← Sevenhampton STW

Spill evidence · River Hub

Sevenhampton STW

Storm overflow at the works · TWL00362 · feeds SEVENHAMPTON STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ⚠ Rain gauge ~29 km away — less representative

The discharge

Spill day
Saturday, 21 March 2026
Started
21 Mar 2026, 13:00
Ended
21 Mar 2026, 14:45
Duration
1 hour 45 minutes
Receiving water
Cole (Acorn Bridge to Bower Bridge)
Parish
Highworth

Rainfall evidence

Daily rainfall at the matched gauge (Abingdon) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
21/03/2026 (spill day)0 mmdry
20/03/20260 mmdry
19/03/20260 mmdry
18/03/20260 mmdry
17/03/20260 mmdry

River flow that day: 4.053 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 28.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00362). Rainfall: EA Hydrology gauge fe3efb87-062c-4880-9dc3-7dd8f335a6d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.