← Andoversford STW

Spill evidence · River Hub

Andoversford STW

Storm overflow at the works · TWL00011 · feeds ANDOVERSFORD STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 100% operational that year
  • ⚠ Rain gauge ~50 km away — less representative

The discharge

Spill day
Wednesday, 6 March 2024
Started
6 Mar 2024, 09:00
Ended
7 Mar 2024, 01:15
Duration
16 hours 15 minutes
Receiving water
Coln (Source to Coln Rogers)
Parish
Andoversford

Rainfall evidence

Daily rainfall at the matched gauge (Osney Lock) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
06/03/2024 (spill day)0.04 mmdry
05/03/20240.01 mmdry
04/03/20240.26 mmrain
03/03/20240.06 mmdry
02/03/20240.17 mmdry

River flow that day: 11.549 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 49.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
129 counted spills · 2476 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00011). Rainfall: EA Hydrology gauge 5086b349-e04b-4f8e-b8f1-fa92b21078d0_256230TP. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.