← Ne Storm Relief Shadwell, King Edward Mem Park

Spill evidence · River Hub

Ne Storm Relief Shadwell, King Edward Mem Park

Combined sewer overflow · TWL00658 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Saturday, 6 July 2024
Started
6 Jul 2024, 01:22
Ended
6 Jul 2024, 04:24
Duration
3 hours 2 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
06/07/2024 (spill day)2.92 mmrain
05/07/202410.97 mmrain
04/07/20246 mmrain
03/07/20241.42 mmrain
02/07/20242.1 mmrain

River flow that day: 2.29 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
16 counted spills · 62 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00658). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.