← Ne Storm Relief Shadwell, King Edward Mem Park
Spill evidence · River Hub
Ne Storm Relief Shadwell, King Edward Mem Park
Combined sewer overflow · TWL00658 · feeds LONDON (Becton STW)
Wet weather
The discharge
- Spill day
- Thursday, 22 February 2024
- Started
- 22 Feb 2024, 14:08
- Ended
- 22 Feb 2024, 23:29
- Duration
- 9 hours 21 minutes
- Receiving water
- Thames (Egham to Teddington)
- Parish
- —
Rainfall evidence
Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 22/02/2024 (spill day) | 10.89 mm | rain |
| 21/02/2024 | 4.74 mm | rain |
| 20/02/2024 | 2.51 mm | rain |
| 19/02/2024 | 0 mm | dry |
| 18/02/2024 | 0.01 mm | dry |
River flow that day: 22.217 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 9.4 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- No — the works was also overflowing that day.
- EA annual return (2024)
- 16 counted spills · 62 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00658). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.