← Sloane Street, Raneleigh Gardens

Spill evidence · River Hub

Sloane Street, Raneleigh Gardens

Combined sewer overflow · TWL00371 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Saturday, 24 October 2026
Started
24 Oct 2026, 22:18
Ended
25 Oct 2026, 01:02
Duration
2 hours 44 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/10/2026 (spill day)19.8 mmrain
23/10/20266.2 mmrain
22/10/202616.4 mmrain
21/10/20269.2 mmrain
20/10/20265.4 mmrain

River flow that day: 10.378 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00371). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.