← Bracknell STW

Spill evidence · River Hub

Bracknell STW

Storm overflow at the works · TWL00051 · feeds BRACKNELL, HAZELWOOD LANE, BINF STW"
Wet weather

The discharge

Spill day
Tuesday, 10 February 2026
Started
10 Feb 2026, 09:30
Ended
12 Feb 2026, 05:15
Duration
1 day 19 hours
Receiving water
Cut (Binfield to River Thames confluence) and Maidenhead Ditch
Parish
Binfield

Rainfall evidence

Daily rainfall at the matched gauge (Bracknell) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/02/2026 (spill day)8.98 mmrain
09/02/20260.81 mmrain
08/02/20262.97 mmrain
07/02/20260.53 mmrain
06/02/20268.39 mmrain

River flow that day: 23.413 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00051). Rainfall: EA Hydrology gauge 68fd3385-553f-44cc-b69d-c94eafad4bf4. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.