← Ne Storm Relief Shadwell, King Edward Mem Park

Spill evidence · River Hub

Ne Storm Relief Shadwell, King Edward Mem Park

Combined sewer overflow · TWL00658 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Tuesday, 23 June 2026
Started
23 Jun 2026, 03:22
Ended
23 Jun 2026, 09:18
Duration
5 hours 56 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/06/2026 (spill day)0 mmdry
22/06/202618.97 mmrain
21/06/20260 mmdry
20/06/20260.26 mmrain
19/06/20260 mmdry

River flow that day: 0.841 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00658). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.