← Sevenhampton STW

Spill evidence · River Hub

Sevenhampton STW

Storm overflow at the works · TWL00362 · feeds SEVENHAMPTON STW
Wet weather

The discharge

Spill day
Sunday, 17 March 2024
Started
17 Mar 2024, 10:15
Ended
19 Mar 2024, 00:00
Duration
1 day 13 hours
Receiving water
Cole (Acorn Bridge to Bower Bridge)
Parish
Highworth

Rainfall evidence

Daily rainfall at the matched gauge (Abingdon) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/03/2024 (spill day)0.11 mmdry
16/03/20243.4 mmrain
15/03/20242.7 mmrain
14/03/20240.68 mmrain
13/03/20240.01 mmdry

River flow that day: 15.785 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 28.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
135 counted spills · 2716 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00362). Rainfall: EA Hydrology gauge fe3efb87-062c-4880-9dc3-7dd8f335a6d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.