenhead STW
Reduce Phosphorus Loadings at Maidenhead STW
Due 2029-30Cut (Binfield to River Thames confluence) and Maidenhead Ditch
08TW100932 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Sherborne St John STW
Reduce Phosphorus Loadings at Sherborne St John STW
Due 2029-30Tuckmill Brook and tributaries
08TW100934 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Silchester STW
Reduce Phosphorus Loadings at Silchester STW
Due 2029-30Thames (Cookham to Egham)
08TW100935 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Slough STW
Reduce Phosphorus Loadings at Slough STW
Due 2029-30Roundmoor Ditch and Boveney Ditch
08TW100939 · aEnvAct_IMP1Improvement
0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Swindon STW
Reduce Phosphorus Loadings at Swindon STW
Due 2029-30Ray (Wiltshire) source to Lydiard Brook
08TW100015 · aWFD_IMP_PHYSHABImprovement
Implement a solution to make the impeding structure passable/easable to fish
Stanford Dingley Mill Fish Pass
Due 2029-30Pang
08TW100978 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: 1,044m of sewer relining, 66m3 storage, 0.43Ha SUDS IA Removal, 20m3 screen
Storm Overflows action at ANDOVERSFORD STW
Due 2029-30Coln (Source to Coln Rogers)
08TW100980 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 159m3 storage, 0.79Ha SUDS IA Removal, No screen required
Storm Overflows action at Briff Lane (Bucklebury) STW
Due 2029-30Pang
08TW100991 · aEnvAct_IMP2Improvement
Option C1: Solution in AMP 08: 467m of sewer relining, 57m3 storage, 0.19Ha SUDS IA Removal, No screen required
Storm Overflows action at CHAPEL ROW (Berks) STW
Due 2029-30Pang
08TW100998 · aENVAct_IMP2Improvement
Option C1: Investigation and Solution in AMP 8: FFT Equivalent, 314m3 storage, 3.11Ha SUDS IA Removal, 20m3 screen
Storm Overflows action at Compton (Berks) STW
Due 2029-30Pang
08TW101084 · aENVAct_IMP2Improvement
Option C2: 566m2 wetland equivalent treatment, . and 20m3 screen
Storm Overflows action at HAMBLEDEN STW
Due 2029-30Thames (Reading to Cookham)
08TW101012 · aENVAct_IMP2Improvement
Option C2: 603m2 wetland equivalent treatment, 0.85 Ha SUDS IA Removal, 33m3 storage - No screen required
Storm Overflows action at HAMPSTEAD NORREYS STW
Due 2029-30Pang
08TW101090 · aENVAct_IMP2Improvement
Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, No screen required
Storm Overflows action at SEVENHAMPTON VILLAGE STW
Due 2029-30Cole (Acorn Bridge to Bower Bridge)

153 of 153 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.