← Sevenhampton STW

Spill evidence · River Hub

Sevenhampton STW

Storm overflow at the works · TWL00362 · feeds SEVENHAMPTON STW
Wet weather

The discharge

Spill day
Friday, 6 September 2024
Started
6 Sept 2024, 07:30
Ended
6 Sept 2024, 11:00
Duration
3 hours 30 minutes
Receiving water
Cole (Acorn Bridge to Bower Bridge)
Parish
Highworth

Rainfall evidence

Daily rainfall at the matched gauge (Abingdon) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
06/09/2024 (spill day)1.71 mmrain
05/09/202417.67 mmrain
04/09/20241.33 mmrain
03/09/20240 mmdry
02/09/20240.35 mmrain

River flow that day: 2.961 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 28.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
135 counted spills · 2716 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00362). Rainfall: EA Hydrology gauge fe3efb87-062c-4880-9dc3-7dd8f335a6d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.