← Bracknell STW

Spill evidence · River Hub

Bracknell STW

Storm overflow at the works · TWL00051 · feeds BRACKNELL, HAZELWOOD LANE, BINF STW"
Wet weather

The discharge

Spill day
Sunday, 25 January 2026
Started
25 Jan 2026, 08:30
Ended
26 Jan 2026, 03:15
Duration
18 hours 45 minutes
Receiving water
Cut (Binfield to River Thames confluence) and Maidenhead Ditch
Parish
Binfield

Rainfall evidence

Daily rainfall at the matched gauge (Bracknell) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/01/2026 (spill day)0 mmdry
24/01/20265.77 mmrain
23/01/20260.41 mmrain
22/01/20268.09 mmrain
21/01/202611.31 mmrain

River flow that day: 37.181 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00051). Rainfall: EA Hydrology gauge 68fd3385-553f-44cc-b69d-c94eafad4bf4. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Bracknell STW — River Thames Data