← Shrivenham STW

Spill evidence · River Hub

Shrivenham STW

Storm overflow at the works · TWL00368 · feeds SHRIVENHAM, SHRIVENHAM, SWINDON STW"
Dry spill

Evidence strength

Low confidence
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 100% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal
  • ⚠ Rain gauge ~25 km away — less representative

The discharge

Spill day
Friday, 11 October 2024
Started
11 Oct 2024, 12:15
Ended
11 Oct 2024, 13:00
Duration
45 minutes
Receiving water
Tuckmill Brook and tributaries
Parish
Watchfield

Rainfall evidence

Daily rainfall at the matched gauge (Abingdon) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
11/10/2024 (spill day)0.08 mmdry
10/10/20240.19 mmdry
09/10/20241.84 mmrain
08/10/20249.82 mmrain
07/10/20243.91 mmrain

River flow that day: 4.453 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 25.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
125 counted spills · 2130 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00368). Rainfall: EA Hydrology gauge fe3efb87-062c-4880-9dc3-7dd8f335a6d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.