← Dartford Creek Storm

Spill evidence · River Hub

Dartford Creek Storm

Combined sewer overflow · TWL00150 · feeds LONDON (Long Reach STW)
Dry spill

Evidence strength

Low confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window

The discharge

Spill day
Saturday, 21 November 2026
Started
21 Nov 2026, 11:30
Ended
21 Nov 2026, 14:15
Duration
2 hours 45 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Danson Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/11/2026 (spill day)0.05 mmdry
20/11/20260 mmdry
19/11/20260.08 mmdry
18/11/20268.35 mmrain
17/11/20260.09 mmdry

River flow that day: 4.968 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00150). Rainfall: EA Hydrology gauge 48d0beea-7183-45d6-a8c7-cdee797a3c53. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.