← Upper Minety Flisteridge
Spill evidence · River Hub
Upper Minety Flisteridge
Pumping station overflow · WXW00433 · feeds MALMESBURY STW
No rain data
The discharge
- Spill day
- Saturday, 28 November 2026
- Started
- 28 Nov 2026, 22:08
- Ended
- ongoing
- Duration
- —
- Receiving water
- Swill Brook (source to Ashton Keynes)
- Parish
- Minety
Rainfall evidence
Daily rainfall at the matched gauge (Abingdon) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 28/11/2026 (spill day) | no data | |
| 27/11/2026 | 0.04 mm | dry |
| 26/11/2026 | 0 mm | dry |
| 25/11/2026 | 0 mm | dry |
| 24/11/2026 | 0 mm | dry |
River flow that day: —. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 49.2 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00433). Rainfall: EA Hydrology gauge fe3efb87-062c-4880-9dc3-7dd8f335a6d1. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Thames Data.