← Ne Storm Relief Shadwell, King Edward Mem Park

Spill evidence · River Hub

Ne Storm Relief Shadwell, King Edward Mem Park

Combined sewer overflow · TWL00658 · feeds LONDON (Becton STW)
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Tuesday, 1 October 2024
Started
1 Oct 2024, 15:48
Ended
1 Oct 2024, 17:28
Duration
1 hour 40 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
01/10/2024 (spill day)0 mmdry
30/09/20240 mmdry
29/09/20240 mmdry
28/09/20240.03 mmdry
27/09/20240.09 mmdry

River flow that day: 3.839 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
16 counted spills · 62 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00658). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.