← Crossness STW

Spill evidence · River Hub

Crossness STW

Storm overflow at the works · TWL00123 · feeds LONDON (Crossness STW)
Wet weather

The discharge

Spill day
Thursday, 23 October 2025
Started
23 Oct 2025, 01:00
Ended
23 Oct 2025, 04:00
Duration
3 hours
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Crossness) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/10/2025 (spill day)0 mmdry
22/10/202512 mmrain
21/10/20250 mmdry
20/10/20257.2 mmrain
19/10/20257.6 mmrain

River flow that day: 3.92 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2025)
13 counted spills · 85 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00123). Rainfall: EA Hydrology gauge f5fc1678-555b-4d8f-82fa-9a07a9da0987. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Crossness STW — River Thames Data