← Benson STW

Spill evidence · River Hub

Benson STW

Storm overflow at the works · TWL00034 · feeds BENSON, HENLEY ROAD, BENSON, OX STW"
Dry spill

Evidence strength

High confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Wednesday, 10 January 2024
Started
10 Jan 2024, 06:34
Ended
14 Jan 2024, 04:38
Duration
3 days 22 hours
Receiving water
Thames Wallingford to Caversham
Parish
Benson

Rainfall evidence

Daily rainfall at the matched gauge (Benson) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
10/01/2024 (spill day)0 mmdry
09/01/20240 mmdry
08/01/20240 mmdry
07/01/20240 mmdry
06/01/20240 mmdry

River flow that day: 9.891 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Wallingford Beach, River Thames
Shellfish water
Not Applicable
EA annual return (2024)
101 counted spills · 1771 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00034). Rainfall: EA Hydrology gauge 1ad8ff76-625d-4ff1-82bd-9efcc5d41b2f_264254TP. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Benson STW — River Thames Data