← Friday Street (henley) pumping station

Spill evidence · River Hub

Friday Street (henley) pumping station

Pumping station overflow · TWL00191 · feeds HENLEY STW
Wet weather

The discharge

Spill day
Monday, 1 September 2025
Started
1 Sept 2025, 13:48
Ended
1 Sept 2025, 14:44
Duration
56 minutes
Receiving water
Thames (Reading to Cookham)
Parish
Henley-on-Thames

Rainfall evidence

Daily rainfall at the matched gauge (Reading University) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
01/09/2025 (spill day)3.46 mmrain
31/08/20250.08 mmdry
30/08/20252.75 mmrain
29/08/202510.32 mmrain
28/08/202512.22 mmrain

River flow that day: 1.055 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 11.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
4 counted spills · 10 h total
Monitor uptime (2025)
98% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00191). Rainfall: EA Hydrology gauge 0a37c7cf-0c60-4024-a5ef-b9c6c7c14600. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.