← Greenwich pumping station & Storm pumping station

Spill evidence · River Hub

Greenwich pumping station & Storm pumping station

Pumping station overflow · TWL00203 · feeds LONDON (Crossness STW)
Wet weather

The discharge

Spill day
Sunday, 5 January 2025
Started
5 Jan 2025, 09:16
Ended
6 Jan 2025, 08:32
Duration
23 hours 16 minutes
Receiving water
Thames (Egham to Teddington)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Gascoigne Road) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
05/01/2025 (spill day)8.27 mmrain
04/01/202520.28 mmrain
03/01/20250.03 mmdry
02/01/20250 mmdry
01/01/20258.74 mmrain

River flow that day: 57.167 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
4 counted spills · 26 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00203). Rainfall: EA Hydrology gauge fff07329-3df5-45bc-915a-6e7274ece1f8. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.
Spill evidence — Greenwich pumping station & Storm pumping station — River Thames Data