← Sw Storm Relief Sewer, London

Spill evidence · River Hub

Sw Storm Relief Sewer, London

Combined sewer overflow · TWL00400 · feeds LONDON (Crossness STW)
Wet weather

The discharge

Spill day
Tuesday, 12 March 2024
Started
12 Mar 2024, 09:54
Ended
13 Mar 2024, 09:10
Duration
23 hours 16 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
12/03/2024 (spill day)7.6 mmrain
11/03/20245 mmrain
10/03/20249.6 mmrain
09/03/20245.2 mmrain
08/03/20240 mmdry

River flow that day: 14.342 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
38 counted spills · 410 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00400). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.