← London Bridge

Spill evidence · River Hub

London Bridge

Combined sewer overflow · TWL00274 · feeds LONDON (Becton STW)
Dry spill

Evidence strength

Medium confidence
  • ✓ Dry across a 4-day antecedent window
  • ✓ Monitor 100% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Monday, 12 May 2025
Started
12 May 2025, 16:08
Ended
12 May 2025, 16:52
Duration
44 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Holland Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
12/05/2025 (spill day)0 mmdry
11/05/20250 mmdry
10/05/20250 mmdry
09/05/20250 mmdry
08/05/20250 mmdry

River flow that day: 2.031 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
7 counted spills · 4 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00274). Rainfall: EA Hydrology gauge 72bf626d-8710-47ca-8a5c-464388561754. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.